Professional Documents
Culture Documents
ELC11 ECOTHERM EN - Mit WP - Screen
ELC11 ECOTHERM EN - Mit WP - Screen
Model EDRE
steam/water
Model EHRE/EHPE
heating water
Operating and
Maintenance Instructions
Models EHRE/EHPE & EDRE
High Capacity
Water Heaters
Microprocessor Control: ELC 11_V.1.0
www.ecotherm.com
ECOTHERM
®
Contents
Heat Transfer Solutions
Contents
1. Introduction 4
1.1 Preparing for installation 4
1.1.1 Unpacking storage tanks 4
1.1.2 Non-return valves for cold water supply and circulation connections 4
1.1.3 Filter recommendations 4
1.1.4 Primary circuit heating water pressure from boiler 4
1.1.5 Secondary circuit expansion vessel 4
1.1.6 Tank legs 4
1.1.7 Electronic control unit - maximum operation temperature 4
1.1.8 Low power electrical supply to control unit and electric anodes 4
1.1.9 Copper piping and water borne chloride ions 4
1.1.9a Isolating connectors 4
1.1.9b Non-sacrificial electric anode 4
1.1.9c Simple repair 4
2. Warranty, safety instructions and general information 5
2.1 General 5
2.2 Guarantee 5
2.2.1 Warranty 5
2.2.2 Additional warranty conditions for the stainless steel storage tank 5
2.2.3 Liability 5
2.2.4 Validity clause 5
2.2.5 Choice of law 5
2.3 Safety guidelines 6
2.4 Product description & delivery content 7-9
2.5 Packaging 10
2.6 Compliance statement 10
3. Installation and assembly 11
3.1 Space requirement 11
3.1a Requirement of more space for additional tanks 11
3.2 Installation 12
3.3 Heat exchanger assembly 12
3.4 Cover assembly 12
3.5 Connection dimensions and heights 13
4. Connection piping 14
4.1 General remarks 14
4.2 Cold water connection 14
4.3 Hot water connection 14
4.4 Circulation pipeline 14
4.5 Ventilation 14
4.6 Drainage 14
4.7 Primary circuit connection to boiler 14
4.8 Re-tightening of the flange bolts 14
4.9 Heat exchanger, pumps and valves for EH water heater 15
4.10 Primary control valve and primary side connection dimensions 15
5. Electrical connection 16
5.1 General remarks, safety guidelines, warnings 16
5.2 Electrical loading 17
5.3 Electrical connection diagram 17-23
6. Filling and venting of the water heater 24
6.1 Flushing of the plant 24
6.2 Filling the storage tank and secondary circuit 24
6.3 Filling and venting the primary circuit 24
7. Control Unit description and operation control unit ELC 11 25
7.1 General buttons 25
7.2 Display and keypad 26
7.3 Description of the display units 27
7.3.1.1. Service page 27
7.3.1.2. Time out safety level 27
2 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Introduction
Heat Transfer Solutions
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 3
ECOTHERM
®
Introduction
Heat Transfer Solutions
1. Introduction
Congratulations!
With the purchase of your high This manual contains vital information Compliance with all instructions is
capacity water heater from on starting-up and service of your the basis of smooth and trouble-
Ecotherm you have opted for a Ecotherm high capacity water free operation of the Ecotherm
device incorporating the ultimate in heater. high capacity water heater and
hygiene, economy, reliability and safeguards your rights in the event
functionality. We are convinced that Please read this information carefully of warranty claims.
your users will enjoy the benefits of before starting up and familiarise
your high capacity water heater for a yourself with the operating processes
long time. required.
1.1.1 Unpacking storage tanks aeration. Ecotherm recommends 1.1.8 Low power electrical supply
Extreme care is required when un- that a closed expansion vessel with to control unit and electric anodes
packing the pre-assembled compo- pressurised fill-up be fitted to the pri- Sufficient standard household plug
nents from the casing. Some items mary circuit. sockets are to be provided within the
are top heavy, and certain parts (e.g. area of the front covers of the Eco-
microprocessor housing) cannot bear 1.1.5 Secondary circuit expansion therm control unit. Rating 230V
the weight of the pre-assembly when vessel ±5%, single phase, 2.5 kVA total
laid sideways on the floor. When re- An expansion vessel connected to power for both sockets.
moving storage tanks from a container, the domestic hot water supply line is
care must be taken while clearing the required to allow for the increase of 1.1.9 Copper piping and water borne
doorway not to damage or knock off water volume during heating. Failure chloride ions
the air vent protruding from the top of to observe this requirement may result The following applies to installations
the tank. in regular small losses of heated do- with copper piping and water borne
mestic water through the Ecotherm chloride ions (> 100 mg/litre):
1.1.2 Non-return valves for cold product‘s own pressure safety valve 1.1.9a Isolating connectors
water supply and circulation con- during heating. All connections must be electrically
nections
isolated from the copper piping using
Non-return valves must be provided 1.1.6 Tank legs the special isolating flange kits and
for the secondary domestic cold water Tank legs MUST NOT be screwed or isolating screw connectors provided.
supply and circulation connections, in fixed to the floor under any circum-
order to avoid possible convectional or stances, otherwise expansion strain 1.1.9b Non-sacrificial electric anode
expansive back flow of heated water. will cause cracks, which may lead to The non-sacrificial electric anode sup-
leakage. The tank must be placed on plied must be connected to the mains
1.1.3 Filter recommendations the floor, supported by its legs, which power supply and be operational at
To avoid damage to pumps and fouling must be able to move slightly as the all times, in order to inhibit galvanic
of heat exchangers by intake of foreign tank expands or contracts. (The screw transport of material away from stain-
bodies, Ecotherm recommends holes in the base of the legs are for less steel surfaces.
