2021-22 MANDWARA TOLL FEE USER

S.No. Particular
1 Net Road Length
a Four Lane 0
b Two Lane 33.996
2 Net bypass Length
a Four Lane 0
b Two Lane 0
3 Total structure length
a Four Lane 0.264
b Two Lane 0
5 N 14
6 WPI as 2007-2008 208.7
7 WPI Dec. 2020 125.40
8 Linking factor
Effective for 2011-2012
WPI (WPI * Linking factor for 1.641
9 Linking factor
2011-2012 for 2004-2005
* Linking factor for 2004- 1.873
10 2005(125.4*1.641*1.873)) 385.429

Sl. No. Particular Car LCV


A Determination of Toll Rates as per Fee Notification
i Base Rate A 0.650 1.050
ii Fixed Increase(14*3%) B=A*14*3% 0.273 0.441
iii Revised base rates C= A+B 0.923 1.491
iv WPI as on 06.01.2007 D 208.700 208.700
v WPI for Dec. 2020 (125.4 *1.641 * 1.873= 385.429) E 385.429 385.429
vi 40% of increase in WPI (As % of revised based rate) F=(E-D)/D*0.4 0.339 0.339
vii Increase in base rates due to change in WPI G=C*F 0.313 0.505
viii Revised base rates (Cummulative) H=C+G 1.236 1.996
B Determination of Tollable length [Four Lane
i Section]
Net Road Length without structure>60m (Kms) Bi - -
ii Net bypass Length without structure > 60m (Km) Bii - -
iii Total length of Structure >60m (on Road & Bypass ) Biii 0.264 0.264
iv Converted equivalent road length for Structure > Biv= Biii x 10 2.640 2.640
C 60m
Total(in Kms) Road Length in Kms [four lane]
tollable C= Bi + Biv 2.640 2.640
D Total tollable Bypass Length in Kms [four lane] D = Bii - -
E Determination of Tollable length [Two Lane E
i Section]
Net Road Length without structure>60m (Kms) Ei 33.996 33.996
ii Net bypass Length without structure > 60m (Km) Eii - -
iii Total length of Structure >60m (on Road & Bypass ) Eiii - -
iv Converted equivalent road length for Structure > Eiv= Eiii x 10 - -
F 60m
Total(in Kms) Road Length in Kms [two lane]
tollable F= Ei + Eiv 33.996 33.996
G Total tollable Bypass Length in Kms [two lane] G = Eii - -
H Determination of User Fee H
i Fee for the Road Stretch [Four Lane] Hi= Aviii x C 3.26 5.27
ii Fee for the Road Stretch [Two Lane] Hii= Aviii x F x 60% 25.20 40.71
iii Fee for the Bypass Stretch [Four Lane] Hiii= Aviii x D x 150% 0.00 0.00
iv Fee for the Bypass Stretch [Two Lane] Hiv= Aviii x G x 60% x 0.00 0.00
I Fee for the Whole Section 150%
I = Hi+Hii+Hiii+Hiv 28.47 45.98
J Rounded off fee for single trip J= Mround(I,5) 30 45
Ji Prerounded fee for return trip Ji= I*1.50 42.70 68.98
K Rounded off fee for return trip K= Mround(Ji,5) 45 70
Ki Prerounded fee for monthly pass for 50 trips Ki=I*50*2/3 948.87 1532.80
L Rounded off fee for monthly pass valid for 50 single L= Mround(Ki,5) 950 1535
Li trips
Discounted fee for the commercial vehicles Li= I*50% 14.23 22.99
registered within the district
M Rounded off fee for the commercial vehicles M= Mround(Li,5) 15 25
registered within the district

Sl. No. Particular CAR LCV


1 Fee for single trip 30 45
2 Fee for return trip 45 70
3 Fee for monthly
commercialpassvehicles
for 50 trips
registered 950 1535
4 within the district 15 25
ER

Bus/ 3-Axle MAV/ Oversized Monthly


Truck HCV(3-6 Pass
Axle)
2.200 2.400 3.450 4.200 150.000
0.924 1.008 1.449 1.764 63.000
3.124 3.408 4.899 5.964 213.000
208.700 208.700 208.700 208.700 208.700
385.429 385.429 385.429 385.429 385.429
0.339 0.339 0.339 0.339 0.339
1.058 1.154 1.659 2.020 72.148
4.182 4.562 6.558 7.984 285.148

- - - - -
- - - - -
0.264 0.264 0.264 0.264 0.264
2.640 2.640 2.640 2.640 2.640
2.640 2.640 2.640 2.640 2.640
- - - - -

33.996 33.996 33.996 33.996 33.996


- - - - -
- - - - -
- - - - -
33.996 33.996 33.996 33.996 33.996
- - - - -

11.04 12.04 17.31 21.08


85.31 93.06 133.78 162.86
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
96.35 105.11 151.09 183.94
95 105 150 185 285
144.52 157.66 226.63 275.90
145 160 225 275
3211.57 3503.53 5036.33 6131.18
3210 3505 5035 6130
48.17 52.55 75.54 91.97

50 55 75 90

Bus/ Oversize Monthly


3-Axle HCV
Truck d Pass
95 105 150 185 285
145 160 225 275
3210 3505 5035 6130
50 55 75 90