Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

2 www.brogangroup.

com

Access Solutions - Scaffolding

Brogan Group offers a complete specialist


access solution incorporating Scaffolding, Scaffold System
Mastclimbers, Hoists and Loading Platforms.

The Group owns large quantities of scaffolding


includes:
equipment comprising both system scaffold
and traditional tube and fitting, we are one of ƒ Cuplok Scaffolding
the largest users of Cuplok system scaffolding ƒ HAKI system Scaffolding
in the UK.
ƒ Layher SpeedyScaff and Allround
Specialist scaffold such as free standing
buttressed scaffolds can be designed and
erected to reduce tying into the permanent
structure.

“... continually top both our internal supplier measurement table and

independent capability audits maintaining their enviable position as one of

a ver y select number of our Preferred Status A Scaffolding Supplier”

Michael O’Connor - Managing Director, Carillion Plc


www.brogangroup.com 5

Partnering and
Collaborative Working

B rogan Group fully embraces partnering


opportunities and this is demonstrated
in the number of ‘preferred’ relationships
Brogan Group continues to develop close
trading relationships with all of its supply
chain in order to negotiate continued value
we have with our clients. Our design and that can in turn be passed to our clients. We
continuing experience also aids collaborative have achieved preferred supplier status with
working by identifying best practice and any some of the largest contractors in the UAE, UK
cost savings from the outset. and Ireland.

We closely work with our clients to ensure


our service meets with their expectations. Our
goal from partnering is to:

ƒ Have continual improvement, particularly


in delivery of service and health & safety
ƒ Satisfy client requirements
ƒ Improve communications between
organisation members and clients
ƒ Share information and knowledge
effectively
ƒ Increase efficiencies at all levels

“Brogan Group have carried out a large access scaffolding to the


splash on our project, it involved all aspects from design to delivery
working closely with all the contractors and our safety department.
They have carried out this work with exemplar y professionalism and
safety advising and delivering a ver y difficult project I would highly
recommend this company for any future works. ”

Peter La Plain - Regional Director, John Sisk & Son


6 www.brogangroup.com
Ground Breaking
Designs
‘Abu Dhabi’s Capital Gate
is the most inclined structure
in the world, scaffold was
erected over 98m in height’
www.brogangroup.com 7

Case Study - Capital Gate

CLIENT - WAAGNER BIRO / AL HABTOOR Capital Gate


SCOPE OF WORKS - ERECTION OF BESPOKE
DESIGNED SCAFFOLD REACHING A HEIGHT OF
The Capital Centre will be the worlds first fully
96M FROM PODIUM FLOOR (AT THE TIME, ONE
interconnected exhibition lifestyle centre and
OF THE HIGHEST SCAFFOLDS TO BE BUILT OFF THE is being developed by ADNEC Group an
GROUND IN THE UAE) international venue development and business
company.

Once complete Capital Gate will provide


accommodation to the first Hyatt operated
hotel in the UAE capital together with various
exclusive offices in Abu Dhabi. Leaning
Westward 18 degrees, the tower will not only
defy gravity, but its aesthetic grandeur and
technical brilliance would be a landmark for
future constructions.
8 www.brogangroup.com

Case Study - Dubai Mall

Dubai Mall CLIENT - KHANSAHEB


SCOPE OF WORKS - DESIGN AND INSTALLATION
OF ACCESS SCAFFOLDING, CRASH DECK AND
Brogan Group provided the scaffolding
ADVERTISING HOARDING
requirements for the façade upgrade works
of Dubai Mall. The high-end retail and
entertainment complex has a gross floor area of
more than 5.9 million square feet and houses
1,200 retail spaces, 160 food and beverage
outlets, an Olympic-sized ice rink, and a
22-screen Cineplex. Located at the base of the
Burj Khalifa, one of the tallest buildings in the
world
10 www.brogangroup.com

Case Study - Al Ain Stadium

Al Ain Stadium & Mixed CLIENT - BAM INTERNATIONAL


Use Development SCOPE OF WORKS - DESIGN AND INSTALLATION
OF ACCESS SCAFFOLDING FOR ALOFT HOTEL

The Al Ain scheme saw the construction of an PLOTS 06, PLOT 16 AND PLOT 14
accommodation block, a multi-storey car park
and The Aloft Hotel in Abu Dhabi’s second
largest city. After working on the mixed use
project, Principle Contractor, BAM International,
awarded Brogan Group ‘Contractor of the Year’
for the Gulf Region.
CLIENT - JUMEIRAH GROUP
SCOPE OF WORKS - OVERALL ACCESS
REQUIREMENTS INCLUDING EXTERNAL AND
INTERNAL PERIMETER SCAFFOLDING AND MASTCLIMBER
Barsha Heights, Dubai, UAE
Tel: 04 551 9954
Fax: 04 551 9975

Email: sales @brogan.ae


www.brogangroup.com

TUV Middle East TUV Middle East TUV Middle East

1
BS
SO IS OH

00
1 O 14001 SAS 18
900

You might also like