that strainers be placed in front of sup- transportation purposes only.) 1.1.9c Simple repair
ply connections as follows: Please note that in the unlikely event
Primary circuit heating water supply: 1.1.7 Electronic control unit - maxi- of pitting occurring, affected stainless
Strainer mesh size 150 - 200 µm. mum operating temperature steel areas can be quickly and cheaply
Secondary circuit cold water supply: Damage to electronic components repaired to 100 % serviceability on site
Strainer mesh size 50 - 60 µm may occur if the surrounding air by your local Ecotherm Support
temperature in the immediate vicinity Centre using specialised techniques
1.1.4 Primary circuit heating water rises above 40°C. The ambient air developed by Ecotherm. Stainless
pressure from boiler temperature must be low enough to steel therefore offers the best possible
The heating water supply to the heat enable sufficient heat radiation cool- choice for better hygiene, durability
exchanger has minimum pressure re- ing of the high temperature electronic and longer life.
quirement of 1.5 bar, and a maximum components.
of 10 bar. Failure to observe this re-
quirement may potentially expose the
primary circuit to negative pressure
4 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
2.2 Guarantee Any other use shall be deemed as not 2.2.2 Additional warranty conditions
conforming with the intended purpose for the stainless steel storage tank
2.2.1 Warranty and shall be excluded from any warranty The warranty period of 5 years for the
Ecotherm stainless steel products are claims. Prior to installation and start-up of stainless steel storage tank is valid under the
supplied with a manufacturer’s warranty against the Ecotherm high capacity heater the following additional conditions:
leakage subject to the General Terms and technical specification should be checked to
ensure safe and proper use. 1. The assembly of a fine filter in the cold
Condition of Trade. Warranty claims require water inlet
compliance with the items listed in chapter 1.1 2. Only stainless steel dummy plugs and
on page 4, as well as the following: In the event of the Ecotherm high
immersion sleeves are used
capacity water heater being damaged or
3. Water of drinking water quality and with
Goods should be checked for completeness on functioning unsatisfactorily, please refrain a chlorine content of less than 70 mg
delivery and for external or hidden defects on from attempting repairs yourself and instead CI/L should be used. If the chlorine
delivery. In the event of any doubt ECOTHERM notify your service agent. Repairs may only content is higher there must be
should be notified immediately. be carried out by an Ecotherm service sufficient externally powered anodes in
engineer using only original Ecotherm continuous operation.
The warranty period is: spare parts. Non-compliance with these 4. Connecting piping of copper or steel are
5 years on stainless steel goods manufactured stipulations may affect function and to be separated electrically (electronic
by us. operational safety of the Ecotherm high separation joint or and electronic
1 year on everything else (e.g. additional capacity water heater and will invalidate any separation sleeves with flange connections)
goods purchased, accessories) 5. The tank legs are left free standing and
The warranty covers the free replacement of warranty claims.
not screwed to the floor
parts, where it can be proved that the defect
is due to material, production or construction Installation should be carried out in 2.2.3. Liability
faults. The warranty does NOT cover: accordance with all applicable regulations
• Dismantling and re-assembly costs As regards direct or indirect damages
and guidelines an also in accordance which arise due to inadequate delivery and
• Consequential damages or profit loss
which may arise from a defect. with manufacturer‘s specifications by an performance, we will only be liable in as
Warranty claims have no delaying authorised and qualified installer. far as a defect can be proved to have
effect on the payment dates and other Faulty and improper installation may cause been caused. We assume no liability for
demands. damage to persons, animals and materials consequential damages or loss of profit.
The warranty is no longer valid: for which Ecotherm cannot accept any
• if the warranty conditions mentioned in § 8 2.2.4 Validity clause
and § 9 of our standard business conditions liability whatsoever.
If individual clauses were to invalidate this
are not met condition, this does not affect the validity of
• if damages are caused by misuse or For hygienically faultless and safe operation
operating errors. the remaining conditions.
we recommend regular servicing. Contact
• If there is evidence of abuse and your nearest Ecotherm Support Centre 2.2.5. Choice of law
improper operation
• If there are violations of the official or for further information. (See Internet www. Austrian law is valid. Place of performance
legal regulations ecotherm.com for current address list) and jurisdiction is Linz, Austria.
The Ecotherm high capacity water heater is The details and data published in this
exclusively designed for use in closed-circuit technical document reflect the current state
installations. of developments. Ecotherm reserves at
the right to modifications serving technical
progress at any time, without any obligation
whatsoever.
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 5
ECOTHERM
®
Installation and connection should only The cross section of safety valve Electrical connection must only be
be carried out by approved contractors in piping (max. 2 elbows, max. length 2 carried by qualified specialist personnel
accordance with applicable regulations m) shall be at least that of the safety of an accredited electrical contractor.
and technical specifications. valve. The outlet of the safety valve For electrical connection, the TAB,
should flow into an tundish to enable VDE, ÖVE and TAEV regulations with
Approved safety devices shall be observation, and the drainage piping the appropriate design specifications
installed In the cold water supply. should be arranged to ensure that any shall be complied with.
blow-off of steam or hot water cannot For cleaning and service of the system
The operating pressure stated on the cause danger to persons present. the electric power supply must be
rating plate must not be exceeded. disconnected.
With higher line pressure, a pressure The drainage piping after the tundish
reducer should be fitted, whose must be of at least twice the cross Prior to initial start-up the entire water
function can be controlled by a section of the valve inlet. Safety valve heater must be carefully flushed and
downstream test valve. and and drainage pipes shall be checked for proper installation. Initial
designed frost-proof and may not be start-up may only be performed by an
The safety valve shall be fitted in the routed to atmosphere. In the vicinity Ecotherm service engineer.
cold water pipe and be non-closing of the safety valve a warning sign
from the tank. Fitting of dirt traps or shall be provided bearing the following
other restrictions in the supply line is inscription.
not permitted. The safety valve shall
be installed to react at the permissible
operating pressure at the latest.
