Professional Documents
Culture Documents
S14 - Insulators 01 07 2021 Draft Final
S14 - Insulators 01 07 2021 Draft Final
S14 - Insulators 01 07 2021 Draft Final
SPECIFICATION S14
INSULATORS
JUNE 2021
0
Specification S14 – Insulator
Checked by:
Approved by:
0
Specification S14 – Insulator
Table of Contents
1 SCOPE ...................................................................................................................................................1
2 APPLICABLE STANDARDS .................................................................................................................1
3 SERVICE CONDITIONS ........................................................................................................................3
4 SYSTEM CHARACTERISTICS .............................................................................................................3
5 TECHNICAL SPECIFICATIONS ...........................................................................................................3
5.1 PIN INSULATORS ..........................................................................................................................4
5.2 STRAIN INSULATORS ...................................................................................................................6
5.3 LINE POST INSULATORS - HORIZONTAL STYLE .......................................................................9
5.4 LINE POST INSULATORS - VERTICAL STYLE .......................................................................... 12
5.5 SHACKLE INSULATORS AND BOBBIN INSULATORS.............................................................. 15
5.6 STAY INSULATORS .................................................................................................................... 16
6 QUALITY ASSURANCE ..................................................................................................................... 19
7 INSPECTION AND TESTING ............................................................................................................. 19
7.1 INSPECTION ................................................................................................................................... 19
7.2 TESTING ........................................................................................................................................ 19
7.3 TEST CERTIFICATES ................................................................................................................. 24
8 MARKING ........................................................................................................................................... 25
9 SPARE PARTS ................................................................................................................................... 25
10 WARRANTY ....................................................................................................................................... 25
11 PACKING AND SHIPPING ................................................................................................................. 26
11.1 PACKING ..................................................................................................................................... 26
11.2 SHIPPING .................................................................................................................................... 27
11.3 HAZARDOUS SUBSTANCES .............................................................................................................. 27
12 SUBMITTALS ..................................................................................................................................... 28
12.1 SUBMITTALS REQUIRED WITH THE BID.............................................................................................. 28
12.2 SUBMITTALS REQUIRED AFTER CONTRACT AWARD AND DURING DELIVERY ...................................... 28
13 SCHEDULES ...................................................................................................................................... 30
13.1 TECHNICAL DATA SCHEDULE: 11KV PIN INSULATORS....................................................................... 30
13.2 TECHNICAL DATA SCHEDULE: 33KV PIN INSULATORS....................................................................... 31
13.3 TECHNICAL DATA SCHEDULE: PORCELAIN STRAIN INSULATORS ........................................................ 32
13.4 TECHNICAL DATA SCHEDULE: POLYMERIC STRAIN INSULATORS........................................................ 34
13.5 TECHNICAL DATA SCHEDULE: 11KV LINE POST INSULATORS HORIZONTAL STYLE ............................. 35
13.6 TECHNICAL DATA SCHEDULE: 33KV LINE POST INSULATORS HORIZONTAL STYLE ............................. 36
13.7 TECHNICAL DATA SCHEDULE: 11KV PILOT POST INSULATORS VERTICAL STYLE ................................ 37
13.8 TECHNICAL DATA SCHEDULE: 33KV PILOT POST INSULATORS VERTICAL STYLE ................................ 38
13.9 TECHNICAL DATA SCHEDULE: SHACKLE INSULATORS ....................................................................... 39
13.10 TECHNICAL DATA SCHEDULE: BOBBIN INSULATORS ...................................................................... 40
13.11 TECHNICAL DATA SCHEDULE: STAY INSULATORS ......................................................................... 41
13.12 NON COMPLIANCE SCHEDULE ..................................................................................................... 42
13.13 TEST CERTIFICATES SCHEDULE .................................................................................................. 43
i
Specification S14 – Insulators
List of Figures
List of Tables
ii
Specification S14 – Insulator
1 SCOPE
This specification covers the design, manufacture, testing, supply, delivery and
performance requirements of pin, disc, strain, line post, shackle, bobbin and stay
insulators use in the distribution networks of Tanzania Electric Supply Company
Limited. It lays down minimum requirements for purchasing MV and LV insulators to
be used by the Company.
It shall be the responsibility of the supplier to ensure adequate of the design, good
engineering practices, adherence to the specification and applicable standards and
regulations as well as good workmanship in the manufacture of the item. This
specification does not include all necessary provisions of the contract.
Any departure from the provisions of this specification shall be disclosed at the time
of tendering in the Non-compliance schedule.
