Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

WORKSHOP INSPECTION CHECKLIST

Qualification COMPUTER SYSTEMS SERVICING NC II


Practical Work/
JOVEMER V.
Area/Section Institutional Assessment In-Charge
AGUDO
Area
YES NO INSPECTION ITEMS
 1. Clean all tools before and after the activity.
2. Clean and arrange working tables according to floor

plan/lay-out; check stability.
 3. Clean and check floor, walls, windows, ceilings.
4. Clean and check work shop ventilation and illumination
 by dusting lamps/bulbs, replacing non-functional
lamps and keeping exhaust clean.
5. Clean and check unnecessary markings, dust; cables
 and plugs are in order; well-arranged; all items
functional.
 6. Clean, inspect air conditioning equipment.
 7. Clean, check and maintain Tool Room.
 8. Clean and check Rest Room.

 9. Clean and check wash area.

10. Clean and maintain work shop surroundings by


sweeping/ removing fallen leaves, branches, debris and

other refuse, impounded water, clearing pathways of
obstructions.

 11. Waste segregation is observed.


Remarks:
Well maintained workshop.
5 S is observed.
Inspected by:

FELGER G. TILOS. FEMT Unit


Date: May 1, 2024

You might also like