KANHAR NAHAR PARIYOJANA KHAND -6 MIRZAPUR

NAME OF WORK :- ESTIMATE FOR CONSTRUCTION OF PIPE CULVERT AT KM. 0.875 OF PURANI JHARO MINOR

BILL OF QUANTITY
SL. NO. Description Length width Height

1 Site Clearence for constructing stream including all


leads and lifts, labour charges, T& P etc. required
for proper completion of work and its disposal as per
direction of Engineer-in-charge.

1 x 1 16.00 10.00
TOTAL
2 Earth work in excavation of foundation in all types
of soil including all leads and lifts, labour charges,
T& P etc. required for proper completion of work
and its disposal as per direction of Engineer-in-
charge.

I) D/S & U/S 1 x 1 16.000 8.018 6.200


Total

3 Laying C.C. 1:2:4 (M–15) in raft with cement, coarse


sand of F.M. not less than 2.00 and hard stone ballast as
obtained from the excavation of foundation including
cost of all material, labour, T&P etc. required for
proper completion of work.

Abutment foundation 2 x 1 3.470 4.200 0.300


Abutment up to Top 2 x 1 (3.17+.30)/2 4.200 4.945
Abutment straight portion 2 X 1 0.300 4.200 0.500
Deduction of pipe encasing -2 x 1 1.740 1.090 1.090
Pipe encasing 1 x 1 1.090 19.380 1.090
Deduction of pipe -1 x 1 3.14x0.60x0.60x19.38
Rcc piller guard at road level 2 x 3 0.75 0.20 0.15
Total
Total

4 Centering & shuttering for C.C. work in


different parts of structure as below including cost
of all materials, labour, T&P etc. required for proper
completion of work.

Abutment D/S & U/S


pcc levelling base 2 x 2 3.47 0.30
Inclined face 1 x 2 5.72 4.20
vertical face 1 x 2 4.92 4.20
side face 2 x 2 (3.17+0.30)/2 4.92
2 x 2 0.30 0.50
Pipe encasing 2 x 1 19.38 1.09
Rcc piller guard above to GL 1 x 4 0.20 0.75
Total
5 Carriage, Cutting, Bending, Binding and placing steel
for reinforcement with cost of binding wire
including cost of all materials, labour, T&P etc. required
for proper completion of work.

Abutment D/S & U/S


Vertical face
vertical bar 10 mm dia 2 x 18 4.92
Transverse bar 10 mm dia 2 x 20 4.10
Inclined face
vertical bar 10 mm dia 2 x 18 5.72
Transverse bar 10 mm dia 2 x 20 4.10
Rcc piller guard 2 x 6 0.75
Total
total weight of 10 mm dia @0.618kg/m=720.04x0.618=
Total
6 Providing and fixing 600mm. Dia NP-2 Pipe
including cost of all materials, labours, T&P etc,
required for proper completion of work.

1 x 8 2.50
Total
7 Providing and fixing PVC Pipe 100mm in drainage
spout & weep hole including cost of all materials,
labours, T&P etc, required for proper
completion of work.

2 x 5 1.310
Total
8 Supplying and laying Local sand on Top of pipe
including cost of all materials, labour, T&P etc.
required for proper completion of work.

Below pipe 1 x 1 4.20 19.38 1.95


above pipe encasing 1 x 1 3.14 19.38 0.6
Total
9 Dewatering by 5 H.P. Diesel pump of foundation
including cost of dewatering equipment, and its
accessories, required material, labour etc.

Total

10 Providing /Arrangement of Supervisor for


super vision of site including cost of all labour & T&P
etc required for proper completion of work.

1 x 60
Total
11 Providing /Arrangement of Beldar for super vision
and helping of supervisor including cost of all labour
& T&P etc required for proper
completion of work.

1 x 60
Total
12 Testing of material and cubes for quality control
purpose by third party including cost of carriage fees
etc.

1 x 1
Total
J.E AE
UR
ANI JHARO MINOR

Quantity Unit

160.00 sqm
160.00 sqm

795.39 cum
795.386 cum

8.744 cum
72.068 cum
1.260 cum
-2.173 cum
23.025 cum
-21.907 cum
0.135 cum
81.153 cum
81.153 cum

4.16 sqm
48.05 sqm
41.33 sqm
34.14 sqm
0.60 sqm
42.25 sqm
0.60 sqm
171.13 sqm
177.12 R.M
164.00 R.M

205.92 R.M
164.00 R.M
9.00 R.M
720.04 R.M
444.98 KG
0.445 MT

20.00 RM
20.00 RM

13.100 RM
13.100 RM

158.72 cum
36.51 cum
195.23 cum

300.00 Hours
300.00 Hours

60.00 day
60.00 day

60.00 day
60.00 day
1.00 Job
1.00 Job