Introduction
Definition
Power stations may be located near a fuel source, at a dam site, or to take
advantage of renewable energy sources, and are often located away from
heavily populated areas.
The bulk power transmission network will move the power long distances,
sometimes across international boundaries, until it reaches its wholesale
customer (usually the company that owns the local electric power distribution
network).
© Siemens AG 2016
Seite 3 2016 Atallah / EM DG PTI NC TRS
Introduction
Main parameters
§ Total generation
§ Total load
§ Nominal voltage
§ Nominal frequency
© Siemens AG 2016
Seite 4 2016 Atallah / EM DG PTI NC TRS
Introduction
Network schematic representation
Three-phase System
Single line
diagram
Equivalent circuit in
symmetrical components
© Siemens AG 2016
Seite 5 2016 Atallah / EM DG PTI NC TRS
Introduction
Network geographic representation
© Siemens AG 2016
Seite 6 2016 Atallah / EM DG PTI NC TRS
Introduction
Voltage levels
© Siemens AG 2016
Seite 7 2016 Atallah / EM DG PTI NC TRS
Power plant
Generator
Double
bus bar
Current limiting
Breaker Cable
reactor
Shunt reactor
Ring main
M
unit Motor Overhead
line
Load
Filter
© Siemens AG 2016
Seite 8 2016 Atallah / EM DG PTI NC TRS
Power plant
Generator
Double
bus bar
Current limiting
Breaker Cable
reactor
Shunt reactor
Ring main
M
unit Motor Overhead
line
Load
Filter
© Siemens AG 2016
Seite 9 2016 Atallah / EM DG PTI NC TRS
MW % h/a
47%
Hard coal up to 800 MW 6000
(CCP 58 %)
Lignite up to 900 MW 43 7500
Nuclear 900 -1600 MW 35 7500
40%
Gasturbine 340 MW 1400-3000
(CCP 60 %)
few kW
River hydro up to 300 MW 85 5000-8760
(Germany)
1000 MW (Germany)
Pumped storage 90 % / 80% 750-5000
bis 18 GW (world)
1800 onshore
Wind 0,5...7,5 MW 45-50%
3400 offshore
Solar 0....12 MW 14-17% 850-1000
© Siemens AG 2016
Seite 10 2016 Atallah / EM DG PTI NC TRS
© Siemens AG 2016
Seite 11 2016 Atallah / EM DG PTI NC TRS
© Siemens AG 2016
Seite 12 2016 Atallah / EM DG PTI NC TRS
© Siemens AG 2016
Seite 13 2016 Atallah / EM DG PTI NC TRS
© Siemens AG 2016
Seite 14 2016 Atallah / EM DG PTI NC TRS
Wind Photovoltaic
recent success story static generation
after many generations remote islands
of hydro power possible
Tidal currents
predictable generation
© Siemens AG 2016
Seite 15 2016 Atallah / EM DG PTI NC TRS
Electric generator
Overview
Power plant
Generator
Double
bus bar
Current limiting
Breaker Cable
reactor
Shunt reactor
Ring main
M
unit Motor Overhead
line
Load
Filter
© Siemens AG 2016
Seite 16 2016 Atallah / EM DG PTI NC TRS
Electric generator
Parameters
Power kW up to MW
Voltage
Revolutions
Excitation
Cooling
Weight
© Siemens AG 2016
Seite 17 2016 Atallah / EM DG PTI NC TRS
Electric generator
General types
© Siemens AG 2016
Seite 18 2016 Atallah / EM DG PTI NC TRS
Electric generator
Operation principle
When the poles on the rotor, driven by prime mover, move past the stator
conductors, due to the relative motion of conductors with respect to the poles,
the magnetic flux lines are cut by the conductors and voltage is induced in
them.
