Republic of the Philippines

Province of Capiz
PROVINCIAL ENGINEER’S OFFICE
Lawa-an, Roxas City, Capiz
Email: capizpeo.cmgp@gmail.com
Telephone No.: (036) 620-0261

VARIATION ORDER
Variation Order No.: 1

Name of Project / Location: Proposed Construction of Perimeter Fence (Catmon Elementary School) at Brgy. Agkilo, Panitan, Capiz

To (Contractor) :
You are hereby directed to make herein described changes from the plans and specificationsof the following described work not included in the plans
and specifications.

Description of work to be done: Please see attached Itemized Cost of Revision

Reason for Change: This order was made due to ADDITION OF NEW ITEM AND DEDUCTIVE-ADDITIVE Works

Change Requested By: (Implementing agency)

(Work to be performed at agreed price)

ITEMIZED QUANTITIES AND COST OF REVISION IS SHOWN ON THE ATTACHED BILL OF QUANTITIES AND COST ESTIMATE

Difference in Cost due to this Change: 2,800,000.00


We undersigned Contractor have given careful consideration to the change proposed and hereby agree if this proposal is approved that Original Contract Amount : 2,800,000.00
we will provide all the equipment, furnish all materials except as maybe otherwise be noted and perform all services necessary for
work above specified and will accept as full payment thereto the prices shown on the second page of the attached sheet. Estimated Revised Contract Amount : -

Accepted By: Checked & Submitted By: Reviewed By:

Contractor: JESUS L. VERJES, JR. REDEN C. MARUCOT, MPA


Site Engineer Project-in-Charge

Authorized Officer Date:


(Contractor)
Recommended By: Approved By:
Date:
NELVA S. ADRICULA FREDENIL H. CASTRO
Provincial Engineer Governor

Date: Date:

Note : This VARIATION ORDER is not effective until approved


Republic of the Philippines
Province of Capiz
PROVINCIAL ENGINEER’S OFFICE
Lawa-an, Roxas City, Capiz
Email: capizpeo.cmgp@gmail.com
Telephone No.: (036) 620-0261

ITEMIZED COST OF REVISION


Variation Order No.: 1

PROJECT NAME: PROPOSED CONSTRUCTION OF PERIMETER FENCE (CATMON ELEMENTARY SCHOOL) AT BRGY. AGKILO, PANITAN, CAPIZ
LOCATION: PANITAN, CAPIZ
PROJECT DESCRIPTION: CONSTRUCTION / REPAIR

CONTRACTOR:

ORIGINAL ADDITIVE DEDUCTIVE VARIATION / CHANGE ORDER


ITEM NO. DESCRIPTION UNIT UNIT COST
QUANTITY AMOUNT(Php) QUANTITY AMOUNT(Php) QUANTITY AMOUNT(Php) QUANTITY % WT. AMOUNT(Php)
I. PROJECT BILLBOARD / SIGNBOARD lot 18,158.04 1.000 18,158.04
II. DEMOLITION lot 30,000.00 1.000 30,000.00
III. EARTHWORKS cu.m. 250.00 266.670 66,666.67
IV.A.a. CONCRETE WORKS AND FORMWORKS, Perimeter Fence Design 1, Footing cu.m. 13,525.06 6.480 87,642.42
IV.A.b. CONCRETE WORKS AND FORMWORKS, Perimeter Fence Design 1, Column cu.m. 41,949.56 4.050 169,895.73
IV.A.c. CONCRETE WORKS AND FORMWORKS, Perimeter Fence Design 1, Tie Beam cu.m. 55,620.89 2.060 115,802.70
IV.B.a. CONCRETE WORKS AND FORMWORKS, Perimeter Fence Design 2, Column Footing cu.m. 12,073.72 21.600 260,792.40
IV.B.b. CONCRETE WORKS AND FORMWORKS, Perimeter Fence Design 2, Column cu.m. 30,829.71 13.500 416,201.10
IV.B.c. CONCRETE WORKS AND FORMWORKS, Perimeter Fence Design 2, Tie Beam cu.m. 35,526.57 9.000 319,739.10
V.A. MASONRY WORKS, Perimeter Fence Design 1 sq.m. 1,449.37 48.580 70,410.36
V.B. MASONRY WORKS, Perimeter Fence Design 2 sq.m. 1,410.96 450.000 634,931.10
VI.a. STEELWORKS, Front Gate lm 11,047.18 5.000 55,235.88
VI.b. STEEL WORKS, Perimeter Fence Design 1 lm 5,211.99 34.700 180,855.90
VII. PAINTING WORKS lot 102,775.50 1.000 102,775.50
VIII. TILEWORKS sq.m. 3,018.81 48.000 144,893.10
IX. FUEL l 80.00 1,575.000 126,000.00
NEW ITEM

