Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

WORKPLACE MODULES SET UP

Note: the below schedule excludes the following:

a) Weekends
b) December holiday – 16/12/2020 – 10/01/2020
c) Public holidays

Module Week Activities No. of Start Date End Date


Days
1 – Process and procedures for installation and 1-2 Conduct Risk Assessment 37 01/11/2019 15/11/2019
testing of above ground soil waste and vent systems Levelling
and sanitary ware appliances. Sizing and laying of drainage
Commission drainage test
3-4 Connection of all sanitary drainages 18/11/2019 29/11/2019
and all installation
Calculation of with all gradient
sloping
5-6 Maintaining equipment’s category 02/12/2020 13/12/2020
Perform housekeeping
7 Compile feedback report in class on 13/01/2020 20/01/2020
all performed duties at the
workplace under the supervision and
guidance of the facilitator; and
produce evidence.

2 – Processes and procedures for installation and 8-9 Clear site 44 21/01/2020 03/02/2020
testing of below-ground drainage systems and
performing basic building work.
Levelling
Excavation

Page 1 of 4
Sizing and laying of the underground
drainage
10-11 Calculation of hydraulics load 04/02/2020 17/02/2020
discharge and find the gradient fall
Form a new branch connection
Introduce drainage test SABS
methods
Backfilling and compaction
12-14 Repair damaged pipe in connection 18/02/2020 06/03/2020
of couplings
Connection of uPVC with PEX pipes
Erection of the manhole
15-16 Compile all Health and Safety 09/03/2020 20/03/2020
measures to be adhered and
strategies on how to eliminate
identified hazards. National Building
Regulations must be introduced and
be demonstrated in SABS outlining
and placed in the learners POE (in
Class)

3 – Procedures and processes for installation and 17-18 Selection of recommended material 44 23/03/2020 03/04/2020
maintenance of cold water and hot water systems and procuring all.
Soldering of copper pipe for jointing
Threading of GMS pipe and connect
fittings
Measure mark, cut and joining of
PVC with solvent for adhesion
19-21 Positioning o fa geyser 06/04/2020 29/04/2020
Connection of cold water from the
water main supply to the geyser
Connect all required geyser fitting to
ensure a proper installation

Page 2 of 4
Connection of all cold and hot water
valves
Perform geyser test for leakage and
if found replace it and repair if
necessary.
22-23 Distribution of hot water from the 30/04/2020 14/05/2020
geyser to the draw offs
Connect stop cock in branches
Adjust or control the water pressure
to the fixtures
24-25 Compile all relevant specifications 15/05/2020 27/05/2020
and all regulated code and
legislation of hot water installation
and cold-water distribution.
Produce valid supporting documents
of the practical’s and how to
complete the feedback in class with
your facilitator.

4 – Procedures and processes for installation and 26-27 Identify different gutter materials. 37 28/05/2020 10/06/2020
maintenance of rainwater systems. Find the measurement on the roof
truss.
Secure the gutters to the parapet
walls with gutter brackets.
Measure the invert and datum levels
of the wall downwards.
Secure the down spout secure with
clips to the wall.
Fit the swan neck with shoe gutter
28-29 Check for obstructions in the down 11/06/2020 25/06/2020
pipe and remove it.
Calculate the sloping and find the
gradient

Page 3 of 4
Test for leakages and fix where
possible
30-31 Erection of storm water channels in 26/06/2020 09/07/2020
the facility
Inspection of the Chambers in the
facility for storm water collection.
Read and interpret the drawing with
the given specification in class.
32 Completion of module 4 additional 10/07/2020 20/07/2020
assignment for assessment
externally regarding all health and
safety measurement.

THERE ARE OTHER ADDITIONAL ASSIGNMENTS ON EACH OF THE MODULES THAT THE LEARNERS ARE EXPECTED
TO COMPLETE AND FACILITATOR MUST MARK THEM AND PLACE IN THEIR POE. THE FACILITATOR WILL SET THE
ASSIGNMENTS AND GUIDE THE LEARNER ON HOW TO COMPLETE THEM AND MARK THEM, WHICH CAN TAKE A
MONTH FOR ALL THE MODULES.
Marking of assignments for all workplace modules – 21/07/2020 – 21/08/2020.
Preparation for trade test – 21/07/2020 – 27/11/2020
Trade Testing – 30/11/2020 – 11/12/2020

Page 4 of 4

You might also like