Structure and Equipment Day 1

Siemens AG, EM DG PTI NC

Transmission Network Planning


Structure and Equipment

© Siemens AG 2016 siemens.com

§ Structure and equipment


§ Introduction
§ Electrical network equipment
§ Electric power plant
§ Electric generator
§ Power transformer
§ Electrical lines and cables
§ Electrical Loads
§ Electrical switch
§ Switchgear
§ Substations

© Siemens AG 2016
Seite 2 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 1


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Introduction
Definition

An electrical grid is an interconnected network for delivering electricity from


suppliers to consumers. It consists of generating stations that produce electrical
power, high-voltage transmission lines that carry power from distant sources to
demand centers, and distribution lines that connect individual customers.

Power stations may be located near a fuel source, at a dam site, or to take
advantage of renewable energy sources, and are often located away from
heavily populated areas.

The bulk power transmission network will move the power long distances,
sometimes across international boundaries, until it reaches its wholesale
customer (usually the company that owns the local electric power distribution
network).

© Siemens AG 2016
Seite 3 2016 Atallah / EM DG PTI NC TRS

Introduction
Main parameters

§ Total generation
§ Total load
§ Nominal voltage
§ Nominal frequency

© Siemens AG 2016
Seite 4 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 2


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Introduction
Network schematic representation

Power Transformer Switching Transmission line Load


plant station

Three-phase System

Single line
diagram

Equivalent circuit in
symmetrical components

© Siemens AG 2016
Seite 5 2016 Atallah / EM DG PTI NC TRS

Introduction
Network geographic representation

© Siemens AG 2016
Seite 6 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 3


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Introduction
Voltage levels

Extra high voltage


700 kV
Transmission 380 kV
220 kV
High voltage
150 kV
110 kV
60 kV
Medium voltage
30 kV
20 kV
10 kV
Low voltage 6 kV
600 V Distribution
400 V

© Siemens AG 2016
Seite 7 2016 Atallah / EM DG PTI NC TRS

Electric network equipment


Overview

Power plant
Generator

Petersen coil Three winding


Bus coupler
transformer

Double
bus bar
Current limiting
Breaker Cable
reactor

Shunt reactor
Ring main
M
unit Motor Overhead
line

Load
Filter

© Siemens AG 2016
Seite 8 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 4


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electric power plant


Overview

Power plant
Generator

Petersen coil Three winding


Bus coupler
transformer

Double
bus bar
Current limiting
Breaker Cable
reactor

Shunt reactor
Ring main
M
unit Motor Overhead
line

Load
Filter

© Siemens AG 2016
Seite 9 2016 Atallah / EM DG PTI NC TRS

Electric power plant


Parameters

Type typical size Efficiency Full load hours

MW % h/a
47%
Hard coal up to 800 MW 6000
(CCP 58 %)
Lignite up to 900 MW 43 7500
Nuclear 900 -1600 MW 35 7500
40%
Gasturbine 340 MW 1400-3000
(CCP 60 %)
few kW
River hydro up to 300 MW 85 5000-8760
(Germany)
1000 MW (Germany)
Pumped storage 90 % / 80% 750-5000
bis 18 GW (world)
1800 onshore
Wind 0,5...7,5 MW 45-50%
3400 offshore
Solar 0....12 MW 14-17% 850-1000

© Siemens AG 2016
Seite 10 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 5


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electric power plant


Steam power plant

© Siemens AG 2016
Seite 11 2016 Atallah / EM DG PTI NC TRS

Electric power plant


Gas (Combustion) power plant

© Siemens AG 2016
Seite 12 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 6


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electric power plant


Combined cycle power plant (single shaft)

© Siemens AG 2016
Seite 13 2016 Atallah / EM DG PTI NC TRS

Electric power plant


Hydro power plant

© Siemens AG 2016
Seite 14 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 7


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electric power plant


Renewable resources

Wind Photovoltaic
recent success story static generation
after many generations remote islands
of hydro power possible

Geothermal Solar thermal


almost unlimited still room for
but still under development
technology link to storage
development