GRAND TOTAL 2,800,000.00 - - 0.00% -

Difference in Cost due to this Changes: 2,800,000.00


Original Contract Amount: 2,800,000.00
Estimated Revised Contract Amount: 0.00

Accepted By: Checked and Submitted: Reviewed By: Recommended By: Approved By:

0 JESUS L. VERJES, JR. REDEN C. MARUCOT, MPA NELVA S. ADRICULA FREDENIL H. CASTRO
(Authorized Officer) Site Engineer Project-in-Charge Provincial Engineer Governor
(Contractor)

Date: Date: Date: Date: Date:


III. EARTHWORKS
Earthfill for Excavated Foundations
Mark Quantity Width (m) Depth (m)
Column Footing
Wall Footing

IV.A.a. CONCRETE WORKS AND FORMWORKS, Perimeter Fence Design 1, Footing


Mark Quantity Width (m) Depth (m)
Column Footing

IV.A.b. CONCRETE WORKS AND FORMWORKS, Perimeter Fence Design 1, Column


Mark Quantity Width (m) Depth (m)
Column

IV.A.c. CONCRETE WORKS AND FORMWORKS, Perimeter Fence Design 1, Tie Beam
Mark Quantity Width (m) Depth (m)
Tie Beam

IV.B.a. CONCRETE WORKS AND FORMWORKS, Perimeter Fence Design 1, Footing


Mark Quantity Width (m) Depth (m)
Column Footing

IV.B.b. CONCRETE WORKS AND FORMWORKS, Perimeter Fence Design 1, Column


Mark Quantity Width (m) Depth (m)
Column

IV.B.c. CONCRETE WORKS AND FORMWORKS, Perimeter Fence Design 1, Tie Beam
Mark Quantity Width (m) Depth (m)
Tie Beam

V.A. MASONRY WORKS, Perimeter Fence Design 1


Mark Quantity Wall Width (m) Column Width
Wall 1

V.B. MASONRY WORKS, Perimeter Fence Design 2


Mark Quantity Wall Width (m) Column Width
Wall 2
VIII. TILEWORKS
Mark Quantity Column Width (m) Column Depth (m)
Wall 1
Length (m) Area (sq.m.) Volume (cu.m.)
0 0
0 0
Total Volume 0

nce Design 1, Footing


Length (m) Area (sq.m.) Volume (cu.m.)
0 0
Total Volume 0

nce Design 1, Column


Height (m) Area (sq.m.) Volume (cu.m.)
0 0
Total Volume 0

nce Design 1, Tie Beam


Height (m) Area (sq.m.) Volume (cu.m.)
0 0
Total Volume 0

nce Design 1, Footing


Length (m) Area (sq.m.) Volume (cu.m.)
0 0
Total Volume 0

nce Design 1, Column


Height (m) Area (sq.m.) Volume (cu.m.)
0 0
Total Volume 0

ce Design 1, Tie Beam


Height (m) Area (sq.m.) Volume (cu.m.)
0 0
Total Volume 0

Net Width (m) Wall Height (m) Area (sq.m.)


0 0
Total Area 0

Net Width (m) Wall Height (m) Area (sq.m.)


0 0
Total Area 0
CHB Thickness + Platering (m) Covered Perimeter (m) Wall Height (m) Area (sq.m.)
0 0
Total Area 0