© Siemens AG 2016
Seite 19 2016 Atallah / EM DG PTI NC TRS
Electric generator
Capability curve
inductive capacitive
© Siemens AG 2016
Seite 20 2016 Atallah / EM DG PTI NC TRS
Power transformer
Overview
Power plant
Generator
Double
bus bar
Current limiting
Breaker Cable
reactor
Shunt reactor
Ring main
M
unit Motor Overhead
line
Load
Filter
© Siemens AG 2016
Seite 21 2016 Atallah / EM DG PTI NC TRS
Power transformer
Parameters
Power kW up to MW
Voltage
Impedance
Vector group
Core type
Cooling
Weight
© Siemens AG 2016
Seite 22 2016 Atallah / EM DG PTI NC TRS
Power transformer
Operation principle
© Siemens AG 2016
Seite 23 2016 Atallah / EM DG PTI NC TRS
Power transformer
Core type
© Siemens AG 2016
Seite 24 2016 Atallah / EM DG PTI NC TRS
Power transformer
Inter-tie transformer core
© Siemens AG 2016
Seite 25 2016 Atallah / EM DG PTI NC TRS
Power transformer
Winding for high power and votlage
© Siemens AG 2016
Seite 26 2016 Atallah / EM DG PTI NC TRS
Power transformer
Vector group
Main configurations:
§ Y-Y
§ Y-D
§ D- D
§ D-Y
Parallel operations:
All the transformers should have same vector group & polarity of the winding.
Removing harmonics:
The delta winding allows third-harmonic currents to circulate within the transformer, and
prevents third-harmonic currents from flowing in the supply line.
© Siemens AG 2016
Seite 27 2016 Atallah / EM DG PTI NC TRS
Power transformer
Cooling type
© Siemens AG 2016
Seite 28 2016 Atallah / EM DG PTI NC TRS
Power transformer
Tap changer
© Siemens AG 2016
Seite 29 2016 Atallah / EM DG PTI NC TRS
Power transformer
General types by application
© Siemens AG 2016
Seite 30 2016 Atallah / EM DG PTI NC TRS
Power transformer
Schematic representation
© Siemens AG 2016
Seite 31 2016 Atallah / EM DG PTI NC TRS
Power transformer
850 MVA Generator transformer, 410 ± 14,6% / 27 kV
© Siemens AG 2016
Seite 32 2016 Atallah / EM DG PTI NC TRS
Power transformer
630-kVA Oil-immersed distribution transformers
© Siemens AG 2016
Seite 33 2016 Atallah / EM DG PTI NC TRS
Power transformer
630-kVA Cast-resin transformer 20/0,4 kV
© Siemens AG 2016
Seite 34 2016 Atallah / EM DG PTI NC TRS
Power plant
Generator
Double
bus bar
Current limiting
Breaker Cable
reactor
Shunt reactor
Ring main
M
unit Motor Overhead
line
Load
Filter
© Siemens AG 2016
Seite 35 2016 Atallah / EM DG PTI NC TRS
Cable
Voltage
Rated power
Installation
Insulation
Overhead line
Voltage
Rated power
Tower
© Siemens AG 2016
Seite 36 2016 Atallah / EM DG PTI NC TRS
© Siemens AG 2016
Seite 37 2016 Atallah / EM DG PTI NC TRS
© Siemens AG 2016
Seite 38 2016 Atallah / EM DG PTI NC TRS
Light 16 mm/kV
Medium 20 mm/kV
Heavy 25 mm/kV
Very heavy 31 mm/kV
© Siemens AG 2016
Seite 39 2016 Atallah / EM DG PTI NC TRS
© Siemens AG 2016
Seite 40 2016 Atallah / EM DG PTI NC TRS
© Siemens AG 2016
Seite 41 2016 Atallah / EM DG PTI NC TRS
© Siemens AG 2016
Seite 42 2016 Atallah / EM DG PTI NC TRS
© Siemens AG 2016
Seite 43 2016 Atallah / EM DG PTI NC TRS
© Siemens AG 2016
