Professional Documents
Culture Documents
Fidou S Sharing n04 Road Design Conception 1708465333
Fidou S Sharing n04 Road Design Conception 1708465333
Road design
I. Context
During mining operations, the road is often diverted for various reasons. In this case, the way must be rebuilt
to allow the haulage operations to continue. Before the implementation of the road, the engineer has to make
a road design. Also, calculation of cut and fill volume and road project cost.
In our share, we will talk about road design with Surpac software.
II. Definition
• Inflection point: Most roads are designed from inflection points, which define a change, or
inflection, in the horizontal or vertical orientation of the road. The lines on either side of an inflection
point define tangents to the curve.
• Simple curve: A simple curve is a curve of constant radius from one tangent line to another. This
curve type does not allow for transitions from the straight to the maximum curvature and should
only be used in situations where vehicle velocity is at a minimum.
• Vertical curve: A vertical curve exists in a vertical plane. Vertical curves consist of a simple curve
with or without spiral (or transition) curves on either side.
Road design conception is done a multi-step. In this part of our share, we will be focus on each step.
Inflection point
This is a result:
Note:
Yellow string is a final centerline of our road.
Create a road outline.
As part of this project, we’re going to design the road with 25 meters of width to ensure the good traffic of
DTs. For this, we will have 12.5 meters on either side of center line.
• Choose design >Underground tools > road from centreline.
After all that, we make a projection based on the angle of the road wall. Then, we calculate cut and fill
volume.
Before the beginning of the project, all personnel must be informed by email to avoid any accident. For
safety reasons, a risk assessment must be carried out. Also, we barricade the working area with danger
cones to warn people who will be coming into the zone. Finally, the project engineer deploys the equipment
(Bulldozers, grader, dump truck….).
+225 07 47 30 43 32/ fidelekevin@yahoo.com /Fidele-kevin KOUASSI 7