Tidal currents
predictable generation

© Siemens AG 2016
Seite 15 2016 Atallah / EM DG PTI NC TRS

Electric generator
Overview

Power plant
Generator

Petersen coil Three winding


Bus coupler
transformer

Double
bus bar
Current limiting
Breaker Cable
reactor

Shunt reactor
Ring main
M
unit Motor Overhead
line

Load
Filter

© Siemens AG 2016
Seite 16 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 8


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electric generator
Parameters

Power kW up to MW

Voltage

Revolutions

Excitation

Cooling

Weight

© Siemens AG 2016
Seite 17 2016 Atallah / EM DG PTI NC TRS

Electric generator
General types

Horizontal shaft type for steam turbine

Vertical shaft type for water turbine

© Siemens AG 2016
Seite 18 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 9


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electric generator
Operation principle

When the poles on the rotor, driven by prime mover, move past the stator
conductors, due to the relative motion of conductors with respect to the poles,
the magnetic flux lines are cut by the conductors and voltage is induced in
them.

© Siemens AG 2016
Seite 19 2016 Atallah / EM DG PTI NC TRS

Electric generator
Capability curve

inductive capacitive

© Siemens AG 2016
Seite 20 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 10


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Power transformer
Overview

Power plant
Generator

Petersen coil Three winding


Bus coupler
transformer

Double
bus bar
Current limiting
Breaker Cable
reactor

Shunt reactor
Ring main
M
unit Motor Overhead
line

Load
Filter

© Siemens AG 2016
Seite 21 2016 Atallah / EM DG PTI NC TRS

Power transformer
Parameters

Power kW up to MW

Voltage

Impedance

Vector group

Core type

Cooling

Weight

© Siemens AG 2016
Seite 22 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 11


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Power transformer
Operation principle

© Siemens AG 2016
Seite 23 2016 Atallah / EM DG PTI NC TRS

Power transformer
Core type

Shell type has lower


leakage flux and losses and
more mechanical protection
for the windings.

Core type is easier to build


and maintain

© Siemens AG 2016
Seite 24 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 12


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Power transformer
Inter-tie transformer core

© Siemens AG 2016
Seite 25 2016 Atallah / EM DG PTI NC TRS

Power transformer
Winding for high power and votlage

© Siemens AG 2016
Seite 26 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 13


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Power transformer
Vector group

Main configurations:
§ Y-Y
§ Y-D
§ D- D
§ D-Y

Parallel operations:
All the transformers should have same vector group & polarity of the winding.

Earth fault Relay:


A Dd transformer does not have neutral. to restrict the earth faults in such systems, a zig
zag wound transformer to create a neutral along with the earth fault relay should be used

Removing harmonics:
The delta winding allows third-harmonic currents to circulate within the transformer, and
prevents third-harmonic currents from flowing in the supply line.

© Siemens AG 2016
Seite 27 2016 Atallah / EM DG PTI NC TRS

Power transformer
Cooling type

ONAN ONAF OFAF


Oil natural / Air natural Oil natural / Air forced Oil forced / Air forced

© Siemens AG 2016
Seite 28 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 14


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Power transformer
Tap changer

A tap changer will influence the transformation ratio of a


transformer.

It could be installed either on the primary or secondary


side. Installation on primary side is more economic due
to lower currents.

A tap changer could be:


§ On-load tap changer OLTC (automatic or manual)
§ No-load tap changer

The main parameters are:


§ Number of steps (range)
§ Voltage magnitude change per step
§ Voltage angle changer per step (phase shift)

© Siemens AG 2016
Seite 29 2016 Atallah / EM DG PTI NC TRS

Power transformer
General types by application

© Siemens AG 2016
Seite 30 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 15


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Power transformer
Schematic representation

© Siemens AG 2016
Seite 31 2016 Atallah / EM DG PTI NC TRS

Power transformer
850 MVA Generator transformer, 410 ± 14,6% / 27 kV

© Siemens AG 2016
Seite 32 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 16


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Power transformer
630-kVA Oil-immersed distribution transformers

© Siemens AG 2016
Seite 33 2016 Atallah / EM DG PTI NC TRS

Power transformer
630-kVA Cast-resin transformer 20/0,4 kV

© Siemens AG 2016
Seite 34 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 17


