Konti-Skan 1 HVDC

Project
AREVA first for HVDC 380MW
Link between Sweden &
Denmark

CUSTOMERS - SVENSKA KRAFTNÄT, WHICH OWNS AND OPERATES


SWEDEN’S TRANSMISSION NETWORK WITH RESPONSIBILITY FOR THE
NATIONAL ELECTRICITY GRID, COMPRISING THE COUNTRY’S 400 AND 220KV
POWER LINES. ELTRA, ITS DANISH COUNTERPART, WHICH OWNS AND
OPERATES THE 400KV TRANSMISSION NETWORK FOR JUTLAND AND FUNEN
IN WESTERN DENMARK AND IS RESPONSIBLE FOR THE OVERALL SECURITY
OF THE SUPPLY, INCLUDING CONNECTIONS TO NEIGHBOURING COUNTRIES.
Power Electronics

Innovative thyristor valve technology replaces


old mercury arc system

Pole 1 of the Konti-Skan HVDC Gothenburg, requiring an extension Turnkey solution


undersea electricity transmission link, to the overhead lines of around
operated by Svenska Kraftnät and 25km from Stenkullen. At the core of This is a proven, reliable and
ELTRA, which spans the Kattegat the new installations is the latest costeffective system that was
between Sweden and Denmark and version of AREVA’s HVDC thyristor recently employed for the 500MW
allows the two countries to valve. back-to-back HVDC interconnector
SUCCESS STORIES -

exchange power, is nearing the end at Sasaram in India to complete its


of its design lifetime. AREVA has These greater power density valves national grid.
been awarded the contract to use series-connected, fully protected
replace the ageing 1960’s mercury thyristors, each with 8.5kV rating Under the turnkey contracts, AREVA
arc technology, and only the and 125mm diameter. They will be via its Transmission & Distribution
submarine cable and overhead lines controlled through AREVA’s industry- Sector, will design, construct and
will remain. leading Series V digital control and supply all equipment for the two
protection system, offering fully converter stations. The HVDC link
The 40M euro investment will see redundant operation, including scheme will connect both the
the converter station in Vester monitoring and alarm capability. Swedish and Danish 400kV ac grids.
Hassing, Denmark, completely The two ac systems are
renewed, using state-of-the-art interconnected by two AREVA HVDC
technologies. converter stations consisting of 50Hz
switchyards with harmonic filter
In Sweden, a new converter station bays, converter transformers,
is to be built to the same thyristor valves and dc filters /
specification, at Lindome near smoothing reactors. Power is
transmitted into the 90km link at
285kV dc.

T&D
Improved The new control system also enables Much of the power in Sweden and
performance fast control of the power exchange Norway is derived from hydro sources.
through both poles, to benefit the However, in recent years, dry
The substantial rebuild will two ac systems under emergency summers and very cold winters have
completely revitalize the power conditions. In the future, both of the led to increasing water shortages and
exchange link and the capacity will Konti-Skan 1 converter stations will reduced electricity generation.
now be equal to the existing Konti- be fully automated.
Skan 2 pole, at 380MW, allowing
both countries to support each other Project management
by trading more energy to better expertise
balance out power shortfalls and
surpluses. Success in winning the prestigious
project, a first for AREVA in
IQMedia • SYS-L5-KSkanHVDC-0109-GB – © - AREVA – 2004, the AREVA logo and any alternative version thereof are the trademarks and services marks of AREVA.

Scandinavia in the HVDC field, was


spearheaded from Stafford in the
The other names mentioned, registered or not, are the property of their respecive companies – 389191982 RCS PARIS – Creation : IQ Media – Printed in the UK

UK, the core competency centre for


HVDC throughout the world. The The necessity to import power from
expertise of many specialist AREVA Finland, mainland Europe, Russia
divisions in the UK and France were and other Baltic States is becoming
brought together to win the project ever greater. AREVA expects the
and will again be utilized in its Scandinavian HVDC market to grow
successful implementation. leading to AREVA securing further
The new control technology will sizeable power transmission projects
deliver system security and reliability Scandinavian future in the future.
because there is no requirement for With a completion date for the
recalibration caused by ‘drift’. At the project of October 2005, AREVA’s AREVA advantages
same time, the unreliability, large proven capability to construct,
outage times and high maintenance deliver, install and commission HVDC > Most competitive and attractive
costs of the mercury arc system will schemes, as well as to fulfil the technical solution
be eliminated. technical training within a 30month
period, was an essential part of the > Use of state-of-the-art converter
The further addition of a bi-pole order-winning formula. station and thyristor valve
control system will enable high-level technology
control of the Konti-Skan 2 pole as
well as the new Konti-Skan 1 pole to > Supply of industry-leading AREVA
minimize current flow in the sea Series V digital control and
electrode, an environmentally protection equipment
desirable feature.
> Converter stations will be fully
automated

www.areva-td.com