2 APPLICABLE STANDARDS
The following standard was referred to in the preparation of this specification: -
ESI 43-91: Stay strands and stay fittings for overhead lines
1
Specification S14 – Insulators
2
Specification S14 – Insulators
3 SERVICE CONDITIONS
The service conditions shall be as follows:
i. Altitude (above sea level) 1,600m
ii. Maximum outdoor temperature 40°C
iii. Minimum outdoor temperature -1°C
iv. Maximum monthly mean temperature 35°C
v. Annual mean temperature 25°C
vi. Maximum relative humidity up to 96%
vii. Type of atmosphere coastal
viii. Pollution Design pollution level to be taken as
“Heavy” (pollution level III) according to
IEC 60815
4 SYSTEM CHARACTERISTICS
The Hydraulic Digger Derrick shall be suitable for use in MV and LV Distribution
networks with the following characteristics:
SNo Description 33kV 11kV LV
i. Nominal System Voltages: kV 33 11 0.4/0.23
ii. Maximum system voltages: kV 36 12 0.44/0.253
iii. System Fault level: kA 25 25 7.5
iv. Insulation Level 1.2/50ms lightning impulse 170 75 12
withstand voltage: kV
Insulation Level 1.2/50ms lightning impulse 250 110 45
withstand voltage for Steep Wave: kV
v. Power Frequency (one minute withstand, wet): kV 70 28 3
5 TECHNICAL SPECIFICATIONS
This specification covers the design, manufacture, testing, supply, delivery and
performance requirements of the pin insulators, strain/disc insulators, line post
insulators, shackle insulators, bobbin insulators and stay insulators required by the
33kV, 11kV and LV lines in Tanzania Electric Supply Company Limited (TANESCO).
3
Specification S14 – Insulators
The type of insulators described in this specification are intended to maintain the
general look of the existing networks and to take advantage of the familiarity of the
TANESCO's staff with these type of units.
Wherever polymeric insulators are offered, the bidder shall clearly state the housing
material and percentage composition of each material used.
5.1.2 Materials
The materials to manufacture insulators shall be polymers and silicone rubber.
However, porcelain brown glazed insulators may be used.
4
Specification S14 – Insulators
Ferrous parts, unless of stainless steel, shall be hot dip galvanized in accordance
with BS 729, with the exception of cotter pins which shall be galvanized using the
methods of BS 729, but with a coating mass of 500g/sq m. For polymeric insulators
the stud should be of stainless steel or hot dip galvanized.
5.1.5 Dimensions
The insulator shall conform to the dimensions and tolerances in accordance with the
figure 1(a) and 1(b) for 11kV and 33kV porcelain insulator respectively which shall
accompany the bid documents.
5
Specification S14 – Insulators
80kN 80kN
Specified Mechanical Load (SML)
44.5kN 44.5kN
Proof Test for 10 seconds
7.5kV 7.5kV
Radio interference: 50Hz applied voltage
6
Specification S14 – Insulators
ii) The following performance levels shall be met for porcelain & glass:
5.2.2 Materials
The materials to manufacture insulators shall be polymers and silicone rubber.
However, porcelain brown glazed insulators may be used.
7
Specification S14 – Insulators
5.2.5 Dimensions
The strain insulator shall conform to the dimensions and tolerances in accordance
with Figure 2 which shall accompany the bid documents.
8
Specification S14 – Insulators
5.3.2 Materials
TANESCO is used to porcelain brown glazed insulators but has a strong preference
for polymeric insulators with a proven track record. However, among polymeric
insulators, Silicone rubber composite insulators are preferred compared to others.
The bidder who offers insulators manufactured from insulating materials other than
porcelain, such as polymeric materials, shall give full particulars of such materials,
including long term weathering and tensile tests, and evidence of experience under
practical conditions.
9
Specification S14 – Insulators
10
Specification S14 – Insulators
Figure 5: Horizontal Base Mounting Bracket for 11kV & 33kV Insulators
11
Specification S14 – Insulators
5.3.4 Dimensions
The Supplier/Manufacturer shall guarantee that the dimensions and tolerances of the
insulator offered are in accordance with the drawing, which shall accompany the bid
documents.
12
Specification S14 – Insulators
5.4.1 Materials
TANESCO is used to porcelain brown glazed insulators but has a strong preference
for polymeric insulators with a proven track record. However, among polymeric
insulators, Silicone rubber composite insulators are preferred compared to others.
The bidder who offers insulators manufactured from insulating materials other than
porcelain, such as polymeric materials, shall give full particulars of such materials,
including long term weathering and tensile tests, and evidence of experience under
practical conditions.
i) Base Fitting:
The base fitting, stud shall be made of malleable cast iron in conformity with BS
6681 or equivalent and galvanized in conformity with BS 729. The base fittings
shall be manufactured according to BS 3288 part 1 and its performance shall be
in conformity to BS 3288 part 2. The base fittings, that is studs shall be mounted
directly on the pilot post insulator and thus supplied together. The studs shall be
139.7mm long, 22.2 mm in diameter and shall have a minimum mechanical failing
load of 10KN.