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electrical lines and cables


Overview

Power plant
Generator

Petersen coil Three winding


Bus coupler
transformer

Double
bus bar
Current limiting
Breaker Cable
reactor

Shunt reactor
Ring main
M
unit Motor Overhead
line

Load
Filter

© Siemens AG 2016
Seite 35 2016 Atallah / EM DG PTI NC TRS

Electrical lines and cables


Parameters

Cable
Voltage
Rated power
Installation
Insulation

Overhead line
Voltage
Rated power
Tower

© Siemens AG 2016
Seite 36 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 18


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electrical lines and cables


Overhead line – Components

AAC all-aluminium conductor


COHL Copper Overhead line
AAAC all aluminium alloy conductor
ACSR aluminium conductor steel reinforced

© Siemens AG 2016
Seite 37 2016 Atallah / EM DG PTI NC TRS

Electrical lines and cables


Overhead line – Tower configurations

20kV 2x110kV 2x110kV 2x220kV/2x380kV 735kV

© Siemens AG 2016
Seite 38 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 19


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electrical lines and cables


Overhead line – Insulators

Light 16 mm/kV
Medium 20 mm/kV
Heavy 25 mm/kV
Very heavy 31 mm/kV

IEC 60815 creepage distance to environment

© Siemens AG 2016
Seite 39 2016 Atallah / EM DG PTI NC TRS

Electrical lines and cables


Cable – Laying conditions

Current rating for 110 kV underground cable

© Siemens AG 2016
Seite 40 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 20


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electrical lines and cables


Cable – Laying conditions

© Siemens AG 2016
Seite 41 2016 Atallah / EM DG PTI NC TRS

Electrical lines and cables


Cable – Material

© Siemens AG 2016
Seite 42 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 21


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electrical lines and cables


Gas Insulated Lines GIL

§ High transmission rating up to


4000 MVA, 550 kV
§ Short-circuit rating up to 63 kA
§ Low transmission losses
§ Long transmission distances
§ Environmental friendly through
tunnel or earth laying

© Siemens AG 2016
Seite 43 2016 Atallah / EM DG PTI NC TRS

Electrical lines and cables


GIL – Example (Switzerland)

1. Opening for erection 5. Steel structure (sliding


2. GIL straight construction unit with support)
bending radius R>400m 6. Steel structure (fixed support)
3. Expansion joint 7. Angle construction unit
4. Disconnection unit with gas-tight
insulator and ALC (arc location
converter)

© Siemens AG 2016
Seite 44 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 22


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electrical lines and cables


Cost relation for cables/GIL and overhead lines

Ratio for cable cost KK and


overhead line KF for
procurement and installation
for same transmission rating
Scatter area
excluding compensation
equipment

© Siemens AG 2016
Seite 45 2016 Atallah / EM DG PTI NC TRS

Electrical lines and cables


Limits for power transmission

Overhead line Cable and GIL

GW GW

8 4
1000 kV AC GIL
6 300 kV DC
3
800 kV DC
GIL 500 kV AC
4 750 kV AC 2
550 kV DC DC Cable 500 kV
2 1
Cable 380 kV AC
380 kV AC
km km
1000 2000 100 200 500 1000

© Siemens AG 2016
Seite 46 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 23


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electrical loads
Overview

Power plant
Generator

Petersen coil Three winding


Bus coupler
transformer

Double
bus bar
Current limiting
Breaker Cable
reactor

Shunt reactor
Ring main
M
unit Motor Overhead
line

Load
Filter

© Siemens AG 2016
Seite 47 2016 Atallah / EM DG PTI NC TRS

Electrical loads
Parameters

Apparent power
Active power
Reactive power
Usage
Harmonics

Heating
Light
Motor
Power electronics

© Siemens AG 2016
Seite 48 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 24


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electrical loads
Types

§ Resistive
§ Capacitive
§ Inductive
§ Linear
§ Non-linear
§ Static
§ Dynamic
§ Continuous
§ Intermittent

© Siemens AG 2016
Seite 49 2016 Atallah / EM DG PTI NC TRS

Electrical loads
Types

Quadratic Constant Proportional

Constant impedance Constant power Constant current

U voltage at node in %
fS power consumed in %

© Siemens AG 2016
Seite 50 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 25


