Professional Documents
Culture Documents
OPIc - IM8 Home Improvement Projects
OPIc - IM8 Home Improvement Projects
Model Answer
The most recent home project was to fix the old bathroom.
The toilet was old and cracked so we had to replace it with a new one.
In addition, we changed the lower pipe of the wash stand which was often clogged.
The light has also been replaced with a power saving LED bulb.
Everything was done quickly and perfectly, as the repairman was good at his job.
It cost a lot but I felt so good to see the clean bathroom after everything.
There are always problems to fix in any home. Please tell me about an experience
when you did a home improvement project.
And explain to me how things changed before and after that project.
Model Answer
It was last summer when rain was pouring.
Suddenly, rain water leaked into my bedroom and I found that the window frame was
old and
cracked. I had to replace it, but I was worried about the cost. Fortunately, one
friend of mine gave me a good tip.
My friend recommended I use a special glue that sticks only to cracked areas and it
worked like magic.
Since then, the glue has been used in many ways to fix my house.
In the middle of a home improvement project, you can face difficulties.
Tell me about some problems or issues that can happen in the process of a project.
Model Answer
The biggest problem when repairing a house is spending more money than you
initially thought.
I don't know why, but every time I do a house repair project, I think there is
always
a difference between my budget and the actual cost.
During my last house repair project, I had a problem with my contractor because of
additional
costs. I could not stop the project, so I had the work completed.
However, I wasn't happy with the situation.
When you have done a home improvement project, how did you go through the process?
Please introduce each of the steps you took from beginning to end.
Model Answer
When I am doing a home improvement project, the first thing I do is to call several
companies
and get estimates.
After comparing them, I choose the company that gave the most reasonable estimate.
Later, the project schedule is adjusted and the construction starts.
I tend to leave everything to my contractor.
The final step is to examine carefully whether I like the results or not, and then
I pay.
You might have had a home improvement project before.
I also had an experience of doing a home improvement project. Please ask me several
questions about that.