13
Specification S14 – Insulators
ii) Insulator:
The insulators shall be manufactured with brown glazed porcelain or Silicone
rubber material. In case of Silicone rubber material, the bidder shall offer the
desirable toughness and resistance to tracking, with the hydrophobic
characteristics derived from low molecular weight silicone oils. Also the insulator
shall be suitable for washing by all known methods in current use.
The manufacturer shall also use several tests to evaluate the material such as
tracking, Ultraviolet, corona cutting, salt fog, oxidative stability and variations of
differential thermal analysis tests to assure the quality of insulator material.
5.4.3 Dimensions
The bidder shall guarantee that the dimensions and tolerances of the insulator offered
are in accordance with the drawing, which shall accompany the bid documents.
14
Specification S14 – Insulators
Shackle Bobbin
Insulators Insulators
Wet 50Hz Withstand Voltage 3 kV 3 kV
Dry Flashover 25 kV 17 kV
Wet Flashover 12 kV 9 kV
5.5.2 Materials
Materials used for shackle and bobbin insulators shall be porcelain brown glazed. The
surface of the insulators shall be perfectly smooth and free from all defects and cracks.
5.5.3 Dimensions
The main overall required dimensions are:
Table 7: Dimensions of Shackle and Bobbin Insulators
The groove radius should be sufficient to accommodate wasp conductor, and the PVC
covered 100mm2 AAC conductor offered, against TANESCO specification S16: Bare
and PVC covered conductors. Figure 9 and 10 illustrates the typical Shackle and
Bobbin Insulators respectively.
15
Specification S14 – Insulators
Figure 11 illustrates typical 0.4kV, 11kV and 33kV Stay Insulators (all dimensions
are in mm).
17
Specification S14 – Insulators
18
Specification S14 – Insulators
5.6.3 Dimensions
The bidder shall guarantee that the dimensions and tolerances of the insulators
offered are in accordance with the drawing, which shall accompany the bid
documents.
6 QUALITY ASSURANCE
The manufacturer shall possess ISO 9001 or latest Quality Assurance Certification
for the manufacture of Hydraulic Digger Derrick. Bidder shall furnish a copy of the
ISO certificate certified as true copy of the original by the manufacturer.
7.1 Inspection
The manufacturer/supplier shall submit a detailed programme covering the design,
manufacture and testing of the insulator within one month of receipt of the contract
award. Reports shall subsequently be submitted at intervals, outlining progress and,
if necessary, explaining deviations from the programme.
TANESCO’s representatives shall have free entry at all times, while work on the
contract is being performed, to all parts of the manufacturer's works which concern
the processing of the equipment ordered. The manufacturer shall afford the
TANESCO’s representatives, without charge, all reasonable facilities to satisfy
themselves that the equipment being furnished is in accordance with this
specification.
7.2 Testing
The insulator shall successfully pass all the type, sample and routine tests listed in
the most recent edition of the standards given in clause 2 of this specification.
19
Specification S14 – Insulators
20
Specification S14 – Insulators
21
Specification S14 – Insulators
22
Specification S14 – Insulators
23
Specification S14 – Insulators
24
Specification S14 – Insulators
8 MARKING
All insulators shall be clearly marked with the following markings. These markings
shall be legible and indelible. The markings may be printed or impressed, provided
such impressions do not impair the performance of the insulator. Markings shall be
applied before firing.
i) Name or Trademark of the Manufacturer
ii) Year of Manufacture.
iii) TANESCO's Logo
iv) Mechanical Load in kN
9 SPARE PARTS
The bid shall include, if any, a comprehensive list of all consumable and non-
consumable spare parts and accessories, necessary for five years of normal
operation as specified by the manufacturer.
In addition, the bid shall include, if any, in price schedule of this bidding document,
a price list of recommended non consumable spare parts for all major items of
equipment.
The bidder shall give an assurance that spare parts, if any, will continue to be
available through the life of the equipment.
The spare parts, if any, shall be clearly identified and related to the specific
equipment item. Spare parts, should they be required, shall be delivered suitably
packed and treated for long periods in storage. Each pack shall be clearly and
indelibly marked with its contents, including a designation number corresponding to
the spare parts list in the operation and maintenance instructions. All spare parts, if
any, shall be stored in the TANESCO designated stores.
10 WARRANTY
Warranty period shall be twelve (12) months commencing on the date of acceptance
by the purchaser and shall include all parts and labour.
