SH&E Site Daily Observation Registered Log

BLACK GOLD MUSEUM PROJECT


Project Contract # PN00496P:7448
Prepared By: Muhammad Zeeshan
HAZARD DESCRIPTION LEVEL POTENTIAL FAILURE CONSEQUENCES REQUIRED RESPOND PERIOD
Major Failure e.g. fatality, LTI, major injury or Dangerous Occurrence Immediate > 1 working day (if not temporary suspended)
Potential Minor injury Incident, Environmental or Welfare Issue 1 > 3 working day
Potential damage of property (clients, FGC, other company) Immediate > 1 working day (if not temporary suspended)
N/A None however look to share good practice

Contractor : First Gulf Company Date: 13-April-2024 /Saturday

STATUS
SOR RISK RESPONSIBLE
Time Location OBSERVATION DETAILS OBSERVATION PHOTO HAZARD IDENTIFICATION ACTION REQUIRED/COMMENTS CLOSE-OUT PHOTO TARGET DATE Remarks
REF.# LEVEL PERSON
CLOSED

Fire through short circuit or Informed the concern person to provide


Observed a damaged pipe through which electric shock to worker. protection ASAP. Electric Supervisor
electric cables were passing.
NO 1 11:23 AM BGM- Ground Floor Lakshmi Narine
13-04-2024

Follow up for the next day.


2 x 4=8 Open

Uninspected scaffold may Informed the concern person to do inspection Scaffolding supervisor
Observed that worker was working on a result in collapse and worker and update the tag ASAP.
mobile scaffold that tag was not updated. may fall from height due to Syed Ishfaq
incomplete scaffold.
2 x 4=8 13-04-2024 Follow up for the next day
Close
No 2 11:15 AM BGM- 2nd Floor

Observed a positive hot work


activity as the area was covered
with fire blankets and workers Follow up for the next day
were wearing proper PPE’s.
Positive Activity Positive Activity
No 3 10:14 AM BGM-2nd Floor