PFD Print 1803

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13

Equipment List
ITEM NO. SERVICE A
A
T-101 Carbon Dioxide Tank
T-102 Hydrogen Tank
K-101 Compressor
K-102 Compressor
K-103 Compressor
150 R-201 Reactor
65 E-301 Condenser
B 9 V-301 Flash Drum B
EK-301 Ekspander
FLARE EK-302 Ekspander
COOLING WATER K-301 Compressor
P-301 Pump
DOWTHERM P-302 Pump
P-303 Pump
STEAM
E-303 Cooler
C 200 200 1
E-302 Heater C
20 65 E-304 Condensor
82,2
9 9 14
C-301 Distillation Column
E-306 Reboiler
V-302 Accumulator
475 VLV-301
150 E-305 Cooler
280 E-303 T-301 Methanol Wherehouse
55.3 200 8 65
9
15 20 Legend
D 1 2 D
E-304 Pressure (atm/bar/psi/kPa)
T-101 K-301
Temperature (oC)
K-101 V-302 1
1 No. Stream
65
150 65 16 1 E-90 Flow Process
65 1,2 15
30 T-301 Dowtherm
10 86,84 17
13 E-108 Steam
E V-301 C-301 P-301 E-305 IPAL E
197.4 200
15 20 200 3 P-302
3 4
20 R-201 99,81
T-102 5 19 5

K-102 473.7 473.7 150


1 4
280 150 65
25 11 63
F 6 7 280 12 3 F
9 IPAL
E-306 2

EK-302 1
K-103 E-101 EK-301
E-301 E-302
REV ISSUE DESCRIPTION TPR AM SPV 1 SPV 2
18 DATE
92
1,5
G CONDENSATE
G
COOLING WATER RETURN

WASTE HEAT DOWTHERM


PROJECT :
METHANOL PRODUCTION FROM
H CARBON DIOXIDE (CO2) AND HYDROGEN (H2) H
135,000 TON/YEAR
TITLE :

PROCESS FLOW DIAGRAM OF METHANOL Variant


1 I
I
SCALE DRAWING NO REV

NTS 1 of 1 1

1 2 3 4 5 6 7 8 9 10 11 12 13

You might also like