6 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
The Ecotherm high capacity water Free floating rods in the heat The controller constantly provides
heater is designed for water heating in exchanger tubes create a 0.5 to 1.5 information on the system‘s
large housing estates, hospitals, hotels, mm thick water film along the tube operational status by continuously
sanatoriums, etc. All water carrying walls, ensuring high speed turbulent monitoring operation and performance
components (tank, heat exchanger flow and optimum heat transfer. The of the individual components (charging
and piping) are manufactured from constantly oscillating rod prevents condition, condition of heat exchanger
titanium stabilised chrome nickel lime scale deposits during charging and fault alarm). The regulation is able
steel (1.4571) and suitable for potable and ensure the self-cleaning effect. to communicate with external systems
water. The tank conforms to Federal A microprocessor controller controls via houseown networks or via internet
Health Ministry recommendations the charging operation and via a (recording, remote request, remote
and DVGW guidelines to avoid the control valve maintains constant hot influence).
risk of Legionella infection (Technical water temperature during charging.
Specification, Work Sheet A heating pump or a minimum
W 551). The tank is charged via admission pressure of 0.6 bar is to be
an external tubular heat exchanger. provided by the customer.
Hot water flowing through the heat
exchanger tubes is separated from
the primary heating circuit by the
tubes located inside the shell of the
heat exchanger.
11
9 9
T5
7
M
9
Air vent Pp
4
T3
HW 9 17 SV
8
6 18
HE return.
T4
1 P1
3 5 19
9 10 14 9 Ps
17 P2
T1 Heating on
Circulation Z
2
T2 Heating off
15 16
6
CW 9
17 HE feed
11
12 14
9
19 13 Scope of delivery
Drain
P1
Fig. 1: High capacity water heater model EH
5
using heating-water type boilers.
Legend see page 8
P2
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 7
ECOTHERM
®
9 9
T5
Warm water
9 9 M
Air vent 7
Air vent Pp
Heat exchanger
4
hot water output T3 SV
(secondary)
8
6 18
T4
1 1 P1
3 5 19
9 10 14 9 Ps
17 P2
Circulation Z
15 16 2 Heating 2 Heating
Cold water T2 off T1 on
17
11
12 14 6
9 Heat exchanger
cold water feed
13 (secondary)
Drain Drain
Scope of delivery
8 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
11
9 9
T5
7
M
9
Air vent M Pp
4
T3
WW 9
17 M SV
8
18
HE return
T4
1 P1
3 5 19
9 10 14 9 Ps
17 P2
T1 Heating on
Circulation Z
2
T2 Heating off
15 16
KW 9
17 M HE feed
11
12 14
9
13 Scope of delivery
Drain
Fig 2a: High capacity water heater model EH (with external descale funktion)
steam supply
9
Air vent
Heat exchanger
hot water output T3 SV 8
Warm water 9 17 (secondary)
6 18
ST T4
3
9 10 14 9
17
T1 Heating 22
Circulation on
Z 21
20 M
16 2 Heating
Return
15
Cold water 9 T2 off Condensate
17 6 Ps 5
11
12 14 Heat exchanger
9 cold water
13 feed P2 P1
(secondary) 19
Drain
Scope of delivery
Fig. 2b: High capacity water heater model ED using steam boilers
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 9
ECOTHERM
®
10 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Tank
Storage F S P
B D1 D2 T weight
capacity min. min. min. empty
Liter mm mm mm mm mm mm mm kg
300 500 500 660 1000 600 1460 1860 x 1060 60
540 500 650 810 1000 600 1610 2010 x 1210 80 T F
S
750 500 750 910 1000 600 1710 2110 x 1310 110
1000 500 890 1110 1200 600 1910 2310 x 1510 130
S
1250 500 1000 1220 1200 600 2020 2420 x 1620 197
1500 500 1100 1320 1200 600 2120 2520 x 1720 228
D2
B
2000 500 1250 1470 1400 600 2270 2670 x 1870 335
2500 500 1350 1570 1400 600 2370 2770 x 1970 417
3000 500 1350 1570 1400 600 2370 2770 x 1970 470
4000 500 1500 1720 1600 600 2520 2920 x 2120 681 P
D1 P = Plinth or Platform
S
5000 500 1700 1920 1600 600 2720 3120 x 2320 940
(optional, scope of
Table 1: Clearance distances for the high capacity water heater building)
Fig 3: Space requirements for type
EH high capacity water heater
platform
Table 1a: Space requirement per additional storage tank
(optional, scope of building)
Fig 4: Space requirement per additional tank
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 11
ECOTHERM
®
3.2 Installation (see Fig. 5 and 6) ● Affix the tank unit rating plate (Item 5) 3.4 Cover assembly (see red
below the heat exchanger rating plate arrow)
(r.h. side of controller). ● The heat exchanger block
● Locate and align the tank (Item 1) into
the installation position. cover can be moved in front of
3.3 Heat exchanger assembly the heat exchanger block by
● Connect the heat exchanger block lightly lifting at the front.
ATTENTION: Leave the tank legs (item 2)
(Item 6) to the tank via the flange
freely standing. Do not screw them to the floor,
connections (Item 7). ● The two parts are secured at
otherwise the manufacturer’s warranty will be
invalidated. the top by sheet metal edges and
● Align the adjustable bottom support at the bottom by a
(Item 8) hinge.
● Arrange the insulation shell halves
(200, 300, 540, 750, 850 litres)
● Insert the thermocouples T1 (Item 9), T2
respectively two-part or 3-part
(Item 10) into the appropriate immersion
(starting at 940 litres - see figure
sleeves (Item 12) on the tank and tighten
5) around the tank and secure with
the PG screw fittings.For start-up use
clamping rings at top and bottom
enclosed heat transfer paste.
WARNING:
The heat exchanger must not be insulated!
