Professional Documents
Culture Documents
Project Proposal
Project Proposal
Project Proposal
Grade: 6
Automated Response:
Under control of the circuit, this servo motor allows the bridge model to autonomously react
to any threats detected on its path. Thus, it underscores how automation can be utilized as a
means of managing infrastructure and safeguarding vital structures.
Public Safety:
By avoiding floodwater on the bridge, this circuit enhances public safety. This keeps the
bridge from collapsing, thus reducing risks of accidents or disruptions caused by floods.
In conclusion:
This intriguing project demonstrates how technology can be applied practically whilst
dealing with real-life challenges like preventing floods on bridges. The heart of this
undertaking rests on a smart bridge model fitted with an embedded circuit that acts
proactively towards managing and addressing any impacts of floods. By doing so, we gain all-
around practical experience in flooding prevention as well as toll tax management touching
various fields of STEM (Science, Technology, Engineering, Mathematics).