IMPACT TESTING OF STONE CLADDING FOR


APP: S.Murad

L01 Project
Riyadh, KSA

Order No. RH.MMO23005949


Report No. RH.MMR23021551
Reporting Date 19 December 2023
Revision No. 00

PREPARED FOR
MARBLE AND GRANITE INTERNATIONAL COMPANY
LIMITED
RIYADH - KSA

Revision History

Rev. 0 19 Dec. 2023 Final S.M B.K B.K


Revision No. Date Description Prepared Checked Approved
*FINAL DOCUMENT by S.Murad *

L01 Project
CHK: O.Zoubi

Messrs.: Marble And Granite International Company Limited


RH.MMR23021551
Riyadh-K.S.A Date: 19-12-2023
This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.

Client : Marble And Granite International Company Limited

Main Contractor : Modern Building Leaders (MBL)

Consultant : N.P
APP: S.Murad

Subject : Impact Testing of Cladding Panels for The Proposed


L01 Project

Sample No.1 : VVIP Elevation 04A

Dear Sirs,

Arab Company for Laboratories and Soil ( ACES) is pleased to submit this soft body
Impact testing of cladding report for the proposed L01-Project - Riyadh, KSA. This
test was carried out according to our proposal ref. RH.MMP23000268-Rev.1,dated
September 05th, 2023 and accordance with the notice to proceed provided by the
client in presence of representatives from MBL, Parsons, DAR, Maffeis and Marble
And Granite Company.

This report includes the observations and analysis from Soft Body Impact testing,
which was conducted on the above referenced site on Dec. 03rd 2023. Total 10
impacts were implemented for each location.

In the event that additional information or clarifications are required, please contact our
office at your convenience. We would like to take this opportunity to thank you for your
confidence and look forward to be of service to you in the near future.

Best Regards,

Eng. Belal Khamaiseh


Material Department Manager - Riyadh
Arab Company for Laboratories and Soil

Shan/ACESRIYADH/ACES2023/RMR2023/RH.MMR23021551 R.00
*FINAL DOCUMENT by S.Murad *

L01 Project
CHK: O.Zoubi

TABLE OF CONTENTS

1.0 PURPOSE……………….…………………………………………..…………… 1
This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.

2.0 TEST METHOD…………………………………….…………………….…...…. 1


3.0 EQUIPMENT USED……………………………………………………….…...... 1
4.0 PROCEDURE……………………………………………………………….….... 1
5.0 TEST DETAILS……………………………………………………………..……. 2
6.0 CONCLUSION………………………………………………………………....… 3
APP: S.Murad

List of Appendices

Appendix A: Photos

Shan/ACESRIYADH/ACES2023/RMR2023/RH.MMR23021551 R.00
*FINAL DOCUMENT by S.Murad *

L01 Project
CHK: O.Zoubi
This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.

1.0 PURPOSE

The purpose of the testing is to describe the performance to be given in the form of a class for both
serviceability and safety. These classes can be used to specify the acceptability for
a particular purpose.

2.0 TEST METHOD


APP: S.Murad

BS 8200 “Code of Practice for Design of Non-Load Bearing External Vertical Enclosures
of Buildings”.

3.0 EQUIPMENT USED

3.1 Coarse canvas bag filled with 50 ± 0.2 kg of sand.

3.1.1 A sphere shape bag with dimensions when filled:


a. Highest diameter is 400 mm.
b. Distance from top to center is 400 mm.
c. Base diameter is 120 mm.
d. Bag opening of 80 mm.

3.2 Two ropes with a length of 3.0 m minimum.

3.3 Hoisting of the Bag to give the required drop height.

3.4 Instantaneously releasing the bag.

4.0 Procedure.

4.1 Before an impact load is applied, the bag shall be rolled to loosen the sand. The bag is
placed at the impact point in such a way that, when it is suspended from the rope, it
just touches the surface of the panel. The bag shall then be drawn away from the panel
surface such that the maximum angle to the vertical subtended by the movement of the
rope shall be not greater than 65°.

1 of 3

Shan/ACESRIYADH/ACES2023/RMR2023/RH.MMR23021551 R.00
*FINAL DOCUMENT by S.Murad *

L01 Project
CHK: O.Zoubi
This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.
APP: S.Murad

4.2 The bag shall be raised to the prescribed height of drop, measured vertically from the
impact point. The bag is then released and allowed to swing freely in an arc onto the
face of the panel.
E= m.g.h, where:

E is the impact energy in J (Given by the client)


m is the mass of the impactor in kg (According to the standard 50.0kg)
g is the acceleration due to gravity in ms-2 (9.81)
h is the height through which the impactor falls in m

4.3 For serviceability impact tests ten impacts at the same point shall constitute a single
test. Damage shall be recorded after each impact. For safety impact tests a single
impact is required.

5.0 TEST DETAILS

Soft Body Impact Test has been performed for Stone cladding samples on Dec 03rd 2023.
Details are given in table 1.

Table 1
Sample Impact Energy#
Sample No. Impact Location Observations Classification*
Orientation (NM)

No.1 Vertical 350 Corner Damage at 1 impact Risky

# The drop height calculated to get 350 NM is 71 cm.

2 of 3

Shan/ACESRIYADH/ACES2023/RMR2023/RH.MMR23021551 R.00
*FINAL DOCUMENT by S.Murad *

L01 Project
CHK: O.Zoubi

6.0 Conclusion
This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.

The test results have indicated the following:

The tested system (Stone samples, Steel Frame and fixing pins) has not withstand to the
design impacts applied to the vertical face of the cladding and the sample can be
considered failing the project acceptance criteria.

In the event that additional information or clarifications are required, please contact our
office at your convenience. We would like to take this opportunity to thank you for your
APP: S.Murad

confidence and look forward to be of service to you in the near future.

3 of 3

Shan/ACESRIYADH/ACES2023/RMR2023/RH.MMR23021551 R.00
Shan/ACESRIYADH/ACES2023/RMR2023/RH.MMR23021551 R.00
L01 Project
CHK: O.Zoubi APP: S.Murad
*FINAL DOCUMENT by S.Murad * This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.
APPENDIX A
Photos
CHK: O.Zoubi APP: S.Murad
*FINAL DOCUMENT by S.Murad * This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.
Shan/ACES RIYADH/ACES2023/RH.MMR23021551 R.00
L01 Project
CHK: O.Zoubi APP: S.Murad
*FINAL DOCUMENT by S.Murad * This is an electronically generated report and does not require a signature, it's valid only with the QR code shown on the top and is considered verified with the same.

You might also like