CASE STUDY

ON RISK
MANAGEMENT
PROCESS
RENOVATION AREA
IN MY HOUSE
INTRODUCTION
Based on my survey inside and outside my house,
at the same time by orienting the risk
management process, I have chosen the
renovation area in my house as the hazardous
places since there seem to be a lot of potential
risks. For instance, due to this renovation held, my
house is getting narrower as a result of the brick
and cement bags.

STEP 1: RISKS STEP 2: EVALUATING


IDENTIFICATION POTENTIAL RISKS
High Severity
Inspection - This tool is utilised to The potential size of the loss
inspect the risk at the hazardous is high due to the effects of
location. For instance, the renovation stumbled into something and
area in the house is being restricted so fall or accidentally hit any
sharp object that will cause FREQUENCY
that there no one will go there except profuse bleeding, fractured
S
E
those involved which can avoid bones, internal bleeding, etc. V
High
E
unwanted situation happens. R
Injury

High Frequency I
T Low
The probability that it is likely Y
Exposure Checklist - It is a tool which to emerge is high because of
merely a list of common exposures. For people are still living and High Low

example, the house's surroundings doing things that their usually


do in the house that are being
which include bricks and cement pose
renovated.
a possible risk.

STEP 3: EXAMINING STEP 4: SELECTING AND


ALTERNATIVE RISK IMPLEMENTING THE RISK
MANAGEMENT TECHNIQUES MANAGEMENT PROGRAMME
Risk control is the method that can be
Risk Avoidance: Risk can be avoid
used since it minimizing the risk.
from occuring by placing the bricks
and cement in a place where people
Financial Impact: Since the house
rarely go in that house.
renovation requires money, the owner
of the house/the head of the family
Risk Control: The head of the family
financial is affected.
should restrict the particular place
in the house that is under
Non-Financial Impact: The risk of getting
construction from his family to injured can be reduced since the
ensure the possible injury or any construction area which is dangerous
other risks can be avoided. has been restricted to the labourer only.

STEP 5: EVALUATING, REVIEWING In overall, the head of the family


AND CONTROLLING THE RISK should make sure the safety of its
MANAGEMENT PROGRAMME family members while the other
should cooperate by not entering
To conclude, all people living in the the restricted or dangerous area
house should give a commitment to which is at the house renovation
reducing the risk from occuring.
being operate.