Download as pdf or txt
Download as pdf or txt
You are on page 1of 24

t

a
rd
U
s
n
m
ie
S

MOBILETT XP
SP

Installation and Startup


System

Dose Area Product Measurement Device (DAP)

Valid also for:


© Siemens, 2010

Mobilett XP Eco
Mobilett XP Hybrid
Mobilett XP Digital
Mobilett XP CR (CR ITX 560) © Siemens, 2010
01818447
10271962
All documents may only be used for rendering
services on Siemens Healthcare Products. Any
document in electronic form may be printed
once. Copy and distribution of electronic docu-
ments and hardcopies is prohibited. Offenders
will be liable for damages. All other rights are re-
served.

Print No.: SPR8-230.814.06.03.02 English


Replaces: SPR8-230.814.06.02.02 Doc. Gen. Date: 03.10
CS PS SP
n.a.

2010
2 Copyright / Version / Disclaimer
1Copyright / Version / Disclaimer

Copyright
“© Siemens, 2010“ refers to the copyright of a Siemens entity such as Siemens Aktienge-
sellschaft - Germany, Siemens Shenzhen Magnetic Resonance Ltd. - China, Siemens
Shanghai Medical Equipment Ltd. - China, Siemens Medical Solutions USA Inc. - USA,
Siemens Healthcare Diagnostics Inc. - USA and/or Siemens Healthcare Diagnostics Prod-
ucts GmbH - Germany.

Document Version
Siemens reserves the right to change its products and services at any time.
In addition, manuals are subject to change without notice. The hardcopy documents corre-
spond to the version at the time of system delivery and/or printout. Versions to hardcopy
documentation are not automatically distributed. Please contact your local Siemens office
to order current version or refer to our website http://www.healthcare.siemens.com.

Disclaimer
Siemens provides this documentation “as is“ without the assumption of any liability under
any theory of law.
The installation and service of equipment described herein requires superior understand-
ing of our equipment and may only be performed by qualified personnel who are specially
trained for such installation and/or service.

MOBILETT XP SPR8-230.814.06.03.02 Page 2 of 24 © Siemens, 2010


03.10 CS PS SP
Table of Contents 3
0Table of Contents

1 _______ Prerequisites ___________________________________________________ 4

..................................................................... 4
Parts required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Documents required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Tools required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Time required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Objective. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

2 _______ Installation _____________________________________________________ 8

Installation of DAP control and display device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8


Installation of the power supply cable between CPU board D916 and DAP control and dis-
play board. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Installation of the RS232 cable (only for Mobilett XP Digital with CPU board D16, Part No.
10272714) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Installation RS 232 cable (Only for Mobilett XP CR (CR ITX 560)). . . . . . . . . . . . . . . . . 16
Connecting cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Installation of ionization chamber . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Testing the DAP device. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Calibrating the DAP system (only if necessary) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Calibration procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

3 _______ Changes to previous version _____________________________________ 23

4 _______ List of Hazard IDs ______________________________________________ 24

© Siemens, 2010 SPR8-230.814.06.03.02 Page 3 of 24 MOBILETT XP


03.10 CS PS SP
4 Prerequisites
1Prerequisites 1-
0

This document describes the installation of the dose area product measurement device
(DAP) on a Mobilett XP, XP Eco, XP Hybrid, XP Digital and XP CR (CR ITX 560)

NOTE Most of the installation steps described here are valid for all
types of the Mobilett XP family. Some steps specific to the XP
Digital or the CR (CR ITX 560) will be described additionally.

Parts required 0

The DAP kit has the material number 10272962.

Fig. 1: Dose area measurement device (DAP) kit

MOBILETT XP SPR8-230.814.06.03.02 Page 4 of 24 © Siemens, 2010


03.10 CS PS SP
Prerequisites 5

Fig. 2: RS cable for Mobilett XP Digital with D916 CPU (10272714)


Dose area product measurement device (DAP) kit including:

1. Ionization measurement chamber


2. Locking device (rails) for chamber
3. DAP control and display board
4. Plastic film
5. RS232 Cable (not for Mobilett XP CR (CR ITX 560))
6. RS cable for Mobilett XP CR (CR ITX 560)
7. Holder for RS 232 cable
8. Power supply cable DAP-CPU(D916) (Not for Mobilett XP CR (CR ITX 560))
9. Nuts and washers
10. RS cable for Mobilett XP Digital with CPU board D916, Part No. 10272714

Documents required 0

• General safety information TD00-000.860.01.


• Replacement of parts SPR8-230.841.01.
• Instructions for use SPR8-230.621.01.
• Installation instructions (this document) SPR8-230.814.06.