1 Storage tank
2 Tank legs
5
3 Fibre-fleece insulation
with violett aluminium
chasing 6
4 Clamping rings,
3 9
removeable
5 Rating plate
7 Flange connections
12 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
N9
Connection Size Angle ° Description
N10 N8
N1 below 2000L 1“ ext 90° Drain
135 90
N1 from 2000L 6/4“ ext 90° Drain
N2 2“ ext 270° Cold water inlet
N3 below 2000L DI 200 270° Cleaning flange
N7 N3 from 2000L DI 400 270° Manhole
Water outlet to external
N6 N4 up to 300kW 5/4“ ext 90° heat exchanger
H
N4 above 300 kW 6/4“ ext Water outlet to external
G 90°
M or from 425 kW 2“ ext heat exchanger
Temperature sensors
N5, N6 1/2“ int 90° N6=T1(on), N5=T2(off)
N3
L N5 E N7 6/4“ ext 270° Circulation
Hot water from external
N2 N4 N8 up to 300 kW 5/4“ ext 90° heat exchanger
C N8 above 300kW 6/4“ ext Hot water from external
K N1 90°
J or from 425 kW 2“ ext heat exchanger
A
N9 1“ int on top Air vent
N10 2“ ext 270° Hot water outlet
Fig 6: Connection schema
Table 1b: Secondary circuit connections (Primary circuit
connections: Refer to section 4.10)
Storage A J K C L E G, M H
capacity
Liter mm mm mm mm mm mm mm mm
300 115 280 300 440 1100 940 1670 1850
540 115 280 300 440 1100 940 1670 1940
750 115 280 300 440 1100 940 1670 1980
1000 115 280 300 440 1100 940 1670 1980
1250 115 280 300 440 1100 940 1670 2000
1500 115 280 300 440 1100 940 1670 2010
2000 115 280 300 440 1290 1190 1670 2030
2500 115 280 300 440 1290 1190 1670 2540
3000 115 280 300 440 1290 1190 1670 2580
4000 115 280 300 440 1290 1190 1670 2610
5000 115 280 300 440 1290 1190 1670 2620
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 13
ECOTHERM
®
Installation
Heat Transfer Solutions
4. Connection piping
4.1 General remarks Hot water supply
When connecting, the regulations E-brass isolating fittings*
of the local water supply companies
or, respectively, the applicable
standards should be observed. Stainless steel sensor thermowell
Copper or steel water pipes leading
to the tank should be electrically Magnesium anode
isolated. Only use stainless steel
or brass dummy plugs. Immersion Continuous current anode for
sleeves must be stainless steel only. stainelss steel storage tank
The following DIN regulations have
to be observed during installation: Heating water from boiler
DIN 1988 Part 2: Start-up and
safety of components and Return to boiler
accessories of water heaters.
E-brass isolating fittings*
DIN 4753 Part 1: Cold water feed
components and layout. Heating water from boiler
Tchnical Control Regulation W551: Return to boiler
Avoiding Legionella growth in
drinking water heating and piping
Cold water supply
equipment.
E-brass isolating fittings*
4.2 Cold water connection * Galvanised with copper, steel & piping
The cold water supply should
be fitted with approved safety
4.3 Hot water connection 4.5 Ventilation
devices specified in DIN 4573 part
The hot water connection should be The ventilation connecting piece
1, section 6.3.1. In addition, the
fitted with a shut-off valve provided should be fitted with a shut-off
cold water inlet should be fitted
by the customer. device. It is recommended to
with a backflush filter with 50 - 60
provide continuation pipework to
µm mesh. Connections should be
drain water escaping during the
pressure resistant.
ventilation process.
The operating pressure stated
on the rating plate must not be
4.6 Drainage
exceeded. With higher line pressure
ATTENTION: The drainage connecting piece
a pressure reducer should be fitted,
When closing the shut-off valve to should be fitted with a shut-off
whose function can be checked via
the tank first ensure that the primary device. The continuation pipeline
a downstream test valve.
boiler circuit is turned off, otherwise should be installed with a fall.
The non-return device should
the rise in pressure in the heat
meet the requirements of DVGW
exchanger may cause damage to 4.7 Primry circuit connection to
worksheet W376. Up to 1000
vital parts of the Economizer. boiler
litre tank capacity a pressure
The primary circuit connection
gauge connecting piece should
4.4 Circulation pipeline should be fitted with shut-off valves
be provided, above 1000 litres a
A shut-off device should be fitted at in the delivery and return lines.
permanently fitted pressure gauge
the circulation pipeline inlet to the In addition for model type EH it is
is required.
storage tank. recommended to fit a 150 - 200
When using a circulation pump, this µm mesh filter in the heating water
Warning:
can be controlled via the controller delivery line. Connection to the
It is of utmost importance that the
with a freely programmable timing primary circuit feed and return lines
safety guidlines in section 2.3 on
programme. of the high capacity water heater
page 5 are followed. Failure to do
The circulation pipeline should should be made using a quick
so may cause personal injury.
be fitted with a non-return valve. screw release or flanged union.
To reduce standby losses, the
circulation pipeline should be
provided with appropriate insulation.
14 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Connection
Heat Transfer Solutions
TIP:
At a water hardness over than 15°
Before starting-up the pressure vessels it is absolutly
dH we recommend a water softener
station. necessary to re-tighten the bolts!
(valid for primary 75°C --> 55°C, secondary 12°C --> 60°C)
TF ... Pumpe mit Thermofühler
Table 2: Heat exchanger and pump models for High Capacity Water Heater
4.10 Primary control valve and primary side connection dimensions (Pressure drop 0.1 bar max. when fully open)
Modulating
Modulating 2- Heating connection Heat exchanger Primary control valve
3-way control
control valve and line dimension type / rating kW specification
valve
Honeywell Honeywell 1 1/4“ / DN32 WT50/100-180kW KVS-Value 16
V5011R1075 V5013R1073 max. closing pressure: 7 bar
Honeywell Honeywell KVS-Value 25
1 1/2“ / DN40 WT65/200-350kW
V5011R1083 V5013R1081 max. closing pressure: 4,6 bar
Honeywell Honeywell KVS-Value 40
2“ / DN50 WT80/375-500kW
V5011R1091 V5013R1099 max. closing pressure: 2,6 bar
Table 3: Heat exchanger primary side connection dimensions and control valve specifications
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 15
ECOTHERM
®
Electrical Load
Heat Transfer Solutions
5. Electrical Connection
5.1 General remarks, Safety guidelines, warnings:
● Before opening the housing, make sure that it is disconnected from the mains.
