EETC Transmission Master Plan Project

Appendix

Appendix M 2017 Subtransmission System – Load Flow Results

ALUMINM-1

ALUMINM-1

NAG-HAMD-1

NAG-HAMD-2

ALUMINM-2

ALUMINM-3

ASWAN

KEMA
Buses

QUENA

QUENA

KOMOMBO

SOHAG

ISNA-GEN

IDFO

FEROSLKN

ISNA

LXRSHRK
0.85 0.9 0.95 1 1.05 1.1
Voltage [pu]

EETC2017 - Peak - Nominal Tap Position EETC2017 - Peak - Actual Tap Position
EETC2017 - Peak - Auto-Tapping Vmin (0.95 pu)
Vmax (1.05 pu)

Figure M 1 EETC2017 Peak Model – Voltage Profile at 132 kV Level – Zone 1 – Nominal Tap Position vs.
Actual Tap Position vs. Auto-Tapping

Siemens PTI Version C – Final Version Page 1 of 17


EETC Transmission Master Plan Project
Appendix

SAMALUT

C-MINA

N-ASSYUT

ASMNT-1

ASMNT-2

WAHAT
Buses

DEMO

MAGAGA

MENIA

ASSYUT-STEAM

BNISWIF

MALAWI
0.9 0.95 1 1.05 1.1
Voltage [pu]

EETC2017 - Peak - Nominal Tap Position EETC2017 - Peak - Actual Tap Position
EETC2017 - Peak - Auto-Tapping Vmin (0.95 pu)
Vmax (1.05 pu)

Figure M 2 EETC2017 Peak Model – Voltage Profile at 132 kV Level – Zone 2 – Nominal Tap Position vs.
Actual Tap Position vs. Auto-Tapping

Siemens PTI Version C – Final Version Page 2 of 17


EETC Transmission Master Plan Project
Appendix

BALAT
A.TARTOR 2
TOSHK 2
ESLAH 2
ESLAH 1
ESLAH 3
ESLAH 4
TOSHK 1
A.SEMBEL
A. DAM
N.HAMADY 1
W.NOKRA 66
H.D WEST
W.NAKRA 2
W.NAKRA 3
ASWAN.E
H.D EAST
W.NAKRA 1
OYNAT66
ASWAN W
N.HAM EAST
SIEL
SELWA
DISHNA
EDFO_E
ASWAN.N
N.HAMADY 2
BAHGORA
TLMBAT DARB
KALABSHA
OYNAT 1
ELSAIDA
KOM OMBO
AL AAKAB
ELSEBAIA NEW
N.H DAM
OYNAT 2
Buses

ABUTESHT
QENA-S
MARASHDA
ESNA
D1B.HMIL
D2B.HMIL
BANIHMIL
TEMA 1
TEMA 2
LUXOR_E
LUXOR_W
TEBA
NEW ESNA66
ARMANT
HUMIDAT
TAHTA
AUDISAT
RADWANIA
SALHYA
HEGAZA
C.ELNAHD
GERGA 2
GERGA
C.QENA
MESHTA
NAKADA
QOUS PAPER 2
QEFT
TEMA 33
EL MRAGHA 1
SHAND. MOBIL
SOHAG N
SAQLTA
DARSLAM
EL MRAGHA 2
ELBLIANA
ELMONSHA
ELKOAMEL
AKHMEM
0.55 0.65 0.75 0.85 0.95 1.05 1.15 1.25
Voltage [pu]
EETC2017 - Peak - Nominal Tap Position EETC2017 - Peak - Actual Tap Position
EETC2017 - Peak - Auto-Tapping Vmin (0.95 pu)
Vmax (1.05 pu)

Figure M 3 EETC2017 Peak Model – Voltage Profile at 66 kV Level – Zone 1 – Nominal Tap Position vs.
Actual Tap Position vs. Auto-Tapping