Tools required 0

Standard service tools

Time required 0

Approximately 1.5 hours for one person

© Siemens, 2010 SPR8-230.814.06.03.02 Page 5 of 24 MOBILETT XP


03.10 CS PS SP
6 Prerequisites

DANGER Life-threatening electric shock hazard during service activi-


ties with open covers!
Dangerous voltage exists in several places.
¹ Observe the general and product-specific safety infor-
mation in the document "Replacement of parts" at all
times when working on the unit while the covers are
removed.

MOBILETT XP SPR8-230.814.06.03.02 Page 6 of 24 © Siemens, 2010


03.10 CS PS SP
Prerequisites 7

Objective 1.1

Installation of the ionization chamber, the dose display board, and the internal cabling.

© Siemens, 2010 SPR8-230.814.06.03.02 Page 7 of 24 MOBILETT XP


03.10 CS PS SP
8 Installation
2-
Installation of DAP control and display device
2Installation

NOTE To install the DAP device on the Mobilett XP CR (CR ITX 560),
only the arm cover needs to be removed. For Mobilett XP,
Eco, Hybrid and Digital, additional covers have to be
removed (e.g. side covers of MOBILETT and top cover, in
order to connect power supply cable to CPU board D916).

• Switch the unit OFF (Hybrid: mode selection switch OFF).


• Disconnect the power cable.
• Wait approximately 20 minutes until the capacitor bank is discharged.
• Remove the arm cover; see (Fig. 3 / p. 8).
• Remove the "Siemens" label (1/Fig. 3 / p. 8) and the two rubber caps (2/Fig. 3 / p. 8).

Fig. 4: Arm cover_2

Fig. 3: Arm cover

• For Mobilett XP, Eco, Hybrid and Digital(without D916, Part No.10272714 ), remove
the marked field as shown in (1/Fig. 4 / p. 8) (this step is not necessary for Mobilett XP
CR (CR ITX 560)).

MOBILETT XP SPR8-230.814.06.03.02 Page 8 of 24 © Siemens, 2010


03.10 CS PS SP
Installation 9

• After removing the field, the arm cover has the cutouts shown in (Fig. 5 / p. 9)and
(Fig. 6 / p. 9).

Fig. 5: Holes Fig. 6: Hole

• Remove the paper from the film as shown in (Fig. 7 / p. 9) and affix the film to the arm
cover according to (Fig. 8 / p. 9).

Fig. 7: Film Fig. 8: Affixing the film

© Siemens, 2010 SPR8-230.814.06.03.02 Page 9 of 24 MOBILETT XP


03.10 CS PS SP
10 Installation

• For Mobilett XP, Eco, Hybrid and Digital (without D916, Part No. 10272714 ), mount
the connector holder as shown in (Fig. 9 / p. 10) using the nuts, and install the cable
(5/Fig. 1 / p. 4) according to(Fig. 10 / p. 10) and (Fig. 11 / p. 10) (Not necessary for
Mobilett XP CR (CR ITX 560).

Fig. 9: Connector holder Fig. 10: Mounting the connector

Fig. 11: Mounting the cable for RS232

MOBILETT XP SPR8-230.814.06.03.02 Page 10 of 24 © Siemens, 2010


03.10 CS PS SP
Installation 11

• Mount the DAP control and display board (Fig. 12 / p. 11)) using the spacers, washers
and nuts according to (Fig. 15 / p. 12) (for Mobilett XP; Eco, Hybrid and Digital)
or(Fig. 14 / p. 12) (for Mobilett XP CR (CR ITX 560)).
For more details see also (Fig. 13 / p. 11)

Fig. 12: DAP board

Fig. 13: Attaching the board

© Siemens, 2010 SPR8-230.814.06.03.02 Page 11 of 24 MOBILETT XP


03.10 CS PS SP
12 Installation

Fig. 15: DAP with RS232

Fig. 14: DAP board on arm cover

• Connect the RS232 cable to (3/Fig. 14 / p. 12). See also(Fig. 15 / p. 12)


• Check to make sure the two switches for reset and test on DAP board can be activated
easily.

MOBILETT XP SPR8-230.814.06.03.02 Page 12 of 24 © Siemens, 2010


03.10 CS PS SP
Installation 13

Installation of the power supply cable between CPU board D916


and DAP control and display board 2.1

NOTE On the Mobilett XP CR (CR ITX 560), the power supply cable
between D916 and DAP is already factory installed. Only for
the systems Mobilett XP, Eco, Hybrid, and Digital does the
cable need to be installed on site.

