Professional Documents
Culture Documents
JHA 011 Install New Pelmet
JHA 011 Install New Pelmet
NBSB/MM/HSE/JHA/
011
JOB HAZARD ANALYSIS (JHA) WORKSHEET
Revision No.
000
1
Serial No. NBSB/MM/HSE/JHA/
011
JOB HAZARD ANALYSIS (JHA) WORKSHEET
Revision No.
000
1 Preparation 1.1 Wrong location as 1.1.1 To inform and discuss with PDB authorized personal before start work
-Application for PTW mention (P)
-Authorization to entry work area
-Pre-Job Briefing/ Tool Box 1.2 Unauthorized person at 1.2.1 To wear appropriate safety protective equipmentasrequired in PDB safety
briefing site (P) regulation and PTW
1.3 Execution work without 1.3.1 Work shall not commence without presence of RA and Valid PTW
authorization(P,A)
1.4 Using battery operated 1.4.1 Only authorized person shall be allowed for permit entry to the fenced/
device in HAC zone (P,E) cordoned area.
1.4.2 Using battery operated device within safezone
1.5 Crowded place (P) - 1.5.1 All workers to record temperature screening andattendance before
Exposed to entering PDB Project.
Covid-19 (P,R)
1.5.2 Cover mouth when coughing/sneezing withtissues or a flexed elbow.
2
Serial No. NBSB/MM/HSE/JHA/
011
JOB HAZARD ANALYSIS (JHA) WORKSHEET
Revision No.
000
2.1.4 Helmet chinstrap fasten & no loose items carried when at height
2.2 Working on height - 2.2.1 Only trained workers – undergone WAH training
erecting scaffold (P,A)
2.2.2 Tie off 100% of the time when wearing personal fall protection
equipment
2.2.3 Inspect personal fall protection equipment prior to and after each
use
2.4 Unsecure scaffold 2.4.1 Work from permanent work platforms provided with guardrails
platform (P,A) and toe boards
2.5 Scaffold collapse (P,A,R) 2.5.1 Erect scaffold as per approved standard
3
Serial No. NBSB/MM/HSE/JHA/
011
JOB HAZARD ANALYSIS (JHA) WORKSHEET
Revision No.
000
2.6 Scaffold imbalance 2.6.1 Outriggers of scaffolding should be tight and in good condition
/overload (P,A,R)
2.7 Scaffold parts & 2.7.1 All scaffold parts should be secured – competent person to verify
components
loosen (P,A,R)
2.7.2 Scaffold materials inspected before installed by erector
2.8 Access ladder (P,A) 2.8.1 The ladder inside should be incline installation (45° from base point).
2.9 Rupture or rusty scaffold 2.9.1 Scaffold components & frames inspected before bringing to the site
frame &
components(P,A,R)
2.9.2 Scaffold frame & equipment maintenance regimes
4
Serial No. NBSB/MM/HSE/JHA/
011
JOB HAZARD ANALYSIS (JHA) WORKSHEET
Revision No.
000
3 Pelmet installation 3.1 Muscular damage 3.1.1 Educate the workers to identify ergonomic hazards
resulting from
incorrect or
3.1.2 Provide Lifting Tips and Techniques for Manual Handling
excessive manual
handling. (P)
3.1.3 Use mechanical lifting equipment as required
3.3 Bad housekeeping (P,E,R) 3.3.1 Practice good housekeeping (remove obstruction in walkways,
passageways and exit routes).
4 Housekeeping and 4.1 Poor Housekeeping 4.1.1 Do routine housekeeping after complete activity.
isolate the working area (P,R)
5 Closed PTW 5.1 PTW has not been hand 5.1.1 Supervisor shall ensure PTW are closed and hand over after job
over or closed (P,A) completed
5
Serial No. NBSB/MM/HSE/JHA/
011
JOB HAZARD ANALYSIS (JHA) WORKSHEET
Revision No.
000
Sebagai Penyelia Kerja, dengan merujuk kepada JHA, saya telah mengadakan toolbox talk dan menerangkan kepada semua pekerja dan pihak berkaitan tentang:
• Skop kerja dan objektif tugasan.
• Hazad khusus kepada tugasan.
• Kawalan-kawalan keselamatan yang perlu diambil dan mengenalpasti individu-individu yang bertanggungjawab untuk melaksanakannya.
• PPE yang perlu digunakan dan memeriksa PPE pekerja untuk memastikan ia cukup dan sesuai untuk penggunaan.
No Name Designation / Position Department / Company Date Time Signature
1.
2.
Declaration: Workers / Relevant Party
As the Worker/relevant party, I have been briefed on the contents described in the JHA by the Work Supervisor/Leader. I understand and accept what has been briefed in the
toolbox talk and will ask my Supervisor if I am in doubt when executing the job. I shall exercise my Stop Work Authority if I cannot immediately address any hazards
that may endanger myself or others around me, and report to my Work Supervisor/Leader.
Sebagai pekerja/pihak berkaitan, saya telah diterangkan tentang isi kandungan JHA oleh Penyelia Kerja. Saya faham dan menerima apa yang diterangkan dalam toolbox talk dan akan bertanya
kepada Penyelia saya sekiranya ada keraguan semasa menjalankan tugas. Saya akan menguatkuasakan Stop Work Authority jika tidak dapat mengendalikan hazad yang boleh membahayakan saya atau
orang lain, dan melaporkan kepada Penyelia Kerja.
No Name Designation / Position Department / Company Date Signature
1.
2.
3.
4.
5.
6
Serial No. NBSB/MM/HSE/JHA/
011
JOB HAZARD ANALYSIS (JHA) WORKSHEET
Revision No.
000
6.
7.
8.