● ÖVE and VDE regulations for electrical connections must be observed.
● Electrical installation must be carried out by qualified specialist personnel.
● A mains power multi-poled circuit breaker must be connected. Rating 16A slow.
● Earthing cable must be properly connected.
● The water cooler must be supplied with uninterrupted electrical power during operation.
● Only replace fuses with original fuses (see below).
● The appliance may only be assembled in a dry room corresponding to fouling degree 2.
● There must be an easily accessible decollator in the supply current circuit!
● Warning: Only connect and switch the mains power supply on, once the cabling of the primary
and secondary pumps (Pp and Ps) and the modulating control valve is complete and has been
checked!
● Danger of faulty wiring:
- Danger of an electric shock
- Damage to or destruction of the control unit or the connected devices
● Inspection of the cabling of the primary and secondary pumps:
Check the passage (the measured resistance must always be less than 10 Ohm):
- Connection N at the output of the control unit ← → connection N at the pump
- Connection L at the output of the control unit ← → connection L at the pump
Check the isolations (the measured resistance must always be greater than 1 Mega ohm!):
- Connection N at the pump ← → both wirings for the thermal contact
- Connection L at the pump ← → both wirings for the thermal contact
16 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Electrical Load
Heat Transfer Solutions
3 4 5 6 7 8
ELC11
F6 Trafo_nach
1,0AT
after
Trafo
B
2 4 6
13 5
X100
State
STATUS
F4 F5
forward
open / close
RV_auf/zu
Trafo_vor
X3 X4 X5 X12 X13
125mAT
2,5AT
2 2
3 3 1 1
2 2 4
1 1 3
1
1
2
X20
X24
2
3
2
3
X14
2
F2 F3 1
D
X15
X21
X25
1
2
3
1
2
1
2
X6 X7 X8 X9 X10 X11
6,3AT
6,3AT
4 4 4 4 4 4
Ps
Pp
3 3 3 3 3 3
2 2 2 2 2 2
2
X16
X26
1
2
3
1
2
1
X22
1 1 1 1 1 1
3
X17
1
X27
2
3
2
X23
2
1X2
F1
1
1
X18
X28
2
3
2
3
4
Rel./Spül
3 E
flush
2
2,5AT
1X1
1
1
X29
2
3
2
X19
PE
18
= F
Austria GmbH ELC11
+
str. 8
rtkirchen Figure 7 Energie-Technik GmbH Prüfschaltschrank Sigmatek Blatt 17
Ers. f. Ers. d. A - 4 0 70 Efer ding 09_10_024 von 19 Bl.
3 4 5 6 7 8
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 17
ECOTHERM
®
Electrical Load
1 2 3 4 5 6 7 Heat Transfer
8 Solutions
-1A1 PINSteckerbelegung
ALLOCATION 230V AC AC
230V Figure 8
A Brenner Störung A
Burner Failure
Net
Netz 230V Pp Ps Valve
Ventil Exscale
Spülung1 1 Exscale
Spülung2 2 Exscale
Spülung3 3 Exscale
Spülung4 4 Reserve 1 Reserve 2 Pot.-frei
Pot.-free Pot.-frei
Pot.-free
X1-230VAC X2 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 X13
L_R05_NC
L_R05_NO
L_R06_NC
L_R06_NO
L_R07_NC
L_R07_NO
L_R08_NC
L_R09_NO
L_R09_NC
L_R09_NO
L_R10_NC
L_R10_NO
L_R11_NO
L_R12_NO
L_R11_C
L_R12_C
L_R01
L_R02
L_R03
L_R04
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
L
N
L
N
N
B B
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
1
2
-W1 -W3 -W4 -W5 -W6 -W7 -W8 -W9 -W10 -W11 -W12 -W13
bl
gg
bl
gg
bl
gg
gg
1
2
3
1
2
3
1
2
3
1
2
1
2
1
2
1
2
1
2
1
2
sw
sw
sw
gg
gg
PE gg
PE gg
gg
gg
N
1
2
3
5
1
N
1
N
PE
PE
3
2
1
3
2
1
C C
Performance at
Ausführung bei
400 V pump
400V-Pumpe
INTERN
INTERNAL
D D
EXTERN
EXTERNAL
PE
-Pp
L
N
400V
L1
L2
L3
A1 246
K1
A2 135
M3~
230V
TK
E E
L1
L2
L3
PE
T1
T2
PE
PE
PE
L1
L2
L3
PE
L`
L`
L
N
L
N
L
N
-Pp -Ps
N
1
2
3
5
L
PE
PE
3
2
1
3
2
1
-BA -SM
PE
PE
1
N
1
N
Net 230V Net 400V
1
2
3
A
B
L
L
N
50Hz
50Hz 50Hz
50Hz Brenner-
demands
3-Pkt.
2
1
2
1
anforderung Störmeldung
ML6420A SR230A SR230A
TK TK 230V -2SA -2SA LF230 LF230
Regelventil
Control valve -Ext.Sp.V1 -Ext.Sp.V1 -Ext.Sp.KWe -Ext.Sp.KWa
T1
T2
T1
T2
-RV
-RV
1 2 3 4 5 6 7 8
Figure 9
17 19
-1A1 PIN ALLOCATION
Steckerbelegung LOW VOLTAGE
Kleinspannung
A Valve
Ventil Valve
Ventil Legion. Remote
Fernst. TK Pp TK Ps Diff.Diff.-
Pressure T1 T2 T3 T4 T5 T6 T7 CAN-Bus CAN-Bus Progr. A
unten
below oben
above control Drucksens.