25
Specification S14 – Insulators
11.1 PACKING
All equipment, including accessories, shall be packed and securely clamped against
movement in robust, wooden, non-returnable packing cases to ensure safe transit
from the manufacturer's works to the work sites.
The packing shall provide suitable protection against all climatic conditions prevailing
during transport and on site. Equipment or material liable to deterioration by sea water,
moisture, or ingress of foreign matter shall be totally sealed in strong polythene bags.
All accessories shall be carefully packed so that they are fully protected during
transport and handling operations and in storage.
Internal surfaces of loose accessories shall be sealed off by means of gaskets and
blanking off plates. Equipment and surfaces liable to deterioration due to condensation
shall be protected by packs of silica gel or other approved desiccant.
Each packing case shall be indelibly marked, in two adjacent sides and on the top,
with the following:
i) Individual serial number;
ii) Client's name, that is: Tanzania Electric Supply Company Limited;
iii) Contract number;
iv) Contractor’s name;
v) Name and address of contractor's agent in Tanzania;
vi) Manufacturer's name;
vii) Description of contents;
viii) Country of origin;
ix) Case measurements;
x) Gross and net weights in kilogrammes; and
xi) All necessary slinging and stacking instructions.
Each case shall contain a fully detailed packing list in a sealed waterproof envelope.
Five copies of each packing list shall be sent to TANESCO prior to dispatching the
equipment.
26
Specification S14 – Insulators
11.2 SHIPPING
The supplier shall be responsible for the shipping of all plant and equipment supplied
from abroad to the ports of entry and for the transport of all goods to TANESCO
designated Stores and for all the costs and expenses resulting from it in accordance
with INCOTERM specified.
All transport accessories, such as riding lugs, jacking pads, blanking off plates, etc.
shall become the property of TANESCO.
All items of equipment shall be securely clamped against movement to ensure safe
transit from the manufacturer's facilities to the work sites.
All accessories shall be carefully packed so that they are fully protected during
transport and handling operations and while in storage.
The supplier shall advise, if requested, the storage required for any plant and
equipment that may be delivered to the TANESCO stores. The supplier shall be
required to accept responsibility for the advice given, in so far as these
arrangements may have a bearing on the behaviour of the equipment in subsequent
service.
The manufacturer/supplier shall also be responsible for any injuries resulting from
hazardous substances.
27
Specification S14 – Insulators
12 SUBMITTALS
In addition to the tender documentation, some technical documentation is required
as set out in clauses 12.1 and 12.2 below.
28
Specification S14 – Insulators
29
Specification S14 – Insulators
13 SCHEDULES
Manufacturer Specify
Thimble Specify
Cement Specify
30
Specification S14 – Insulators
Portland
Cement
Cement
Type of Semiconducting Glaze Specify
31
Specification S14 – Insulators
Cement Metal
Type and Grade of Material: Cap Metal
Pin Metal
Coupling Pin Metal
Locking Key Metal
Cement Specify
Grade of Material in Polymeric Insulators: N/A
Housing and Sheds N/A
Core N/A
Metal Fittings N/A
N/A
Locking Key
N/A
Coupling Pin
32
Specification S14 – Insulators
33
Specification S14 – Insulators
34
Specification S14 – Insulators
13.5 Technical Data Schedule: 11kV Line Post Insulators Horizontal Style
35
Specification S14 – Insulators
13.6 Technical Data Schedule: 33kV Line Post Insulators Horizontal Style
36
Specification S14 – Insulators
13.7 Technical Data Schedule: 11kV Pilot Post Insulators Vertical Style
37
Specification S14 – Insulators
13.8 Technical Data Schedule: 33kV Pilot Post Insulators Vertical Style
Manufacturer Specify
Thimble N/A
Portland
Cement
Cement
Type of Semiconducting Glaze N/A
Identification Markings:
Manufacturer's name or trademark Specify
38
Specification S14 – Insulators
39
Specification S14 – Insulators
40
Specification S14 – Insulators
…………………………………..... …………………
Signature and seal of the Manufacturer Date
I/We certify that the above data are true and correct
…………………………………. ……………………
Signature and seal of the Bidder Date
41
Specification S14 – Insulators
Clause Non-Compliance
No.
…………………………………............... …………………
Signature and seal of the Manufacturer Date
I/We certify that the above data are true and correct
…………………………………… …………………
Signature and seal of the Bidder Date
42
Specification S14 – Insulators
…………………………………................ …………………
Signature and seal of the Manufacturer Date
I/We certify that the above data are true and correct
……………………………………. …………………
Signature and seal of the Bidder Date
43
Specification S14 – Insulators
44