Siemens PTI Version C – Final Version Page 3 of 17


EETC Transmission Master Plan Project
Appendix

MGAGA-W1
E.MGHAGH
AL MANGAM
A.TARTOR 1
MOUT
MGAGA-W2
ELFASHN
SAMALUT 1
SAMALUT 2
AL KHARGA
SAMOSTA 2
DER SAMALOT
MATAY
MALAWI
BANIMZAR 1
BANIMZAR 2
WESTFAUM
ASSUIT.INT
MAASARA
DER MOAS
ABUGNDER
BANI GHALEB
EL SHOSHNA
MINIA W.
KIMNFARS
GAM.ASSUIT
ABUKORKS
ABUKSA
ASSIUT 2
BNISWIF-W
RIVA
KOM AHMR
MWAD BENAA
Buses

BANI RAFE
SWIF-E
MINIA IN
MINIA E.
CM.BINSWIF
DEMO MOBILE
W.ELNIL
EL GHRQ
DIROT
DEMO
DEMO-2
AHNASEA
ABO RADY
ABU TEEG
WADISH2
ASSUIT NEW
ELGHNAIM
SODFA
SAHEL SLEEM
ELBATS
QOHAFA
QOHAFA2
KOMOSHEM
ELWASTA
S.WADY CMNT
ABNOB
ELBDARI
SANORS
CM.GAYADA
NASR
KURIMAT
BEBA
D.B.2
D.B.1
QOSHESHA
SAMOSTA 1
0.6 0.7 0.8 0.9 1 1.1 1.2 1.3
Voltage [pu]
EETC2017 - Peak - Nominal Tap Position EETC2017 - Peak - Actual Tap Position
EETC2017 - Peak - Auto-Tapping Vmin (0.95 pu)
Vmax (1.05 pu)

Figure M 4 EETC2017 Peak Model – Voltage Profile at 66 kV Level – Zone 2 – Nominal Tap Position vs.
Actual Tap Position vs. Auto-Tapping

Siemens PTI Version C – Final Version Page 4 of 17


EETC Transmission Master Plan Project
Appendix

Table M 1 Comparison of Transformer Tap Positions - Zone 1

Transformer (From) Transformer (To) Tap Position*)


Bus No. Bus Name Voltage [kV] Bus No. Bus Name Voltage [kV] (a) (b) (c)
501 NAG-H220-1 131 N.HAMADY 1 9 8 9
501 NAG-H220-1 131 N.HAMADY 1 9 8 9
501 NAG-H220-1 131 N.HAMADY 1 9 8 9
502 GERGA220 2998 GERGA 2 9 11 8
502 GERGA220 2998 GERGA 2 9 10 8
502 GERGA220 3000 GERGA 9 10 8
502 GERGA220 3000 GERGA 9 10 8
503 TEMA220 6626 TEMA 1 9 11 9
503 TEMA220 6626 TEMA 1 9 11 9
503 TEMA220 66260 TEMA 2 9 10 9
506 QUENA220 3002 QENA-S 9 11 9
506 QUENA220 3002 QENA-S 9 11 9
506 QUENA220 3002 QENA-S 9 11 9
507 LUXOR220 6629 LUXOR_E 9 8 8
507 LUXOR220 6629 LUXOR_E 9 8 8
507 LUXOR220 6629 LUXOR_E 10 7 8
508 SELWA220 3004 SELWA 10 9 10
508 SELWA220 3004 SELWA 10 9 10
220 66
508 SELWA220 3004 SELWA 9 9 10
586 A.DAM220 2999 A. DAM 9 5 10
586 A.DAM220 2999 A. DAM 9 5 10
609 WAD.NOKR220 3005 W.NOKRA 66 9 8 9
609 WAD.NOKR220 3005 W.NOKRA 66 9 8 9
609 WAD.NOKR220 3005 W.NOKRA 66 9 9 9
609 WAD.NOKR220 3005 W.NOKRA 66 9 9 9
615 TOSHK220-1 3006 TOSHK 1 9 9 11
615 TOSHK220-1 3006 TOSHK 1 9 9 11
616 TOSHK220-2 66 TOSHK 2 9 9 12
616 TOSHK220-2 66 TOSHK 2 9 9 12
620 A.TARTOR220 10021 A.TARTOR 2 9 2 16
650 OYNAT220 651 OYNAT66 9 9 9
650 OYNAT220 651 OYNAT66 9 9 9
760 BALAT220 761 BALAT 9 4 14
760 BALAT220 761 BALAT 9 4 14
40094 ESNA 40095 ESNA 9 9 9
40094 ESNA 40095 ESNA 9 9 9
2510 NAG-HAMD-1 3011 N.HAMADY 2 9 13 9
2510 NAG-HAMD-1 132 3011 N.HAMADY 2 66 9 13 9
2510 NAG-HAMD-1 3011 N.HAMADY 2 9 13 9
440 ALM220 2512 ALUMINM-1 9 9 9
441 ALM220 2555 ALUMINM-1 9 9 9
220 132
506 QUENA220 2515 QUENA 9 12 5
506 QUENA220 2515 QUENA 9 12 5