NOTE On the Mobilett XP Digital with a CPU board D916, Part No.
10272714, an additional cable between the D916 (RS232) and
the DAP display must be installed. Install this cable the same
way as the power supply cable.

• Attach the cable to the arm as shown in (2/Fig. 16 / p. 13).

Fig. 17: Cover with hook holder

Fig. 16: Securing cables

• To route the cable, detach the hook holder (Fig. 17 / p. 13)


• Route the cable from the arm to the unit (D916); see the illustration here:
(1/2/3/Fig. 18 / p. 14).

NOTE To avoid possible interference, do not tie the power supply


cable directly to any single tank cables.

© Siemens, 2010 SPR8-230.814.06.03.02 Page 13 of 24 MOBILETT XP


03.10 CS PS SP
14 Installation

• Ensure that the cable is not subject to any strain (Fig. 18 / p. 14) when the arm is
moved.

Fig. 18: Cabling


• Secure the cable as shown in (1/Fig. 19 / p. 14).
• Route the cable through the hole as shown in (1/Fig. 20 / p. 14).

Fig. 19: Securing the cable 1

Fig. 20: Cabling to D916

MOBILETT XP SPR8-230.814.06.03.02 Page 14 of 24 © Siemens, 2010


03.10 CS PS SP
Installation 15

Installation of the RS232 cable (only for Mobilett XP Digital with


CPU board D16, Part No. 10272714) 2.2

NOTE When the CPU board D916, Part No. 10272714 is installed, an
automatic dose value transfer from the DAP device to the
imaging system is possible. This function requires the instal-
lation of a RS232 cable.

• Connect the cable (10/Fig. 2 / p. 5) to the DAP display board (3/Fig. 14 / p. 12) and to
CPU board D916, RS 232 plug (1/Fig. 21 / p. 15).

Fig. 21: CPU board D916, Part No. 10272714


• Secure the cable in a similar way to: (Installation of the power supply cable between
CPU board D916 and DAP control and display board / p. 13)
• The automatic dose value transfer must be set via the SW. See
Service tools--> Main Menu--> CXDI Configuration--> DAP Mode--> Auto
and also the document SPR8-230.840.30.xx.xx, Mobilett XP Digital,TSG, "Service
tools" chapter.

© Siemens, 2010 SPR8-230.814.06.03.02 Page 15 of 24 MOBILETT XP


03.10 CS PS SP
16 Installation

Installation RS 232 cable (Only for Mobilett XP CR (CR ITX 560)). 2.3
NOTE For Mobilett XP, Eco, Hybrid and Digital, these cable installa-
tion instructions do not apply.

• Connect the cable (6a/Fig. 1 / p. 4)7 Fig A to the blue connector (1/Fig. 16 / p. 13)
located on the arm near the DAP Control board, and connect the other side
(6b/Fig. 1 / p. 4)to the DAP control and display board (3/Fig. 14 / p. 12).

MOBILETT XP SPR8-230.814.06.03.02 Page 16 of 24 © Siemens, 2010


03.10 CS PS SP
Installation 17

Connecting cables 2.4

• Connect the cable coming from the single tank side to (1/Fig. 22 / p. 17).

Fig. 22: Connecting cables on DAP board


• Connect the control cable (8a/Fig. 1 / p. 4) coming from the CPU board D916 to
(2/Fig. 22 / p. 17).
• Connect the control cable (8b/Fig. 1 / p. 4) at the CPU board D916 connector XDAP as
shown in (1/Fig. 23 / p. 17) (for Mobilett XP CR [CR ITX 560] the cable is already
installed). For the new type of Mobilett XP Digital, the D916 is located on the front side
of the unit; see (1/Fig. 24 / p. 17).

Fig. 23: Connecting cable to D916

Fig. 24: Connecting cable to D916

© Siemens, 2010 SPR8-230.814.06.03.02 Page 17 of 24 MOBILETT XP


03.10 CS PS SP
18 Installation

Installation of ionization chamber 2.5

• Place the ionization chamber(1/Fig. 1 / p. 4) on the collimator(Fig. 25 / p. 18) as shown


in (Fig. 26 / p. 18) and attach it using the two metal rails (2/Fig. 1 / p. 4)(Fig. A/2) and
screws.

Fig. 25: Collimator Fig. 26: Mount dose measurement


chamber

• Plug the connector coming from the ionization chamber into the RJ45 connector on the
collimator (1/Fig. 26 / p. 18).