Seite 44 2016 Atallah / EM DG PTI NC TRS
© Siemens AG 2016
Seite 45 2016 Atallah / EM DG PTI NC TRS
GW GW
8 4
1000 kV AC GIL
6 300 kV DC
3
800 kV DC
GIL 500 kV AC
4 750 kV AC 2
550 kV DC DC Cable 500 kV
2 1
Cable 380 kV AC
380 kV AC
km km
1000 2000 100 200 500 1000
© Siemens AG 2016
Seite 46 2016 Atallah / EM DG PTI NC TRS
Electrical loads
Overview
Power plant
Generator
Double
bus bar
Current limiting
Breaker Cable
reactor
Shunt reactor
Ring main
M
unit Motor Overhead
line
Load
Filter
© Siemens AG 2016
Seite 47 2016 Atallah / EM DG PTI NC TRS
Electrical loads
Parameters
Apparent power
Active power
Reactive power
Usage
Harmonics
Heating
Light
Motor
Power electronics
© Siemens AG 2016
Seite 48 2016 Atallah / EM DG PTI NC TRS
Electrical loads
Types
§ Resistive
§ Capacitive
§ Inductive
§ Linear
§ Non-linear
§ Static
§ Dynamic
§ Continuous
§ Intermittent
© Siemens AG 2016
Seite 49 2016 Atallah / EM DG PTI NC TRS
Electrical loads
Types
U voltage at node in %
fS power consumed in %
© Siemens AG 2016
Seite 50 2016 Atallah / EM DG PTI NC TRS
Electrical switch
Overview
Power plant
Generator
Double
bus bar
Current limiting
Breaker Cable
reactor
Shunt reactor
Ring main
M
unit Motor Overhead
line
Load
Filter
© Siemens AG 2016
Seite 51 2016 Atallah / EM DG PTI NC TRS
Electrical switch
Parameters
Voltage
Nominal current
Short-circuit current
Switching principle
Circuit breaker
Load break switch
Isolator switch
Earth switch
© Siemens AG 2016
Seite 52 2016 Atallah / EM DG PTI NC TRS
Electrical switch
Switching devices
• Circuit breaker
ð can interrupt short-circuit currents
I''
ex. k = 70 kA at Un = 380 kV
ð Very expensive
• Load break switch
ð Can make and break load current
ð Can not interrupt short-circuit current
ð Expensive
ð In low votlage networks used with fuses
• Isolator swtich
ð Operated only when a current is not present
ð Can not make or break load currents
ð Can not interrupt short-circuit currents Symbol
ð Relative price
© Siemens AG 2016
Seite 53 2016 Atallah / EM DG PTI NC TRS
Electrical switch
Circuit breaker – Live tank
Rated short-circuit
current [kA]
80
3AT2/3 3AT4/5
63
50
40
31,5
25
© Siemens AG 2016
Seite 54 2016 Atallah / EM DG PTI NC TRS
Electrical switch
Circuit breaker – Arc slef compression quenching
The current conducting path of the interrupter unit consists of the contact carrier (1), the base (6) and the moveable
contact cylinder (5). In the closed position, the current flows via the main contact (4) and the contact cylinder (5).
During the opening operation, the main contact (4) opens first, and the current commutates to the still closed arcing
contact. During the further course of opening, the arcing contact (3) opens up and an arc is drawn between the
contacts.
At the same time, the contact cylinder (5) moves into the base (6) and compresses the SF6 gas located there. This
gas compression creates a gas flow through the contact cylinder (5) and the nozzle (2) to the arcing contact,
extinguishing the arc.