Siemens PTI Version C – Final Version Page 5 of 17


EETC Transmission Master Plan Project
Appendix

Bus No. Bus Name Voltage [kV] Bus No. Bus Name Voltage [kV] (a) (b) (c)
586 A.DAM220 2501 ASWAN 9 6 9
586 A.DAM220 220 2501 ASWAN 132 9 6 9
586 A.DAM220 2501 ASWAN 9 6 9
*) (a) - Nominal Tap Position. (b) - Actual Tap Position as Measured. (c) - Optimum Tap Position from PSS®E with Automatic Tap Adjustment

Siemens PTI Version C – Final Version Page 6 of 17


EETC Transmission Master Plan Project
Appendix

Table M 2 Comparison of Transformer Tap Positions - Zone 2

Transformer (From) Transformer (To) Tap Position*)


Bus
Bus No. Bus Name Voltage [kV] Bus Name Voltage [kV] (a) (b) (c)
No.
500 WESTFAUM220 499 WESTFAUM 9 9 9
500 WESTFAUM220 499 WESTFAUM 9 9 9
500 WESTFAUM220 499 WESTFAUM 9 10 9
500 WESTFAUM220 499 WESTFAUM 9 10 9
504 ASSYUT220 6625 ASSUIT.INT 9 10 9
504 ASSYUT220 6625 ASSUIT.INT 9 11 9
514 DEMO220 6501 DEMO 9 14 1
514 DEMO220 6501 DEMO 9 14 1
514 DEMO220 6530 DEMO-2 9 14 8
514 DEMO220 6530 DEMO-2 9 14 8
516 SWIF-E220 6624 SWIF-E 9 11 8
516 SWIF-E220 6624 SWIF-E 9 11 8
516 SWIF-E220 6624 SWIF-E 9 11 8
516 SWIF-E220 6624 SWIF-E 9 11 8
517 MAGAGA-W220 6617 MGAGA-W1 9 8 15
220 66
517 MAGAGA-W220 6617 MGAGA-W1 9 8 15
517 MAGAGA-W220 66170 MGAGA-W2 9 9 12
610 RIVA220 6614 RIVA 9 11 9
610 RIVA220 6614 RIVA 9 11 9
610 RIVA220 6614 RIVA 9 11 9
611 MALAWI220 6616 MALAWI 9 8 11
611 MALAWI220 6616 MALAWI 9 8 11
611 MALAWI220 6616 MALAWI 9 8 11
611 MALAWI220 6616 MALAWI 9 8 11
612 SAM220 6618 SAMALUT 1 9 5 13
612 SAM220 6618 SAMALUT 1 9 4 13
612 SAM220 6619 SAMALUT 2 9 4 13
620 A.TARTOR220 1002 A.TARTOR 1 9 7 9
620 A.TARTOR220 1002 A.TARTOR 1 9 7 9
5140 DEMO MOBILE 5141 DEMO MOBILE 9 13 4
6004 BNISWIF 6600 BNISWIF-W 9 9 9
132 66
6004 BNISWIF 6600 BNISWIF-W 9 9 9
504 ASSYUT220 6001 N-ASSYUT 9 9 9
504 ASSYUT220 220 6001 N-ASSYUT 132 9 9 9
504 ASSYUT220 6001 N-ASSYUT 9 10 9
*) (a) - Nominal Tap Position. (b) - Actual Tap Position as Measured. (c) - Optimum Tap Position from PSS®E with Automatic Tap Adjustment