sensor IN OUT
X14 X15 X16 X17 X18 X19 X20 X21 X22 X23 X24 X25 X26 X27 X28 X29 X100
+24V2
+24V2
+24V2
+24V2
+24V2
+24V2
+24V2
+24V1
CAN_A
CAN_B
CAN_A
CAN_B
AGND
AGND
AGND
AGND
AGND
AGND
AGND
DI1
GND
DI2
GND
DI3
GND
DI4
GND
DI5
GND
DI6
GND
AI1
GND
AI2
AI3
AI4
AI5
AI6
AI7
AI8
GND
B B
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
3
4
1
2
1
2
3
4
5
6
INTERN
INTERNAL
EXTERNAL
EXTERN
-W14 -W15 -W16 -W17 Bügel wenn Pumpe -W20 -W21 -W22 -W23 -W24 -W25 -W26 -W27 -W28
ohne TK
1
2
1
2
1 1
2 2
1 1
2 2
1
2
3
1
2
1
2
1
2
1
2
1
2
1
2
1
2
ro
ge
ws
sw
-W18 -W19
1
2
1
2
+ bn
Y gn
- ye
PT1000
PT1000
PT1000
PT1000
PT1000
.
C C
-T19.9
-Legion. -Fernst.
Remote
control
-T1
-T2
-T3
-T4
-P-Diff.
.
-X1 Boiler
Speicher Boiler Charging Heating-VL
Ladetemp. Heating-RL
Heizung-RL
10
12
oben
above below temp. Option
Option
1
3
4
6
7
9
Speicher Heizung-VL
unten
X1
X2
X3
2
1
1
2
3
4
5
6
-1A1
1
2
3
4
5
6
7
8
9
10
11
12
GND
+5V
CAN
Plug on backside
Stecker auf Rückseite ETV0501
S1
S2
S3
S4
S5
S6
S1
S2
S3
S4
S5
S6
T1
T2
T1
T2
TK TK
ZU
Closed AUF
Open ZU
Closed AUF
Open M~ M~
-Ext.Sp.V1 -Ext.Sp.V2 2 1 5 3 1
E (SR230A)-2SA (SR230A)-2SA 6 4 2 E
-Pp -Ps
-X4 -X5
See: Pin allocation 230V AC
siehe: S teckerbelegung 230V AC
18
F Datum = F
18 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC +11
ECOTHERM Austria GmbH
ECOTHERM ®
Electrical Load
Heat Transfer Solutions
X2 - 230 V AC earthing
3-poled connector Phönix RM5,08
Pin Signal Function Cable YSLY-JB 3x1,5
1 L Phase Black
2 N Neutral wire Blue
3 PE Earth wire Yellow-green
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 19
ECOTHERM
®
Electrical Load
Heat Transfer Solutions
20 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Electrical Load
Heat Transfer Solutions
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 21
ECOTHERM
®
Electrical Load
Heat Transfer Solutions
22 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Electrical Load
Heat Transfer Solutions
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 23
ECOTHERM
®
6.1 Flushing the pland ● On the tank, open the shut-off 6.3 Filling and venting the
valves for ventilation, hot water primary circuit
Prior to initial start-up the entire discharge, circulation pipeline in (Refer to picture 1 in section 2.4)
system should be thoroughly connection to the tube bundle heat
exchanger.
flushed. Foreign particles in ● Slowly fill the primary circuit with
the system adversely affect the water and vent it.
● Close the drain valve, open the
system‘s operational readiness and
cold water shut-off valve and ● Open the shut-off valves in the
safety.
slowly fill the tank. primary circuit feed and return line
to the heat exchanger.
6.2 Filling the storage tank and
● If only water escapes, close Steam boiler circuit:
secondary circuit To avoid initial steam flashbacks, do
the ventilation valve and the hot
(Refer to diagram in section 2.4) not fully open the flow valve at
water tapping valves.
first.
● Set the safety valve trigger pressure
● Vent the hot water pump by
(note manufacturer’s instructions). ● Open the control valve in the
The safety valve should respond at manual rotation by a few turns.
primary circuit only.
the latest on reaching the
permissible operating pressure. ● Open the hot water discharge ● Vent the heating water pump
shut-off valve and close the hot (Economizer model type EH only)
● Set the pressure reducing valve water tapping valves. by manual rotation by a few turns.
to approx. 8 times of the safety
valve trigger pressure (not ● Vent the safety valve until only ● Check that the primary circuit piping
manufacturer’s instructions). water escapes. is free of leakages.
24 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
In general the grey buttons are buttons with information. The violett ones are deposited with functions!
Scroll to left
Scroll to right
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 25
ECOTHERM
®
Control Unit
Heat Transfer Solutions
Picture: Touchscreen input unit ELC 11 of the high capacity water heater
Figure 10
Pollution control: 7.3.5 page 35
Trend, design: 7.3.4 page 34
Event, Journal: 7.3.3 page 34
Service pages: 7.3.1 pages 26 - 28
Parameter, input: 7.3.2 pages 28 - 33
Alarms: 7.3.6 pages 35 - 36
Figure 11
In order to enable a long life of the Touch-Screen, it is forbidden to use it with sharp objects!
26 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Control Unit
Heat Transfer Solutions
Figure 13
Safety level 0
At the service menue date and time can be chosen:
Date and time are shown and changed via input windows,
which appear at touching the relative violett buttons.
Quit after sucessful input with the confirmation button
(Enter button).
The „Screensavertime“ (time interval of the screensaver)
can also be setted up here.
Figure 14
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 27
ECOTHERM
®
Control Unit
Heat Transfer Solutions
Figure 15 Figure 16
All the adjusted figures can be resetted to the factory settings here.
If the touchscreen looses its fidelity you still have the op-
portunity of the calibration. Therefore please choose the
violett buttom „touch calibration“ and follow the instructions
of the monitor.
Figure 17
In order to guarantee an ideal service of the terminal, the touch-screen should be cleaned from soilings regularly.
Therefore please use the button „Cleaning of the monitor“ at which the monitor is disabled for one minute. The touch-
screen is only allowed to be cleaned with a moisty and soft blanket. For moistening the blanket please use a monitor
detergent, such as an antistatic foam cleaner, water with dish detergent or alcohol. At first please give some detergent
at the blanket and not directly on the terminal. It should be avoided that detergents can reach the electronic via vent
slots at the casing of the terminal.