© Siemens AG 2016
Seite 55 2016 Atallah / EM DG PTI NC TRS
Electrical switch
Circuit breaker – Dead tank
63
Rated short-circuit current [kA]
50
40
31,5
20
SPS-2 SPS-2 SPS-2 3AT2/3-DT
© Siemens AG 2016
Seite 56 2016 Atallah / EM DG PTI NC TRS
Electrical switch
Isolating switch
Switchgear
Overview
Power plant
Generator
Double
bus bar
Current limiting
Breaker Cable
reactor
Shunt reactor
Ring main
M
unit Motor Overhead
line
Load
Filter
© Siemens AG 2016
Seite 58 2016 Atallah / EM DG PTI NC TRS
Switchgear
Parameters
Configuration
Insulation material
Busbars
Coupler
© Siemens AG 2016
Seite 59 2016 Atallah / EM DG PTI NC TRS
Switchgear
Experience with gas insulated switchgear 40 Jahre
© Siemens AG 2016
Seite 60 2016 Atallah / EM DG PTI NC TRS
Switchgear
GIS – 245 kV Cable field
© Siemens AG 2016
Seite 61 2016 Atallah / EM DG PTI NC TRS
Switchgear
GIS – Advantages
§ Lower weight
§ Environmently friendly
© Siemens AG 2016
Seite 62 2016 Atallah / EM DG PTI NC TRS
Switchgear
GIS – Products
50
40 8DN8
31,5
25
72,5 123 145 170 245 300 362 420 550 800
Voltage [kV]
© Siemens AG 2016
Seite 63 2016 Atallah / EM DG PTI NC TRS
Switchgear
GIS – Datasheet
© Siemens AG 2016
Seite 64 2016 Atallah / EM DG PTI NC TRS
Switchgear
Schematic configurations
© Siemens AG 2016
Seite 65 2016 Atallah / EM DG PTI NC TRS
Switchgear
HIS-installation in H-Configuration
© Siemens AG 2016
Seite 66 2016 Atallah / EM DG PTI NC TRS
Switchgear
HIS-installation in H-Configuration
© Siemens AG 2016
Seite 67 2016 Atallah / EM DG PTI NC TRS
Substations
Overview
Power plant
Generator
Double
bus bar
Current limiting
Breaker Cable
reactor
Shunt reactor
Ring main
M
unit Motor Overhead
line
Load
Filter
© Siemens AG 2016
Seite 68 2016 Atallah / EM DG PTI NC TRS
Substations
Parameters
Power
Voltage level
Configuration
Space requirements
© Siemens AG 2016
Seite 69 2016 Atallah / EM DG PTI NC TRS
Substations
Main objectives
§ Purpose
ð Operative switching
ð Switching of devices for maintenance
ð Switching of device during faults
§ Execution
ð Number of bubsar
ð Equip with required switch elements
ð Possibility of different switching configurations
© Siemens AG 2016
Seite 70 2016 Atallah / EM DG PTI NC TRS
Substations
Arrangement
Quelle: Vattenfall-Präsentation
© Siemens AG 2016
Seite 71 2016 Atallah / EM DG PTI NC TRS
Substations
Layout
© Siemens AG 2016
Seite 72 2016 Atallah / EM DG PTI NC TRS
Substations
High voltage – Products
Gas Insulated High Integrated Modular Field Modular Field Dead Tank
Switchgear GIS Switchgear HIS® SIMOBREAKER SIMOVER® Switching Device
© Siemens AG 2016
Seite 73 2016 Atallah / EM DG PTI NC TRS
Substations
High voltage – Products
© Siemens AG 2016
Seite 74 2016 Atallah / EM DG PTI NC TRS
Substations
Typical configuration in 380/220 or 110 kV
110-kV
© Siemens AG 2016
Seite 75 2016 Atallah / EM DG PTI NC TRS
Substations
Surge arresters
Technology
Rating
Makeup
© Siemens AG 2016
Seite 76 2016 Atallah / EM DG PTI NC TRS
Substations
Surge arresters products
3EK7 3EP4 3EP2 3EP3 3EQ1 3EQ4 3EQ3 3ES2 3ES5 3ES7
3EL2 ,
3ES9
© Siemens AG 2016
Seite 77 2016 Atallah / EM DG PTI NC TRS
Substations
Surge arrester – 400 kV Transformator protection
© Siemens AG 2016
Seite 78 2016 Atallah / EM DG PTI NC TRS
Substations
Instrument transformers
110-kV
© Siemens AG 2016
Seite 79 2016 Atallah / EM DG PTI NC TRS
Substations
Instrument transformers – Voltage transformer
© Siemens AG 2016
Seite 80 2016 Atallah / EM DG PTI NC TRS
Substations
Instrument transformers – Current transformer
© Siemens AG 2016
Seite 81 2016 Atallah / EM DG PTI NC TRS
Contact
Adham Atallah
Senior Consultant
Siemens AG, EM DG PTI NC TRS
Freyeslebenstrasse 1
91058 Erlangen, Germany
Telefon: +49 (9131) 7 28265
E-Mail:
adham.atallah@siemens.com
siemens.com/power-technologies
© Siemens AG 2016
Seite 83 2016 Atallah / EM DG PTI NC TRS