Siemens PTI Version C – Final Version Page 7 of 17


EETC Transmission Master Plan Project
Appendix

Table M 3 EETC2017 Peak Model – Voltage Violations at 132 kV Level – Zone 1 – Nominal Tap Position
vs. Actual Tap Position vs. Auto-Tapping

Nominal Tap Position


Bus No. Bus Name Zone Voltage [pu] Voltage [kV]
2512 ALUMINM-1 1.06 139.7
2555 ALUMINM-1 1.06 139.7

2505 KOMOMBO 0.93 122.4


2517 SOHAG 0.93 122.1
1
2509 ISNA-GEN 0.91 119.7
2504 IDFO 0.91 119.6
2506 FEROSLKN 0.91 119.6
2508 ISNA 0.91 119.6
2507 LXRSHRK 0.90 118.7

Actual Tap Position


Bus No. Bus Name Zone Voltage [pu] Voltage [kV]
2515 QUENA 0.93 123.2
2514 QUENA 0.93 123.2
2505 KOMOMBO 0.92 122.0
2517 SOHAG 0.91 120.8
2504 IDFO 1 0.90 118.8
2506 FEROSLKN 0.90 118.8
2509 ISNA-GEN 0.90 118.3
2508 ISNA 0.90 118.2
2507 LXRSHRK 0.88 116.7

Optimum Tap Position from PSS®E with Automatic Tap Adjustment


Bus No. Bus Name Zone Voltage [pu] Voltage [kV]
2505 KOMOMBO 0.93 122.7
2517 SOHAG 0.93 122.4
2509 ISNA-GEN 0.92 120.8
2508 ISNA 1 0.91 120.7
2507 LXRSHRK 0.91 120.4
2504 IDFO 0.91 120.3
2506 FEROSLKN 0.91 120.2

Siemens PTI Version C – Final Version Page 8 of 17


EETC Transmission Master Plan Project
Appendix

Table M 4 EETC2017 Peak Model – Voltage Violations at 132 kV Level – Zone 2 – Nominal Tap Position
vs. Actual Tap Position vs. Auto-Tapping

Nominal Tap Position


Bus No. Bus Name Zone Voltage [pu] Voltage [kV]
– 2 –

Actual Tap Position


Bus No. Bus Name Zone Voltage [pu] Voltage [kV]
6007 MALAWI 2 0.95 125.1

Optimum Tap Position from PSS®E with Automatic Tap Adjustment


Bus No. Bus Name Zone Voltage [pu] Voltage [kV]
– 2 –

Siemens PTI Version C – Final Version Page 9 of 17


EETC Transmission Master Plan Project
Appendix

Table M 5 EETC2017 Peak Model – Voltage Violations at 66 kV Level – Zone 1 – Nominal Tap Position
vs. Actual Tap Position vs. Auto-Tapping

Nominal Tap Position


Bus No. Bus Name Zone Voltage [pu] Voltage [kV]
761 BALAT 1.13 74.8
10021 A.TARTOR 2 1.12 73.6
66 TOSHK 2 1.09 71.6
208624 ESLAH 2 1.09 71.6
208622 ESLAH 1 1.08 71.3
208626 ESLAH 3 1.08 71.2
208628 ESLAH 4 1.08 71.2
3006 TOSHK 1 1.08 71.1
208630 A.SEMBEL 1.07 70.7
2999 A. DAM 1.06 70.0
131 N.HAMADY 1 1.06 69.8
3005 W.NOKRA 66 1.05 69.6
208620 H.D WEST 1.05 69.3

