Professional Documents
Culture Documents
Gabs at Trunnion Bearings
Gabs at Trunnion Bearings
Tube mill
Gaps at trunnion bearings
Place: Date:
Measuring record
C
B
A Oil intake side
C
B
C A
B
A C
Direction of B
rotation
A
Check with feeler gauge
about ~ 1/3 surface of main contact
x1 b1 x2 b2 x1 b1 x2 b2 x1 b1 x2 b2 x1 b1 x2 b2
(mm) (mm (mm (mm (mm) (mm) (mm (mm (mm) (mm (mm (mm (mm) (mm) (mm (mm
A A
B B
C C
TKIS Client
Signature Signature
TM.09en Vs 00 Page 1
Tube mill
Gaps at trunnion bearings
Nominal dimensions (Page 2)
Oil intake
b2 X2
X1 b1
X2
X2
b1 X1
X2 b2
Nominal dimensions
Trunnion without load Trunnion with load
Ø Trunnion
x1 b1 x2 b2 x1 b1 x2 b2
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
1000 0.4 10 0.2 150 0.2 10 0.1 150
1200 0.6 10 0.3 150 0.3 10 0.1 150
1300 0.6 10 0.3 200 0.3 10 0.1 200
1400 0.6 10 0.3 200 0.3 10 0.2 200
1500 0.6 10 0.4 200 0.4 10 0.2 200
1650 0.9 10 0.5 250 0.5 10 0.2 250
1800 1.0 10 0.5 250 0.5 10 0.2 250
2000 1.0 10 0.5 300 0.5 10 0.2 300
2200 1.2 10 0.7 300 0.5 10 0.3 300
2400 1.2 10 0.7 300 0.6 10 0.3 300
2600 1.2 10 0.7 400 0.6 10 0.3 400
2800 1.3 10 0.7 400 0.7 10 0.4 400
3000 1.5 10 0.8 450 0.7 10 0.4 450
3200 1.5 10 0.8 450 0.8 10 0.5 450
3400 2.1 10 1.2 450 0.8 10 0.5 450
Test run: After 8 hours of operating time, the bearing temperature should stabilize
TM.09en Vs 00 Page 2