Final Presentation - Nael Neil Xin Yi
Final Presentation - Nael Neil Xin Yi
2
COMPANY PROFILE
INNOVATING AND DESIGNING BUILDINGS BY
PROMOTING MODERNIZATION AND SUSTAINABILITY
• Modernize JAB
5
PROJECT OBJECTIVE
• Meet the growing demand of dorming,
dining, recreational, and learning spaces
at NYU Tandon
6
PROJECT DESCRIPTION
LEED PLATINUM CERTIFICATION
✓ Location & Transportation
✓ Sustainable Sites
✓ Water Efficiency
✓ Energy & Atmosphere
✓ Indoor Environmental Quality
✓ Innovation Figure 4: LEED Platinum Logo
(USGBC)
7
PROJECT DESCRIPTION
Location & Transportation
11
PROJECT DESCRIPTION
Indoor Environmental Quality
12
PROJECT DESCRIPTION
Innovation
13
PROJECT DESCRIPTION
1/32" = 1'-0"
14
PROJECT DESCRIPTION
1/32" = 1'-0"
15
PROJECT DESCRIPTION
1/32" = 1'-0"
16
PROJECT DESCRIPTION
1/8" = 1'-0"
20
MARKET AND PRODUCT VIABILITY
Competitors:
• Davis Brody Bond
• Kieran Timberlake
• New-York based companies
Our Uniqueness:
• Modern appeal
• Designed by students for students
Figure 31: Rendered View of Building
• Sustainable Design
• Convenient Dorm Space
21
MARKET AND PRODUCT VIABILITY
Comparison:
• More modern/on-trend design
• Versatile design
o LEED Platinum Design
o Educational, dining, recreational and
dorming spaces
• Higher priced but includes all aspects
needed for successful student life Figure 32: Seating on Floor 2
o Cost: $425,076,667
22
CONCLUSION
Purpose Features
Promote sustainability Includes green initiatives
Modernize Brooklyn campus Accessible for all members of community
Participate in Climate 2040 Includes dorming, dining, recreational, and
Enhance students’ and staff’s educational spaces
quality of life LEED Platinum design
23
CONCLUSION
Climate-aware design
Advantages
International company with experience
24
REDESIGN OF THE
JACOBS ADMINISTRATIVE BUILDING
MONT-BLANC INNOVATION
CEO - NAËL ANDRE
PROJECT MANAGER - NEIL PATEL
PROJECT SUPERVISOR - XIN YI FANG
APPENDIX
Cost Breakdown
Table 1: Cost of Labor Table 2: Cost of Construction
26
APPENDIX
Cost Breakdown
Table 3: Cost of Operation
27
APPENDIX
Cost Breakdown
Table 4: Total Cost
Cost
Labor $4,732,400
Construction $420,037,067
Operation $307,200
Total $425,076,667
28
APPENDIX
Construction Schedule
• Construction Time (approximate): 3 years and 2 months