208533 C.ELNAHD 0.95 62.6


2998 GERGA 2 0.95 62.5
3000 GERGA 1 0.95 62.5
208522 C.QENA 0.94 62.1
208430 MESHTA 0.94 61.9
208550 NAKADA 0.94 61.9
208537 QOUS PAPER 2 0.92 61.0
208526 QEFT 0.92 60.8
6627 TEMA 33 0.88 58.3
208403 EL MRAGHA 1 0.88 58.0
208444 SHAND. MOBIL 0.86 56.5
208408 SOHAG N 0.85 56.0
208414 SAQLTA 0.85 55.8
208402 DARSLAM 0.83 55.0
208401 EL MRAGHA 2 0.83 54.8
208404 ELBLIANA 0.80 52.7
208407 ELMONSHA 0.80 52.5
208406 ELKOAMEL 0.74 48.8
208405 AKHMEM 0.67 44.3
Actual Tap Position
Bus No. Bus Name Zone Voltage [pu] Voltage [kV]
761 BALAT 1.20 78.9
10021 A.TARTOR 2 1.17 77.4
2999 A. DAM 1.11 73.0
1
208620 H.D WEST 1.10 72.4
208616 ASWAN.E 1.09 72.2
208618 H.D EAST 1.09 72.1

Siemens PTI Version C – Final Version Page 10 of 17


EETC Transmission Master Plan Project
Appendix

Bus No. Bus Name Zone Voltage [pu] Voltage [kV]


208615 ASWAN W 1.08 71.5
208607 SIEL 1.08 71.1
66 TOSHK 2 1.07 70.6
208624 ESLAH 2 1.07 70.6
208614 ASWAN.N 1.07 70.5
208622 ESLAH 1 1.07 70.3
208626 ESLAH 3 1.06 70.2
208628 ESLAH 4 1.06 70.2
3006 TOSHK 1 1.06 70.1
131 N.HAMADY 1 1.06 70.0
208630 A.SEMBEL 1.06 69.7

208532 HEGAZA 0.94 62.3


6626 TEMA 1 0.93 61.6
66260 TEMA 2 0.93 61.6
208534 SALHYA 0.93 61.6
208533 C.ELNAHD 0.92 60.8
208420 TAHTA 0.92 60.7
208520 MARASHDA 1 0.92 60.6
208522 C.QENA 0.91 59.8
2998 GERGA 2 0.90 59.5
3000 GERGA 0.90 59.5
208550 NAKADA 0.90 59.4
208430 MESHTA 0.89 58.6
208537 QOUS PAPER 2 0.89 58.4
208526 QEFT 0.89 58.4
6627 TEMA 33 0.82 54.2
208403 EL MRAGHA 1 0.82 53.9
208444 SHAND. MOBIL 0.79 52.2
208408 SOHAG N 0.79 52.1
208414 SAQLTA 0.78 51.3
208401 EL MRAGHA 2 0.77 50.8
208402 DARSLAM 0.77 50.6
208407 ELMONSHA 0.73 48.1
208404 ELBLIANA 0.73 48.0
208406 ELKOAMEL 0.66 43.9
208405 AKHMEM 0.59 39.0
Optimum Tap Position from PSS®E with Automatic Tap Adjustment
Bus No. Bus Name Zone Voltage [pu] Voltage [kV]
208533 C.ELNAHD 0.95 62.4
208522 C.QENA 0.94 61.8
208550 NAKADA 0.93 61.6
1
208537 QOUS PAPER 2 0.92 60.6
208526 QEFT 0.92 60.5
208403 EL MRAGHA 1 0.90 59.7

Siemens PTI Version C – Final Version Page 11 of 17


EETC Transmission Master Plan Project
Appendix

208408 SOHAG N 0.90 59.2


208402 DARSLAM 0.89 58.5
208444 SHAND. MOBIL 0.88 58.3
6627 TEMA 33 0.88 58.2
208401 EL MRAGHA 2 0.88 58.1
1
208414 SAQLTA 0.87 57.6
208404 ELBLIANA 0.86 56.5
208407 ELMONSHA 0.85 56.3
208406 ELKOAMEL 0.80 53.1
208405 AKHMEM 0.74 49.0

Table M 6 EETC2017 Peak Model – Voltage Violations at 66 kV Level – Zone 2 – Nominal Tap Position
vs. Actual Tap Position vs. Auto-Tapping

