TGG-2024-167 - GI Works For PGN Bridge - r2
TGG-2024-167 - GI Works For PGN Bridge - r2
TGG-2024-167 - GI Works For PGN Bridge - r2
CLIENT: Halla Engineering Co. LTD QUOTATION DATE: May 13, 2024
VALID UNTIL: June 12, 2024
PROJECT TITLE: Geotechnical Investigation Works for PGN Bridge CONTACT: Abellardo Pabayo
POSITION:
PROJECT ADDRESS: Guimaras Island, Iloilo NUMBER:
EMAIL: acpabayo@gmail.com
BILL OF QUANTITIES
QUOTE TGG-2024-167_r2 NO DESCRIPTION QTY UNIT UNIT RATE TOTAL
I. Geotechnical Investigation 2,260,000.00
a) Drilling rig w/crew, vehicle(s), temporary facilities 3.00 rig 300,000.00 900,000.00
b) Test pit/hand auger crews - ls 200,000.00 -
c) Permitting Fees, Taxes, Security and Safety 1.00 ls 500,000.00 500,000.00
d) Provision for Bonds and Insurances, if required 1.00 ls 180,000.00 180,000.00
e) Health and Safety Requirements 1.00 ls 230,000.00 230,000.00
f) Provision for Service Vehicle (personnel) 1.00 ls 150,000.00 150,000.00
g) Provision for truck service (transfers and supplies.) 1.00 ls 300,000.00 300,000.00
II. Land-Based Borings 7,599,600.00
a) Set-up and transfer of equipment 48.00 each 4,000.00 192,000.00
b) Drilling thru Soils (0-30m), N<50 1230.00 l.m. 2,000.00 2,460,000.00
c) Drilling thru Soils (30-40m), N<50 206.00 l.m. 2,500.00 515,000.00
d) Drilling thru Soils (40-50m), N<50 0.00 l.m. 2,500.00 -
e) Coring thru Dense Soils (N>50, Bedrock, Boulders, Gravel, any Depth) 396.00 l.m. 3,000.00 1,188,000.00
f) Standard Penetration Tests 1218.00 each 400.00 487,200.00
g) Undisturbed Sampling 48.00 each 800.00 38,400.00
h) Transport of Samples to Laboratory 1.00 ls 200,000.00 200,000.00
i) Provision of Coreboxes and other Sampling Materials 458.00 each 3,500.00 1,603,000.00
j) Borehole Restoration 1832.00 l.m. 500.00 916,000.00
III. Over-Water Borings -
Set-up and transfer of Equipment 0.00 each -
Drilling thru Soils (0-30m), N<50 0.00 l.m. -
Drilling thru Soils (30-40m), N<50 0.00 l.m. -
Drilling thru Soils (40-50m), N<50 0.00 l.m. -
Coring thru Dense Soils (N>50, Bedrock, Boulders, Gravel, any Depth) 0.00 l.m. -
Standard Penetration Test 0.00 each -
Undisturbed Sampling 0.00 each -
Transport of Samples to Laboratory 0.00 ls -
Provision of Coreboxes 0.00 each -
Borehole Restoration, if needed 0.00 each -
Provision for Floating Barge or Platform Each 0.00 each site -
Provision for Small Boat / Banca 0.00 ls -
IV. TEST PITS (1.5mx1.5mx1,5m, Manual Excavation) -
Excavation & Sampling & Transport to Laboratory 0.00 each 5,000.000 -
V. TEST PITS FOR CONSTRUCTION MATERIAL SOURCING (Fill, Aggregates) -
Excavation & Sampling & Transport to Laboratory 0.00 each 10,000.00 0.00
VI. HAND AUGER BORINGS (1.5 m depth maximum) -
Excavation & Sampling & Transport to Laboratory 0.00 each 1,500.00 -
VII. LABORATORY TESTING (BOREHOLES) 4,669,200.00
Soil Classification 1,097.00 each 150.00 164,550.00
Specific Gravity Test 1,097.00 each 250.00 274,250.00
Moisture Content 1,097.00 each 150.00 164,550.00
Particle Size Analysis 1,097.00 each 200.00 219,400.00
Atterberg Limit 1,097.00 each 300.00 329,100.00
Hydrometer 1,097.00 each 400.00 438,800.00
Unit Weight 1,097.00 each 1400.00 1,535,800.00
Unconfined Compression Test (Soil / Rock) 548.50 each 1500.00 822,750.00
Consolidation Test 48.00 each 7500.00 360,000.00
Triaxial Test (UU) 48.00 each 7500.00 360,000.00
VII. LABORATORY TESTING (TEST PITS/HAND AUGER BORINGS) -
Soil Classification - each 150.00 0.00
Specific Gravity Test - each 250.00 0.00
Moisture Content - each 150.00 0.00
Particle Size Analysis - each 200.00 0.00
Atterberg Limit - each 300.00 0.00
Hydrometer - each 400.00 0.00
Unit Weight - each 1400.00 0.00
California Bearing Ratio (CBR) - each 2000.00 0.00
Proctor Compaction Test (Modified) - each 750.00 0.00
Los Angeles Abrasion Test - each 7500.00 0.00
Water Absorption - each 7500.00 0.00
Soundness - each 7500.00 0.00
VIII. GEOTECHNICAL INVESTIGATIONS REPORTING 300,000.00
Factual Reporting including boring logs, soil profiles, laboratory test 1.00 ls 300,000.00 300,000.00
Technical Evaluation & Recommendation - ls 100,000.00 0.00
APPROVALS
Quotation Prepared By
NAME: S.M. SALARDA CONTACT: +63 917 815 9190
POSITION: Executive Assistant EMAIL: shaira.salarda@teragrail.com
Quotation Approved By CLIENT'S ACCEPTANCE
CLIENT NAME:
CONTACT NO:
NAME AND SIGNATURE: EMAIL:
C.C.A. FAJARDO DATE:
POSITION: President
EMAIL: clement.fajardo@teragrail.com SIGNATURE
CLIENT: Halla Engineering Co. LTD QUOTATION DATE: May 13, 2024
VALID UNTIL: June 12, 2024
PROJECT TITLE: Geotechnical Investigation Works for PGN Bridge CONTACT: Jeung Bae
POSITION:
PROJECT ADDRESS: Bulacan NUMBER:
EMAIL:
C.C.A. FAJARDO
NAME / DATE President