It is forbidden to use caustic detergents, chemicals, abrasives as well as tough objects which could scratch or damage
the touch-screen.
28 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Control Unit
Heat Transfer Solutions
Figure 18
7.3.1.9 Network settings
Figure 20
Figure 21
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 29
ECOTHERM
®
Control Unit
Heat Transfer Solutions
Figure 22
Figure 24
30 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Control Unit
Heat Transfer Solutions
Adjusting of the follow-up time, for supporting the The temperature of the legionella circuit. For avoiding a
cooling of the boiler. growth of legionella in the tank the legionella circuit can
Clamps 1 and 2 of K1 have to be connected be started via a switch contact inputs X16 extern from the
absolutely with a wire jumper or linked at a boiler regulation or from a timer. At closing the inputs X16
telecontrol. the complete boiler will be heated up to 65° C.
(see schematic diagram at chapter 5.3) Warning: In order to avoid the increased danger of
scalding it is recommended to install a cold water mixing
plant.
Additionally to the external activation there is also the possibility to enable the legionella circuit via an integrated time
switch.
7.3.2.5.6 Legionella parameter
(Safety level 1)
At the page „Legionella parameter“ the legionella cover can
be adjusted respectively controlled (internal time switch).
Legionella co-
ver: The legio-
nella cover can
be acti va te d/
deactived here
Figure 25
Time: Adjust-
ment at which
time the legio-
nella cover gets
active
Figure 26
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 31
ECOTHERM
®
Control Unit
Heat Transfer Solutions
Figure 28
Figure 29
32 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Control Unit
Heat Transfer Solutions
Figure 30
Figure 31
7.3.2.5.12 Settings of control unit
P-, I-, and D-amount (Safety level 1)
At enlarging and reducing of the valve running time the actuator uses a bigger or smaller value and produces another
control mode for his calculations.
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 33
ECOTHERM
®
Control Unit
Heat Transfer Solutions
Serviceparameter page 4
7.3.2.5.13 Slide operation (Safety level 1)
Figure 32
Serviceparameter page 5
7.3.2.5.14 Boiler return flow (Safety level 1)
Limitation
Figure 34
34 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Control Unit
Heat Transfer Solutions
Figure 35
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 35
ECOTHERM
®
(Safety level 0)
The pollution control points on the average value of the commissioning, which is calculated after the first 10 loading
hours. The limit value is determined afterwards. If this value is exceeded the pollution warning is read out. After 10
further loading hours the plant turnes on interfence. If the interfence is quitted the plant runs for further 60 hours.
Afterwards only service engineers can remedy this disturbance.
Pressure differene
Pressure difference alarm value calibration
Pressure difference current value Make out a new pressure
difference average value
Figure 38
7.3.6 Alarms
(Safety level 0)
Failure messages and troubleshooting
Delete alarm
Quit alarm
36 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Control Unit
Heat Transfer Solutions
A 013 Run-time error flush valve Open! Supervision of the final switch of the Controll of the connectioon
A 014 Run-time error flush valve flush valves V1 and V2 of the external of the final switches of the
Closed! excale flush valves
A 015 Flow controll error! At non-operating state the differental Controll of the differential
pressure has to be between -50 and pressure indicator
-100 (Normal case -10 to 10)
A 016 STB tripped Only at steam! Controll of the safety
temperature sensor
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 37
ECOTHERM
®
8.1 General
Figure 38
Picture: Touchscreen input unit ELC 11 of the high capacity water heater
Figure 39
38 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Here you can set the sensor values, which sensor (T1 /
T2 / T11 / T12) starts and stops the heat pump at which
temperature.
Furthermore, the flow set point of the 3-way valve is con-
trolled via the sensor T13.
Bild 40
Bild 41
Bild 42
8.2.4 Sensor adjustment (Safety level 3)
Bild 43
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 39
ECOTHERM
®
Tank Charging
Heat Transfer Solutions
9. Operating modes
In order to switch the system into CHARGING state: STAND-BY state:
standby it has to be setted on Display: "Charging" Same as at normal operating
automatic. (see chapter 7) The outputs are set to: condition, however with the
Primary pump* = ON following changes:
9.1 NORMAL load operating mode Secondary pump = ON If the temperature at T1 and
Requirement: NORMAL has to be Burner demand = ON T2 deceeds the setted shall
setted at the sevice menue (7.3.2.2) (Boiler prior circuit) temperature at each 2° K and if
Control valve = OPEN, ---, the remote control input is closed,
STANDBY state: CLOSED (3-points) the charging process is started,
Display: Mode NORMAL STANDBY which means the system is switched
The outputs are set to: The industrial water pump runs into the operating connection
Primary pump* = OFF and the control valve regulates "HEATING". If the remote control
Secondary pump = OFF the loading temperature at T3 input is opened while heating or
Burner demand = OFF at the following value: Hot water charging process, the system turnes
(Boiler prior circuit) shall temperature + 2° C. If the immediately into the state "Flushing"
Control valve = CLOSED temperature at T1 and T2 reaches or "STAND-BY".
If the temperature at T1 and T2 the setted to-be value, the charging
falls below the setted shall value ends and the system is shut into the 9.3. PEAK load operating mode
with respective 2° C, the charging operating condition "Cooling". Requirement: "GREAT" is setted
process is started; which means at the parameter input. More
the system goes into the operating Cooling state: information see 7.3.2.2
condition "HEATING". (Residual heat)
Display: Cooling STAND-BY state:
HEATING state: The outputs are set to: Same as at normal operating
Display: HEATING Primary pump* = ON condition, however with the
The outputs are set to: Secondary pump = ON following changes:
Primary pump* = ON Burner demand = OFF T1 is not in operating mode. If
Secondary pump = OFF (Boiler prior circuit) the Temperature at T2 deceeds
Burner demand = ON Control valve = OPEN the setted shall value at 2° C, the
(Boiler prior circuit) It is only active if a follow-up time charging process is started, which
Control valve = OPEN is entered. The primary pump and means the system is switched into
the secondary pump are running the state "HEATING".