Nominal Tap Position


Bus No. Bus Name Zone Voltage [pu] Voltage [kV]
6617 MGAGA-W1 1.15 76.1
108211 E.MGHAGH 1.12 73.8
1007 AL MANGAM 1.12 73.6
1002 A.TARTOR 1 1.12 73.6
1009 MOUT 1.11 73.0
66170 MGAGA-W2 1.11 73.0
108108 ELFASHN 1.09 72.2
6618 SAMALUT 1 1.09 72.1
6619 SAMALUT 2 1.09 72.1
1008 AL KHARGA 1.09 71.9
108105 SAMOSTA 2 1.09 71.9
108202 DER SAMALOT 1.09 71.8
108204 MATAY 1.09 71.7
6616 MALAWI 1.08 71.4
108206 BANIMZAR 1 1.08 71.0
2
108207 BANIMZAR 2 1.08 71.0
499 WESTFAUM 1.06 70.1
6625 ASSUIT.INT 1.06 69.8
108366 MAASARA 1.05 69.5
108216 DER MOAS 1.05 69.3

108017 EL GHRQ 0.95 62.7


108318 DIROT 0.95 62.5
6501 DEMO 0.93 61.3
6530 DEMO-2 0.93 61.3
108116 AHNASEA 0.92 61.0
108129 ABO RADY 0.92 60.6
108301 ABU TEEG 0.91 60.2
108351 WADISH2 0.91 59.9
108365 ASSUIT NEW 0.90 59.5

Siemens PTI Version C – Final Version Page 12 of 17


EETC Transmission Master Plan Project
Appendix

Bus No. Bus Name Zone Voltage [pu] Voltage [kV]


108302 ELGHNAIM 0.90 59.2
6628 SODFA 0.89 59.0
8360 SAHEL SLEEM 0.89 59.0
108034 ELBATS 0.89 58.9
108030 QOHAFA 0.89 58.6
108031 QOHAFA2 0.89 58.6
108036 KOMOSHEM 0.88 58.3
108122 ELWASTA 0.88 58.3
108180 S.WADY CMNT 0.88 58.0
108364 ABNOB 0.87 57.2
2
108355 ELBDARI 0.87 57.1
108033 SANORS 0.87 57.1
108104 CM.GAYADA 0.84 55.7
108120 NASR 0.84 55.1
108124 KURIMAT 0.83 54.6
108106 BEBA 0.82 54.2
108123 D.B.2 0.82 53.9
108121 D.B.1 0.81 53.6
108125 QOSHESHA 0.81 53.4
108112 SAMOSTA 1 0.81 53.4
Actual Tap Position
Bus No. Bus Name Zone Voltage [pu] Voltage [kV]
1007 AL MANGAM 1.17 77.4
1002 A.TARTOR 1 1.17 77.4
1009 MOUT 1.17 77.3
6617 MGAGA-W1 1.17 76.9
6618 SAMALUT 1 1.16 76.7
6619 SAMALUT 2 1.16 76.7
108204 MATAY 1.16 76.6
108202 DER SAMALOT 1.16 76.6
1008 AL KHARGA 1.15 76.2
108211 E.MGHAGH 1.13 74.8
108108 ELFASHN 1.11 73.3
108105 SAMOSTA 2 1.11 73.0
2
66170 MGAGA-W2 1.10 72.8
108208 MINIA W. 1.10 72.6
6616 MALAWI 1.09 72.1
108206 BANIMZAR 1 1.07 70.8
108207 BANIMZAR 2 1.07 70.8
108216 DER MOAS 1.06 70.1

108320 BANI RAFE 0.95 62.4


108363 MWAD BENAA 0.94 62.3
6624 SWIF-E 0.93 61.6
108017 EL GHRQ 0.93 61.3
108102 CM.BINSWIF 0.92 60.8

Siemens PTI Version C – Final Version Page 13 of 17


EETC Transmission Master Plan Project
Appendix

Bus No. Bus Name Zone Voltage [pu] Voltage [kV]