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electrical switch
Overview

Power plant
Generator

Petersen coil Three winding


Bus coupler
transformer

Double
bus bar
Current limiting
Breaker Cable
reactor

Shunt reactor
Ring main
M
unit Motor Overhead
line

Load
Filter

© Siemens AG 2016
Seite 51 2016 Atallah / EM DG PTI NC TRS

Electrical switch
Parameters

Voltage
Nominal current
Short-circuit current
Switching principle

Circuit breaker
Load break switch
Isolator switch
Earth switch

© Siemens AG 2016
Seite 52 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 26


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electrical switch
Switching devices

• Circuit breaker
ð can interrupt short-circuit currents
I''
ex. k = 70 kA at Un = 380 kV
ð Very expensive
• Load break switch
ð Can make and break load current
ð Can not interrupt short-circuit current
ð Expensive
ð In low votlage networks used with fuses
• Isolator swtich
ð Operated only when a current is not present
ð Can not make or break load currents
ð Can not interrupt short-circuit currents Symbol
ð Relative price

© Siemens AG 2016
Seite 53 2016 Atallah / EM DG PTI NC TRS

Electrical switch
Circuit breaker – Live tank

Rated short-circuit
current [kA]

80

3AT2/3 3AT4/5
63

50

40

31,5

25

3AP1 FG 3AP1 FI 3AP2/3 FI 3AP4/5 FI


0
72,5 123 145 170 245 300 362 420 550 800 Rated voltage
[kV]

© Siemens AG 2016
Seite 54 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 27


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electrical switch
Circuit breaker – Arc slef compression quenching

The current conducting path of the interrupter unit consists of the contact carrier (1), the base (6) and the moveable
contact cylinder (5). In the closed position, the current flows via the main contact (4) and the contact cylinder (5).

During the opening operation, the main contact (4) opens first, and the current commutates to the still closed arcing
contact. During the further course of opening, the arcing contact (3) opens up and an arc is drawn between the
contacts.

At the same time, the contact cylinder (5) moves into the base (6) and compresses the SF6 gas located there. This
gas compression creates a gas flow through the contact cylinder (5) and the nozzle (2) to the arcing contact,
extinguishing the arc.
© Siemens AG 2016
Seite 55 2016 Atallah / EM DG PTI NC TRS

Electrical switch
Circuit breaker – Dead tank
63
Rated short-circuit current [kA]

50

40

31,5

20
SPS-2 SPS-2 SPS-2 3AT2/3-DT

38 48,3 72,5 121 145 169 242 362 420 500

Rated voltage [kV]

© Siemens AG 2016
Seite 56 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 28


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Electrical switch
Isolating switch

Isolarting seitch, 72,5 kV up to 420 kV

Rotating isolating switch with arresters


© Siemens AG 2016
Seite 57 2016 Atallah / EM DG PTI NC TRS

Switchgear
Overview

Power plant
Generator

Petersen coil Three winding


Bus coupler
transformer

Double
bus bar
Current limiting
Breaker Cable
reactor

Shunt reactor
Ring main
M
unit Motor Overhead
line

Load
Filter

© Siemens AG 2016
Seite 58 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 29


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Switchgear
Parameters

Configuration

Insulation material

Busbars

Coupler

© Siemens AG 2016
Seite 59 2016 Atallah / EM DG PTI NC TRS

Switchgear
Experience with gas insulated switchgear 40 Jahre

1960 Start of research and development for SF6 technology

1964 Delivery of first SF6 circuit breaker

1968 Delivery of first GIS

1974 Delivery of first GIL (420 kV)

1997 Introduction of control and monitoring techniques

1999 Market lead in current GIS generation:


Worlwide smallest switchgear for 145 und 245 kV

2000 Introduction of new HIS-switchgear concept:


GIS switchgear in outdoor installation

© Siemens AG 2016
Seite 60 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 30


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Switchgear
GIS – 245 kV Cable field

© Siemens AG 2016
Seite 61 2016 Atallah / EM DG PTI NC TRS

Switchgear
GIS – Advantages

§ Lower space requirements

§ Lower weight

§ Tailor made solution through modular design

§ Environmently friendly

§ Sohrt delviery and assembly time

§ High economic advantage due to lower maintenance need

§ High security for operating personnel

§ High availability and service life

© Siemens AG 2016
Seite 62 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 31