The hot water pump (only modell and the valve is opened in order to
type EH) runs and the control cool down the primary circuit and CHARGING state:
valve opens. If the temperature at the boiler. After expiration of the Same as at normal operating
T4 exceeds the setted shall value setted follow-up time the system is condition, however with the
(primary circuit flow temperature switched again into the operating following changes:
of the boiler), the actual charging condition "STAND-BY". The burner If the temperature at T1 and T2
starts and the operating condition prior circuit (boiler prior circuit) has reaches the setted shall value, the
switches into "charging". to be absolutely connected! charging process ends and the
system is switched into the state
9.2 Loading process at normal "Cooling"
operation with remote control
Remote control inputs X17 + 24V *) Hot water pump is only available
(instead of wire strap - connection at the models EH, not et ED
scheme chapter 5.3) are connected steam.
with external release, for instance
with a time switch, a guidance Peak load operating condition
system or a safety thermostat. and return flow limitation
respectively peak load operating
condition and sliding operating
are not possible at the same time.
40 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Tank Charging
Heat Transfer Solutions
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 41
ECOTHERM
®
External cold water exscaling
Heat Transfer Solutions
Figure 44
● Strong rinsing of the heat exchanger with cold water in order to remove the residual heat of it in shortest time.
● Complete integration and supervision of the flushing times and temperatures in the microprocessed
flushingprogramm of the ELC11-controll of the ECOTHERM High Capacity Water Heaters.
● An optional activation or deactivation of the external flushing. At deactivated external flushing, the usual internal
flushing comes into force if requested.
● Minimum flushing duration 0 seconds, maximum 99 seconds - free programmable in the standard exscaling
programm of the ELC11-control of the ECOTHERM High Capacity Water Heaters.
● Delayed and supervised closing and opening of the 4 external flushing valves in order to guarantee the optimal
effectiveness of the ECOTHERM High Capacity Water Heaters certainly and reliably.
● Continuous detection of the engine valves and automised alarm release with errorlamp at the factory master
control system in order to avoid eventually hot water misallocations at an improbable failure of one of the
components.
Functional routine:
As soon as „Flushing“ is shown on the Display of the ELC-control, both engine valves between boiler and heat
exchanger are closed. If both valves are closed then the engine valve of the cold water intake opens first and after-
wards time-delayed the engine valve of the cold water outtake. The duration of how long the cold water valves stay
open respectively the requested temperature in the heat exchanger, can be setted up in via the ELC11-control. After
expiration or the duration (standard 10 sec.) the cold water output closes first and afterwards the cold water input. After
a standstil of 3 minutes the process will be repeated until the requested temperature in the heat exchanger is reached.
At „SYSTEM OFF“: (Control unit input X13 is open, control unit inpout X14 is closed) No flushing of the system even if
the heat exchanger is still warm.
At „HEATING“: Open both engine valves between boiler and heat exchanger, at about 20 % opens the input X14 and
closes consequently the flushing valves, at about 80 % X13 will be closed. Herewith the pumps and the control unit are
released and the system turns into the operating condition „HEATING“.
At „STANDBY“: After the end of charging the pumps stop and the control unit and the boiler valves get closed.
42 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Mounting of the actuator with function of limit switch (valve between boiler and heat exchanger):
Attention: please take note of the position of the actuator and valve, otherwise the function of the system is interrupted.
Figure 45 Figure 46
Actuator at 0
Figure 47
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 43
ECOTHERM
®
External cold water exscaling
Heat Transfer Solutions
Valve open
Limit switch left (S1,S2,S3) at 7.00 and right
(S4,S5,S6) at 5.00 o‘clock
Figure 48 Figure 49
Actuator at 1
0 1
Figure 50
44 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Figure 51
11. Start-up
11.1 Checks 11.2 Start-up
Open the boiler shut-off valves at Turn on the power supply at the Check water pipes on tightness
the cold water inlet, cold water supply, main switch
circulation and connection to the tube Check the regulating devices and
bundle heat exchanger Turn the system modus on the inlet valves on their functions
automatic
Check if the system is correctly
filled and vented heating-water-sided The control valve will open now
and warm-water-sided. and the system goes in HEATING
mode. Take care on air noises and
Control boiler pressure repeate the venting in case
Check function of the safety valve Start up the heating plant and
via crack opening. in case, check if the heating plant
switches into hot water primacy
Ckeck sensors and proximity
switch connections Please regard on air noises at
starting of the primary pump
Check electric connections
If necessary, please set up the
function parameter according to the
operating requests
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 45
ECOTHERM
®
4
2 3
12.1 Cleaning and servicing of tank 12.2 Cleaning and servicing the tube
vessel (Fig. 49) heat exchanger (Fig. 48a + 48b)
46 Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11
ECOTHERM ®
Operating Instructions High Capacity Water Heaters Models EHRE/EHPE & EDRE - ELC 11 47
ECOTHERM
®
FS
Heizungsringleitung - Rücklauf
Heizungsringleitung - Vorlauf
HW Vorl. HW Rückl.
Type EHRE Hot Water 11
9 9
T5
7
9 M
Entlüftung Pp
4
WT Rückl. T3 SV
WW 9
17
8
MS
6 18
T4
1 P1
3 5 19
9 10 14 9
17
Ps WW........... Hot water connection
P2
T1 Ein KW............ Cold water connection according to
Zirkulation Z DIN 1988 part 2 and
DIN 4753 part 1
2 Z............... circulation
Aus
T2 WTVorl...... Cold water inlet to boiler
6
15 16 WTRück... Hot water supply to boiler
KW 9
17
WT Vorl. HWVorl..... Inlet from boiler
11 HWRückl.. Supply to boiler
12 14
9
13 Lieferumfang
Entleerung
ECOTHERM
ECOTHERM_e