Professional Documents
Culture Documents
3 Winding Transformer Zero Sequence Impedance Buried Delta
3 Winding Transformer Zero Sequence Impedance Buried Delta
3 Winding Transformer Zero Sequence Impedance Buried Delta
3-Winding Transformers
Calculations of Zero-Sequence Impedance with Buried Delta Winding
Based on Zero-Sequence Short Circuit Impedance Test Values Between All Windings
Type: Calculation
Assume the transformer is symmetric, the Z matrix is symmetric with 6 independent entries.
Therefore, 6 sets of test data are required to build the matrix. The circuit diagram of Figure 1 is
used to build the Z matrix based on the test data.
Page 1 of 2
This document is confidential and proprietary to Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2014 by Operation
Technology, Inc. All Rights Reserved.
ETAP Knowledge Base
3-Winding Transformers
Calculations of Zero-Sequence Impedance with Buried Delta Winding
Based on Zero-Sequence Short Circuit Impedance Test Values Between All Windings
HV = Primary Winding
XV = Secondary winding
YV = Tertiary Winding
𝑍𝑝 = 𝑍11
𝑍𝑠 = 𝑍22
𝑍𝑡 = 𝑍33
ETAP impedance 𝑍𝑝𝑠 is defined as Primary winding to Secondary and Buried Delta , 𝑍𝑝𝑡 is defined
as Primary winding to Tertiary and Buried Delta and 𝑍𝑠𝑡 is defined as Secondary winding to Tertiary
and Buried Delta.
Page 2 of 2
This document is confidential and proprietary to Operation Technology, Inc. and may not be reproduced, published or disclosed to others
without the written authorization of Operation Technology, Inc., 17 Goodyear, Suite 100, Irvine, CA 92618, USA. © 2014 by Operation
Technology, Inc. All Rights Reserved.