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Switchgear
GIS – Products

Short-circuit current [kA]

63 8DN9 8DQ1 8DR1

50

40 8DN8

31,5

25

72,5 123 145 170 245 300 362 420 550 800
Voltage [kV]

© Siemens AG 2016
Seite 63 2016 Atallah / EM DG PTI NC TRS

Switchgear
GIS – Datasheet

© Siemens AG 2016
Seite 64 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 32


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Switchgear
Schematic configurations

© Siemens AG 2016
Seite 65 2016 Atallah / EM DG PTI NC TRS

Switchgear
HIS-installation in H-Configuration

© Siemens AG 2016
Seite 66 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 33


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Switchgear
HIS-installation in H-Configuration

© Siemens AG 2016
Seite 67 2016 Atallah / EM DG PTI NC TRS

Substations
Overview

Power plant
Generator

Petersen coil Three winding


Bus coupler
transformer

Double
bus bar
Current limiting
Breaker Cable
reactor

Shunt reactor
Ring main
M
unit Motor Overhead
line

Load
Filter

© Siemens AG 2016
Seite 68 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 34


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Substations
Parameters

Power

Voltage level

Configuration

Space requirements

© Siemens AG 2016
Seite 69 2016 Atallah / EM DG PTI NC TRS

Substations
Main objectives

§ Switchgears are network nodes


ð Interconnection of transmission elements

§ Purpose
ð Operative switching
ð Switching of devices for maintenance
ð Switching of device during faults

§ Execution
ð Number of bubsar
ð Equip with required switch elements
ð Possibility of different switching configurations

© Siemens AG 2016
Seite 70 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 35


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Substations
Arrangement

One-breaker-and-a-half arrangement, 500 kV

Quelle: Vattenfall-Präsentation

© Siemens AG 2016
Seite 71 2016 Atallah / EM DG PTI NC TRS

Substations
Layout

© Siemens AG 2016
Seite 72 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 36


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Substations
High voltage – Products

Gas Insulated Substation Air Insulated Substation

Gas Insulated High Integrated Modular Field Modular Field Dead Tank
Switchgear GIS Switchgear HIS® SIMOBREAKER SIMOVER® Switching Device

© Siemens AG 2016
Seite 73 2016 Atallah / EM DG PTI NC TRS

Substations
High voltage – Products

© Siemens AG 2016
Seite 74 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 37


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Substations
Typical configuration in 380/220 or 110 kV

110-kV

© Siemens AG 2016
Seite 75 2016 Atallah / EM DG PTI NC TRS

Substations
Surge arresters

Technology

Rating

Makeup

© Siemens AG 2016
Seite 76 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 38


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Substations
Surge arresters products

3EK7 3EP4 3EP2 3EP3 3EQ1 3EQ4 3EQ3 3ES2 3ES5 3ES7
3EL2 ,
3ES9

Silicone Porcelain Silicone GIS


(cage design) (tube design)

© Siemens AG 2016
Seite 77 2016 Atallah / EM DG PTI NC TRS

Substations
Surge arrester – 400 kV Transformator protection

© Siemens AG 2016
Seite 78 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 39


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Substations
Instrument transformers

110-kV

© Siemens AG 2016
Seite 79 2016 Atallah / EM DG PTI NC TRS

Substations
Instrument transformers – Voltage transformer

© Siemens AG 2016
Seite 80 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 40


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Substations
Instrument transformers – Current transformer

© Siemens AG 2016
Seite 81 2016 Atallah / EM DG PTI NC TRS

Thank you for your attention!

© Siemens AG 2016 © Siemens AG 2016. All rights reserved.


Seite 82 2016 A. Ettinger Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 41


Structure and Equipment Day 1
Siemens AG, EM DG PTI NC

Contact

Adham Atallah
Senior Consultant
Siemens AG, EM DG PTI NC TRS
Freyeslebenstrasse 1
91058 Erlangen, Germany
Telefon: +49 (9131) 7 28265

E-Mail:
adham.atallah@siemens.com

siemens.com/power-technologies

© Siemens AG 2016
Seite 83 2016 Atallah / EM DG PTI NC TRS

Transmission Network Planning Training Page 42