Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

MATHS WORKSHEET 02.03.

2024
1 A, B and C can do a work िरता है और A से शुरू िरते हुए
separately in 18, 36 and 54 एिाोंतर किनोों में उसिी A और C
days, respectively. They द्वारा सहायता िी जाती है , तो िाम
started the work together, कितने किनोों में समाप्त हो जाएगा?
but B and C left 5 days and 10 a) 10
days, respectively, before the b) 9
𝟏
𝟑
completion of the work. In c) 3
how many days was the work d) 8
finished? 3 A and B together can finish a
A, B और C किसी िाम िो अलग- piece of work in 12 days. B
अलग क्रमशः 18, 36 और 54 किन and C the same work can be
में िर सिते हैं। उन्ोोंने एि साथ finished separately in 16
िाम िरना शुरू किया, लेकिन B days. A and B work together
और C ने िाम पूरा होने िे पहले for 6 days, after that A leaves
क्रमशः 5 किन और 10 किन पहले the work, B works for 4 more
िाम छोड़ किया। कितने किनोों में days after that he also leaves.
िाम पूरा हुआ? Now C starts working and
(a) 15 days finishes the work, then in
(b) 13 days how many days will C finish
(c) 14 days the work?
(d) 12 days A तथा B कमलिर किसी िाम िो
2 A, B and C can do a piece of 12 किनोों में समाप्त िर सिते हैं।
work in 11 days, 20 days and B तथा C उसी िाम िो अलग-
55 days respectively. If B अलग 16 किनोों में समाप्त िर
works daily and is supported सिते है A तथा B, 6 किनो ति
by A and C on alternate days साथ िाम िरते हैं उसिे पश्चात A
beginning with A, then in िाम छोड़ िे ता है , B,4 किन और
how many days will the work िाम िरता है उसिे बाि वह भी
be finished? िाम छोड़ िे ता है । अब C िाम
A, B और C एि िाम क्रमशः 11 िरना शुरू िरता है और िाम
किन 20 किन और 55 किन में पूरा िो खत्म िरता है, तो C कितने
िर सिते हैं। यकि B प्रकतकिन िायय किनो में िाम खत्म िरे गा ?
ROJGAR WITH ANKIT
MATHS WORKSHEET 02.03.2024
a) 5 days गोंगा तथा सरस्वती अलग-
b) 7 days अलग किसी खे त िी िटाई
c) 6 days क्रमशः 8 तथा 12 घोंटें में पूरी
d) 4 days
िर सिती है । यकि गोंगा द्वारा
4 A and B separately can build
a wall in 12 and 16 days,
पूवायह्न 9 बजे िटाई आरों भ
respectively. If they work for िरते हुए वे बारी-बारी से एि-
each day alternatively, एि घोंटे िी समयावकि में िायय
starting with A, in how many िरे , तो पूरा िटाई िा िायय
days will the wall be built? िब पूरा होगा?
A और B अिेले-अिेले किसी a) 6 pm
िीवार िा कनमायण क्रमशः 12 और b) 6:30 pm
16 किन में िर सिते हैं। A से शुरू c) 5 pm
िरिे, यकि वे बारी-बारी से प्रत्येि d) 5:30 pm
किन िायय िरते हैं, तो कितने किनोों 6 A,B and C can do a piece of
में िीवार िा कनमायण पूरा हो work in 30,20 and 10 days
जाएगा? respec- tively. A is assisted by
𝟐
a) 7 days B on one day and by C on the
𝟑
𝟐
b) 12 days next day, alternatively. How
𝟑
𝟐 long would the work take to
c) 13 days
𝟑 finish?
𝟑
d) 6 days A, B तथा C किसी िाम िो क्रमश:
𝟒
5 Ganga and Saraswati, 30, 20 तथा 10 किनोों में िर सिते
working seperately can हैं। B तथा C बारी-बारी से िाम में
A िी सहायता िरते हैं, तो िाम
mow a field in 8 and 12
कितने किनोों में समाप्त होगा?
hours respectively. If they 𝟑
a) 9 days
work in streches of one 𝟖
𝟖
b) 4 days
hour alternately, Ganga 𝟖
𝟒
beginning at 9 am, when c) 8 days
𝟏𝟑
will the mowing be
𝟗
d) 3 days
𝟏𝟑
completed?
ROJGAR WITH ANKIT
MATHS WORKSHEET 02.03.2024
7 A, B and C can do a piece of 9 When A does a piece of work
work in 20,30 and 60 days alone, it takes 36 days more
respectively. In how many than the time taken by A and
days can A do the work if he B together to do the work.
is assisted by B and C on On the other hand, B takes 25
every third day? days more to do the same
A, B और C किसी िाम िो work alone than the time
क्रमशः 20, 30 तथा 60 किनोों में taken by A and B together to
खत्म िरते हैं। तो A कितने किनोों do the same work. In how
में िाम खत्म िरे गा यकि B तथा C many days will A and B,
प्रत्येि तीसरे किन िाम में उसिी working together, complete
सहायता िरें गे? the work?
(a) 10 days जब A अिेले किसी िायय िो
(b) 𝟏𝟐 days िरता है , तो उसे A और B द्वारा
(c) 𝟏𝟓 days एि साथ कमलिर उस िायय िो
(d) 𝟐𝟎 days िरने में लगने वाले समय से 36
8 A. B and C can do a piece of किन अकिि लगते है । िू सरी और B
work in 10, 15 and 30 days, िो अिेले उसी िायय िो िरने में
respectively. If B and C both A और B द्वारा एि साथ कमलिर
assist A on every third day उसी िायय िो िरने में लगने वाले
then in how many days can समय से 25 किन अकिि लगते है।
the work be completed? A और B एि साथ कमलिर िायय
A, B और C क्रमशः 10, 15 और िरते हुए उस िायय िो कितने
30 किनो में एि िायय िो पूरा िर किनोों में पूरा िरे गे ?
सिते हैं। यकि B और C िोनोों, हर (a) 33
तीसरे किन A िी सहायता िरते हैं, (b) 32
तो िायय कितने किनोों में पूरा हो (c) 30
सिता है ? (d) 34
10 Two workers A and B are
𝟏
(a) 8
𝟐
(b) 8 employed to do a certain
(c) 5 work. A will take 8 hours
𝟏
(d) 7
𝟐
more to complete the
ROJGAR WITH ANKIT
MATHS WORKSHEET 02.03.2024
work alone than if he
works together. B will
𝟏
take 12 𝟐 hours more to
work alone than to work
together. How long will it
take if both work
together?
िो िामगार A और B किसी िाम
िो िरने िे कलए लगाए गए है। A
िो कमलिर िाम िरने िी तुलना
में अिेले िाम पूरा िरने में 8 घण्टे
अकिि लगेगे। B िो कमलिर िाम
िरने िी तुलना में अिेले िाम
𝟏
िरने में 12 घण्टे अकिि लगेगे।
𝟐
यकि िोनोों कमलिर िाम िरे गे तो
कितना समय लगेगा।
(a) 𝟏𝟎
(b) 𝟏𝟐
(c) 𝟖
(d) 𝟓

ANSWER KEY
1. B 2. B 3. D
4. C 5. B 6. A
7. C 8. B 9. C
10. A

ROJGAR WITH ANKIT

You might also like