05 - Report Appendix N - 2017 Subtransmission System - Contingency Results
05 - Report Appendix N - 2017 Subtransmission System - Contingency Results
Appendix
SOHAG
IDFO
FEROSLKN
Buses
ISNA-GEN
ISNA
MALAWI
LXRSHRK
0.6 0.7 0.8 0.9 1.0 1.1 1.2
Voltage [pu]
Figure N 1 EETC2017 Peak Model – Voltage Profile at 132 kV Level during N-1 Contingencies (Line
Outages) – Fixed Tap Position vs. Variable Tap Position
MESHTA
AL KHARGA
C.QENA
ELBATS
ABUTESHT
QOHAFA
QOHAFA2
WADISH2
KOMOSHEM
D1B.HMIL
D2B.HMIL
BANIHMIL
QEFT
SANORS
NAKADA
MINIA W.
ELBDARI
QOUS PAPER 2
ABUKORKS
ASSUIT NEW
SAHEL SLEEM
BANI RAFE
DEMO MOBILE
E.MGHAGH
ABNOB
S.WADY CMNT
DIROT
ELFASHN
Buses
MINIA IN
MINIA E.
SAMOSTA 2
NASR
KURIMAT
ABO RADY
D.B.2
D.B.1
QOSHESHA
SOHAG N
ABU TEEG
ELWASTA
EL MRAGHA 2
EL MRAGHA 1
SODFA
ELGHNAIM
TEMA 33
CM.GAYADA
ELMONSHA
SHAND. MOBIL
EL GHRQ
SAQLTA
DARSLAM
BEBA
SAMOSTA 1
AHNASEA
ELKOAMEL
ELBLIANA
AKHMEM
0.0 0.2 0.4 0.6 0.8 1.0 1.2
Voltage [pu]
Figure N 2 EETC2017 Peak Model – Voltage Profile at 66 kV Level during N-1 Contingencies (Line Out-
ages) – Fixed Tap Position vs. Variable Tap Position
NAKADA
ELBATS
QOHAFA
QOHAFA2
DEMO MOBILE
ABO RADY
KOMOSHEM
MINIA IN
QOUS PAPER 2
QEFT
MINIA E.
AHNASEA
ELFASHN
WADISH2
SANORS
SAMOSTA 2
S.WADY CMNT
DIROT
ELWASTA
ABU TEEG
EL MRAGHA 1
ELBDARI
CM.GAYADA
Buses
ELGHNAIM
SODFA
NASR
SHAND. MOBIL
TEMA 33
SOHAG N
KURIMAT
ASSUIT NEW
SAQLTA
BEBA
SAHEL SLEEM
D.B.2
D.B.1
QOSHESHA
EL MRAGHA 2
DARSLAM
SAMOSTA 1
BNISWIF-W
KOM AHMR
ABNOB
ELBLIANA
ELMONSHA
ELKOAMEL
AKHMEM
0.0 0.2 0.4 0.6 0.8 1.0 1.2
Voltage [pu]
Figure N 3 EETC2017 Peak Model – Voltage Profile at 66 kV Level during N-1 Contingencies (Trans-
former Outages) – Fixed Tap Position vs. Variable Tap Position
Table N 1 EETC2017 Peak Model – Voltage Violations at 132 kV Level during N-1 Contingencies (Line
Outages) – Fixed Tap Position vs. Variable Tap Position
Table N 2 EETC2017 Peak Model – Voltage Violations at 66 kV Level during N-1 Contingencies (Line
Outages) – Fixed Tap Position vs. Variable Tap Position
Table N 3 EETC2017 Peak Model – Voltage Violations at 66 kV Level during N-1 Contingencies (Trans-
former Outages) – Fixed Tap Position vs. Variable Tap Position
Table N 4 Overloaded Lines on the Subtransmission Level during N-1 Contingency (Line Outages)