MOBILETT XP SPR8-230.814.06.03.02 Page 18 of 24 © Siemens, 2010


03.10 CS PS SP
Installation 19

Testing the DAP device 2.6

DANGER Life-threatening electric shock hazard during service activi-


ties with open covers!
Dangerous voltage exists in several places.
¹ Observe the general and product-specific safety infor-
mation in the document "Replacement of parts" at all
times when working on the unit while the covers are
removed.

• Connect the power cable, switch the unit ON, and check the DAP function. To do so:
• Press the test button on the DAP display. A value between 80-120 µGym2 (DAP resolu-
tion 0.1 µGym 2) or in the case of a high-resolution chamber, 8-12 µGym2 (DAP resolu-
tion 0.01 µGym2) must be subsequently displayed.
• If the display is incorrect, the measuring device must be calibrated. (Calibrating the
DAP system (only if necessary) / p. 20)
• Reinstall all covers in reverse order.

© Siemens, 2010 SPR8-230.814.06.03.02 Page 19 of 24 MOBILETT XP


03.10 CS PS SP
20 Installation

Calibrating the DAP system (only if necessary) 2.7

Calibration procedure 0

Required equipment: Dosimeter, calibration tool (item number 65 84 978)

• System OFF
• Unplug the plug of the DAP ionization chamber (1/Fig. 27 / p. 20).

Fig. 27: DAP plug


• Connect the DAP calibration tool between the plug and the box.
• System ON
• Perform the calibration setup (Fig. 28 / p. 21).

NOTICE Measurement error!

¹ The temperature/pressure factor of the dosimeter must


be taken into account when using a semiconductor
detector (see manufacturer's data).
¹ Otherwise, there may be a deviation from the factory
calibration.

MOBILETT XP SPR8-230.814.06.03.02 Page 20 of 24 © Siemens, 2010


03.10 CS PS SP
Installation 21

• Switch on the light localizer. Place the dosimeter in the center of the light field and in
open air (to prevent radiation backscatter).

Fig. 28: DAP calibration setup

• Measure the focus-to-dosimeter distance (A/Fig. 28 / p. 21) and then the width and
length of the light field on the surface. For optimal precision, position an unexposed film
cassette on the surface and measure the width and length of the exposed surface after
releasing an exposure.
• Measure the focus-to-light field/surface (B/Fig. 28 / p. 21).
• Use the following formula to calculate the reference surface FREF.

Fig. 29:

© Siemens, 2010 SPR8-230.814.06.03.02 Page 21 of 24 MOBILETT XP


03.10 CS PS SP
22 Installation

X • Set the kV to 102 and mAs to 20 and release an exposure.


• Record the dose value measured with the dosimeter.
• Calculate the DAP reference value using the following formula and the measured dose
value:

Reference DAP value = measured dose value x reference surface (unit µGy m2)

• Make a note of the DAP value displayed on the DAP measurement system.
• Calculate a reference value using the following formula:

Reference value (%) = ((100 ⋅ DAP value on the display): Calculated DAP value) -
100

The reference value shows the deviation between the actual DAP value (measured
using the dosimeter) and the DAP value measured by the DAP measurement sys-
tem. If the reference value is negative, the DAP value displayed is lower than the
actual value. If the reference value is positive, the opposite is true. When the refer-
ence value is below ± 5%, the calibration is complete.

• To correct the deviation on the calibration tool, press the "UP" button (for a negative ref-
erence value) or the "DOWN" button (for a positive reference value). Pressing the but-
ton once effects a change in the reference value of approximately 0.5%.

NOTE The middle button on the DAP calibration tool is for test pur-
poses. It has the same function as the test button on the DAP
display.

• Repeat the calibration procedure until the deviation is less than 5%.
• System OFF
• Remove the DAP calibration tool and reconnect the DAP ionization chamber
(1/Fig. 27 / p. 20).
• System ON
• Press the Reset and Test buttons on the DAP display to complete the calibration proce-
dure.
X • Release an exposure.

NOTE No technical modifications should be made to the DAP ion-


ization chamber or the display.

MOBILETT XP SPR8-230.814.06.03.02 Page 22 of 24 © Siemens, 2010


03.10 CS PS SP
Changes to previous version 23
3Changes to previous version 3-

Chapter Page Change


All n.a. Picture for RS cable for D916 updated.

© Siemens, 2010 SPR8-230.814.06.03.02 Page 23 of 24 MOBILETT XP


03.10 CS PS SP
24 List of Hazard IDs
4List of Hazard IDs 4-
There are no Hazard IDs in this document.

MOBILETT XP SPR8-230.814.06.03.02 Page 24 of 24 © Siemens, 2010


03.10 CS PS SP

You might also like