Office of the Governor Capitol, Oroquieta City, 7207
QUARTERLY WORK AND FINANCIAL PLAN TEMPLATE
LGU NAME : BALIANGAO
QUARTER : 3RD AND 4TH QUARTER OF CY 2023 AND CY 2024
Major Final Output (MFO)/ Success Indicators/
Cost Funding Source Timeline Programs, Activities, and Projects (PAPs) Target Output [3] [4] [5] [1] [2] Municipal building facilities and ground Renovation Of Municipal Gymnasium P8,000,000.00 PROVINCE/FUNDED Aug. 2023-Dec.2023 improved/rehabilitated / repaired Improved street lighting especially along the roads Installation Of Solar Street Lights P20,132,387.10 PROVINCE Jan. 2023-Dec .2023 leading to tourism destinations Construction Of Water System Level II to Level III Improved water system to all barangays P20,000,000.00 PROVINCE Jan. 2023-Dec .2024 Construction Of Single Pass Rice Mill with Dryer Jan. 2023-Dec .2024 Warehouse building constructed P3,650,000.00 PROVINCE Warehouse Construction Of Three (3) Classroom 1-Storey School Classroom 1-Storey School building construction Jan. 2023-Dec .2024 P4,000,000.00 PROVINCE Building completed Construction Of Classrooms Of 5 Barangays: Misom, Jan. 2023-Dec .2024 Construction of Classrooms building completed P PROVINCE Landing, Lusot, Mitacas and Tugas Construction Of Farm to Market Road Barangays: Improved roads to barangays P PROVINCE Jan. 2023-Dec .2023 Landing, Lusot, Magsaysay, Del Pilar and Mabini Concreting of Barangay Mabini Road Concreted Barangay Mabini Road P PROVINCE Sanitary Landfill Development SLF Site Procured P1,500,000.00 20% DF Jan. 2023-Dec .2023 Construction of Municipal Epidemiology and Disease MESU Building construction completed P1,750,000.00 20% DF Jan. 2023-Dec .2023 Surveillance Unit (MESU) Building Water-sealed toilets and other construction Implementation of Zero-Open Defecation Program P100,000.00 20% DF Jan. 2023-Dec .2023 materials provided Procurement of One (1) Unit Rescue Vehicle Availability of additional one (1) unit Rescue Vehicle for efficient response to emergency/crisis P1,000,000.00 20% DF Jan. 2023-Dec .2023 situations Counterpart Fund for National and Foreign-assisted National and Foreign-assisted Projects 20% DF, Supplementary P2,000,000.00 Jan. 2023-Dec .2023 Projects Implemented Budget Republic of the Philippines Province of Misamis Occidental Office of the Governor Capitol, Oroquieta City, 7207 Rehabilitation of Core Local Roads Equipment running and condition maintained 20% DF Jan. 2023-Dec .2024 Sinian- Mitacas (grader, dump trucks and road roller and other P750,000.00 Mabini-Pta. Sulong equipment); P750,000.00 Magsaysay - Del Pilar P750,000.00 Magsaysay – Lumipac Priority Local Roads graveled and passable by P750,000.00 Magsaysay Prop. – Magcamiguing small vehicle in the barangays P750,000.00 Magsaysay – Lusot P750,000.00 Lumipac – Mabini P750,000.00 Lumipac – Dioyo P750,000.00 Mabini- Misom P750,000.00 Mabini - Pta. Sulong P750,000.00 Mitacas – Langub P750,000.00 Mitacas- Magsaysay P750,000.00 Purok 1, Misom P750,000.00 Purok 2, Magsaysay P750,000.00 Purok 5, Lusot P750,000.00 Purok Gumamela, Sinian P750,000.00 Purok 1, Misom P750,000.00 Legend: [1] Priority/flagship programs, activities and projects (PAPs) of the LGU Note: All priority/flagship PAPs must be geared towards the achievement of 5Ms – Misamisnon Magpuyong Malinawon Malambuon ug Malipayon [2] Performance level consisting of measures and/or target output [3] The financial funding required to implement/deliver the PAPs [4] Source where the PAPs will be funded [5] The target schedule for when the PAPs will be carried out