108182 W.ELNIL 0.91 60.1
108116 AHNASEA 0.90 59.5
108318 DIROT 0.90 59.4
5141 DEMO MOBILE 0.88 57.9
108351 WADISH2 0.85 56.4
108301 ABU TEEG 0.85 56.3
6501 DEMO 0.85 55.8
6530 DEMO-2 0.85 55.8
108302 ELGHNAIM 0.84 55.1
6628 SODFA 0.83 55.0
108180 S.WADY CMNT 0.83 54.9
108129 ABO RADY 0.83 54.7
108365 ASSUIT NEW 0.82 54.3
8360 SAHEL SLEEM 0.81 53.7
108355 ELBDARI 0.81 53.3
2
108034 ELBATS 0.80 52.8
108030 QOHAFA 0.80 52.7
108031 QOHAFA2 0.80 52.7
108104 CM.GAYADA 0.79 52.4
108036 KOMOSHEM 0.79 52.0
108120 NASR 0.79 51.8
108122 ELWASTA 0.78 51.7
108364 ABNOB 0.78 51.5
108124 KURIMAT 0.78 51.2
108033 SANORS 0.77 51.0
108106 BEBA 0.77 50.7
108123 D.B.2 0.76 50.4
108121 D.B.1 0.76 50.2
108125 QOSHESHA 0.76 49.9
108112 SAMOSTA 1 0.75 49.8
Optimum Tap Position from PSS®E with Automatic Tap Adjustment
Bus No. Bus Name Zone Voltage [pu] Voltage [kV]
108105 SAMOSTA 2 0.95 62.4
108034 ELBATS 0.93 61.5
108318 DIROT 0.93 61.5
108351 WADISH2 0.93 61.4
108017 EL GHRQ 0.93 61.3
108030 QOHAFA 0.93 61.2
108031 QOHAFA2 0.93 61.2
2
108036 KOMOSHEM 0.92 61.0
108122 ELWASTA 0.92 60.8
108301 ABU TEEG 0.91 60.1
108212 MINIA IN 0.91 60.0
108210 MINIA E. 0.91 59.7
108033 SANORS 0.90 59.7
108116 AHNASEA 0.90 59.5

Siemens PTI Version C – Final Version Page 14 of 17


EETC Transmission Master Plan Project
Appendix

Bus No. Bus Name Zone Voltage [pu] Voltage [kV]


108365 ASSUIT NEW 0.90 59.4
108180 S.WADY CMNT 0.90 59.3
108302 ELGHNAIM 0.89 59.1
6628 SODFA 0.89 58.9
8360 SAHEL SLEEM 0.89 58.9
108355 ELBDARI 0.89 58.7
108104 CM.GAYADA 0.87 57.1
108364 ABNOB 2 0.86 57.0
108120 NASR 0.86 56.6
108124 KURIMAT 0.85 56.1
108106 BEBA 0.84 55.7
108123 D.B.2 0.84 55.3
108121 D.B.1 0.83 55.1
108125 QOSHESHA 0.83 54.9
108112 SAMOSTA 1 0.83 54.9

Siemens PTI Version C – Final Version Page 15 of 17


EETC Transmission Master Plan Project
Appendix

80

70

60

50
Loading [%]

40

30

20

10

0
0 200 400 600 800 1000 1200 1400
Cumulative Circuit Length [km]
EETC2017 - Peak - Auto Tapping

Figure M 5 EETC2017 Peak Model – Line Loading vs. Circuit Length – 132 kV Level – Zone 1 – Auto-
Tapping

100

90

80

70
Loading [%]

60

50

40

30

20

10

0
0 200 400 600 800 1000 1200
Cumulative Circuit Length [km]

EETC2017 - Peak - Auto Tapping

Figure M 6 EETC2017 Peak Model – Line Loading vs. Circuit Length – 132 kV Level – Zone 2 – Auto-
Tapping

Siemens PTI Version C – Final Version Page 16 of 17


EETC Transmission Master Plan Project
Appendix

140

120

100
Loading [%]

80

60

40

20

0
0 500 1000 1500 2000 2500
Cumulative Circuit Length [km]

EETC2017 - Peak - Auto Tapping

Figure M 7 EETC2017 Peak Model – Line Loading vs. Circuit Length – 66 kV Level – Zone 1 – Auto-
Tapping

140

120

100
Loading [%]

80

60

40

20

0
0 500 1000 1500 2000
Cumulative Circuit Length [km]
EETC2017 - Peak - Auto Tapping

Figure M 8 EETC2017 Peak Model – Line Loading vs. Circuit Length – 66 kV Level – Zone 2 – Auto-
Tapping

Siemens PTI Version C – Final Version Page 17 of 17