NAME OF WORK :- ESTIMATE FOR CONSTRUCTION OF PIPE CULVERT AT KM. 0.875 OF PURANI JHARO MINOR
BILL OF QUANTITY
SL. NO. Description Length width Height
1 x 1 16.00 10.00
TOTAL
2 Earth work in excavation of foundation in all types
of soil including all leads and lifts, labour charges,
T& P etc. required for proper completion of work
and its disposal as per direction of Engineer-in-
charge.
1 x 8 2.50
Total
7 Providing and fixing PVC Pipe 100mm in drainage
spout & weep hole including cost of all materials,
labours, T&P etc, required for proper
completion of work.
2 x 5 1.310
Total
8 Supplying and laying Local sand on Top of pipe
including cost of all materials, labour, T&P etc.
required for proper completion of work.
Total
1 x 60
Total
11 Providing /Arrangement of Beldar for super vision
and helping of supervisor including cost of all labour
& T&P etc required for proper
completion of work.
1 x 60
Total
12 Testing of material and cubes for quality control
purpose by third party including cost of carriage fees
etc.
1 x 1
Total
J.E AE
UR
ANI JHARO MINOR
Quantity Unit
160.00 sqm
160.00 sqm
795.39 cum
795.386 cum
8.744 cum
72.068 cum
1.260 cum
-2.173 cum
23.025 cum
-21.907 cum
0.135 cum
81.153 cum
81.153 cum
4.16 sqm
48.05 sqm
41.33 sqm
34.14 sqm
0.60 sqm
42.25 sqm
0.60 sqm
171.13 sqm
177.12 R.M
164.00 R.M
205.92 R.M
164.00 R.M
9.00 R.M
720.04 R.M
444.98 KG
0.445 MT
20.00 RM
20.00 RM
13.100 RM
13.100 RM
158.72 cum
36.51 cum
195.23 cum
300.00 Hours
300.00 Hours
60.00 day
60.00 day
60.00 day
60.00 day
1.00 Job
1.00 Job