L01 Project
Riyadh, KSA
PREPARED FOR
MARBLE AND GRANITE INTERNATIONAL COMPANY
LIMITED
RIYADH - KSA
Revision History
L01 Project
CHK: O.Zoubi
Consultant : N.P
APP: S.Murad
Dear Sirs,
Arab Company for Laboratories and Soil ( ACES) is pleased to submit this soft body
Impact testing of cladding report for the proposed L01-Project - Riyadh, KSA. This
test was carried out according to our proposal ref. RH.MMP23000268-Rev.1,dated
September 05th, 2023 and accordance with the notice to proceed provided by the
client in presence of representatives from MBL, Parsons, DAR, Maffeis and Marble
And Granite Company.
This report includes the observations and analysis from Soft Body Impact testing,
which was conducted on the above referenced site on Dec. 03rd 2023. Total 10
impacts were implemented for each location.
In the event that additional information or clarifications are required, please contact our
office at your convenience. We would like to take this opportunity to thank you for your
confidence and look forward to be of service to you in the near future.
Best Regards,
Shan/ACESRIYADH/ACES2023/RMR2023/RH.MMR23021551 R.00
*FINAL DOCUMENT by S.Murad *
L01 Project
CHK: O.Zoubi
TABLE OF CONTENTS
1.0 PURPOSE……………….…………………………………………..…………… 1
This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.
List of Appendices
Appendix A: Photos
Shan/ACESRIYADH/ACES2023/RMR2023/RH.MMR23021551 R.00
*FINAL DOCUMENT by S.Murad *
L01 Project
CHK: O.Zoubi
This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.
1.0 PURPOSE
The purpose of the testing is to describe the performance to be given in the form of a class for both
serviceability and safety. These classes can be used to specify the acceptability for
a particular purpose.
BS 8200 “Code of Practice for Design of Non-Load Bearing External Vertical Enclosures
of Buildings”.
4.0 Procedure.
4.1 Before an impact load is applied, the bag shall be rolled to loosen the sand. The bag is
placed at the impact point in such a way that, when it is suspended from the rope, it
just touches the surface of the panel. The bag shall then be drawn away from the panel
surface such that the maximum angle to the vertical subtended by the movement of the
rope shall be not greater than 65°.
1 of 3
Shan/ACESRIYADH/ACES2023/RMR2023/RH.MMR23021551 R.00
*FINAL DOCUMENT by S.Murad *
L01 Project
CHK: O.Zoubi
This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.
APP: S.Murad
4.2 The bag shall be raised to the prescribed height of drop, measured vertically from the
impact point. The bag is then released and allowed to swing freely in an arc onto the
face of the panel.
E= m.g.h, where:
4.3 For serviceability impact tests ten impacts at the same point shall constitute a single
test. Damage shall be recorded after each impact. For safety impact tests a single
impact is required.
Soft Body Impact Test has been performed for Stone cladding samples on Dec 03rd 2023.
Details are given in table 1.
Table 1
Sample Impact Energy#
Sample No. Impact Location Observations Classification*
Orientation (NM)
2 of 3
Shan/ACESRIYADH/ACES2023/RMR2023/RH.MMR23021551 R.00
*FINAL DOCUMENT by S.Murad *
L01 Project
CHK: O.Zoubi
6.0 Conclusion
This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.
The tested system (Stone samples, Steel Frame and fixing pins) has not withstand to the
design impacts applied to the vertical face of the cladding and the sample can be
considered failing the project acceptance criteria.
In the event that additional information or clarifications are required, please contact our
office at your convenience. We would like to take this opportunity to thank you for your
APP: S.Murad
3 of 3
Shan/ACESRIYADH/ACES2023/RMR2023/RH.MMR23021551 R.00
Shan/ACESRIYADH/ACES2023/RMR2023/RH.MMR23021551 R.00
L01 Project
CHK: O.Zoubi APP: S.Murad
*FINAL DOCUMENT by S.Murad * This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.
APPENDIX A
Photos
CHK: O.Zoubi APP: S.Murad
*FINAL DOCUMENT by S.Murad * This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.
Shan/ACES RIYADH/ACES2023/RH.MMR23021551 R.00
L01 Project
CHK: O.Zoubi APP: S.Murad
*FINAL DOCUMENT by S.Murad * This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.