OE NEW CS RUR NORTH - AHS PUPR 11 Apr 2018 with Qty 6 Jun 2018.xlsx
COMMERCIAL BID SHEET
MAINTENANCE SERVICES OF ROAD AND WATERWAYS DURI
[A] [B] [C] [D] [E] [F] = [C] * [D] * [E] [D] [E] [F] = [C] * [D] * [E]
Total Daily
Hypothetical Total Daily Rate Duration Duration
No Position Total Rate Total
Quantity (IDR/day) (Days) (Days)
(IDR/day)
[A] [B] [C] [D] [E] [F] = [C] * [D] * [E] [D] [E] [F] = [C] * [D] * [E]
[A] [B] [C] [G] = [D] + [E] + [F] [H] [I] = [C] * [G] * [H] [G] = [D] + [E] + [F] [H] [I] = [C] * [G] * [H]
NON REMOTE (IDR/Hour) NON REMOTE (IDR/Hour) NON REMOTE (IDR/Hour) NON REMOTE (IDR/Hour)
Total Total
No Position Work Days Workdays Work Days Workdays Work Days Workdays Work Days Workdays
Overtime Overtime
Working Hours Working > 10 Off Days Working Hours > 8 Working > 10 Off Days Working Hours Working > 10 Off Days Working Hours > 8 Working > 10 Off Days
> 8 ≤ 10 Hours Hours ≤ 10 Hours Hours > 8 ≤ 10 Hours Hours ≤ 10 Hours Hours
V. Overtime
heavy vehicles & construction equipment operator/driver
(Company's equipment) Quote Quote Quote Quote Quote Quote Calculate 64,557,257 43,038,171 158,910,171 76,177,563 50,785,042 187,514,002 580,982,208
Total Daily
Hypothetical Duration Total Daily Rate Duration
No Position Rate Total Total
Quantity (Days) (IDR / Day) (Days)
(IDR / Day)
[A] [B] [C] [D] [E] [F] = [C] * [D] * [E] [D] [E] [F] = [C] * [D] * [E]
II. Hourly Stand By Rate Non Remote
helper 35 Quote 192 Calculate 587,900 192 3,950,688,000
swamper 20 Quote 192 Calculate 610,700 192 2,345,088,000
mason 1 Quote 192 Calculate 820,100 192 157,459,200
materialsman 1 Quote 192 Calculate 820,100 192 157,459,200
pipe fitter 1 Quote 192 Calculate 874,500 192 167,904,000
carpenter 1 Quote 192 Calculate 765,900 192 147,052,800
mechanic 1 Quote 192 Calculate 910,900 192 174,892,800
A technician lab 1 Quote 192 Calculate 910,900 192 174,892,800
rigger 1 Quote 192 Calculate 785,700 192 150,854,400
vehicle driver (Contractor
5 Quote 192 Calculate 678,500 192 651,360,000
equipment)
sr. mason Quote Quote Quote Calculate 148,690,286 99,126,857 183,003,429 430,821,000
sr. materialsman Quote Quote Quote Calculate 74,345,143 49,563,429 91,501,714 215,411,000
sr. pipe fitter Quote Quote Quote Calculate 168,373,029 112,248,686 207,228,343 487,851,000
sr. carpenter Quote Quote Quote Calculate 148,690,286 99,126,857 183,003,429 430,821,000
sr. vehicle driver (Contractor
Quote Quote Quote Calculate 85,069,029 56,712,686 104,700,343 246,483,000
B equipment)
HES man Quote Quote Quote Calculate 137,814,857 91,876,571 169,618,286 399,310,000
C foreman Quote Quote Quote Calculate 4,842,864,000 Quote Quote 4,842,864,000
Sub Total IV Calculate 23,777,930,000
Table B-1.6 Heavy Vehicle and Construction Equipment Service Rate (Rupiah) RC
E COMPACTORS - - -
1 Compactor - Pad/Sheep Foot Construction Equipment 10 Ton 110 HP 6 4800 385,000 3.399 37,693,260,557
2 Smooth Drum/Tire Compactor Construction Equipment 10 Ton 110 HP 6 4800 365,000 3.399 35,735,169,100
3 Mini compactor/Baby Roller Compactor (lebar pemadatan < 1000 95,000 3.413 1,556,519,425
Construction Equipment 1 ton 10 Hp 1 4800
mm)
F GRADERS - - -
1 Motor Grader Construction Equipment Blade width: 12 Feet 125 HP 6 4800 425,000 3.454 42,283,047,181
3 Prime Mover 6X4 & Trailer Flatbed/Lowboy (3 axles) with ramp, 718,000 3.650 12,578,058,806
Heavy Vehicle 60 Ton 390 PS 1 4800
Ramp door equiped with Hydraulic
4 Prime Mover 6X4 & Trailer Flatbed/Lowboy (4 axles) with ramp, 825,000 4.755 18,829,800,000
Heavy Vehicle 75 Ton 460 HP 1 4800
Ramp door equiped with Hydraulic
5 Dump Truck (6x4) Heavy Vehicle 10 m³ 220 PS 9 4800 225,000 3.830 37,228,257,495
6 Dump Truck Tail Gate (6x4) Heavy Vehicle 10 m³ 220 PS 3 4800 320,000 3.830 17,648,951,702
7 Water Tank Truck (6x4) Heavy Vehicle 10,000 L 190 PS 3 4800 365,000 3.679 19,339,068,316
I LIGHT VEHICLE
1 Pickup 4x4, min 2000 cc, Double Cabin c/w RFID, Head rest, Fire Extin Light vehicle 2400 CC 30 4800 183,000 4.165 109,748,906,822
2 Station Wagon, min 2000 cc, c/w RFID, Head rest, Fire Extinguisher, ACLight vehicle 2000 CC 4 4800 158,000 4.333 13,143,976,651
Sub Total I 115 702,221,997,452
E COMPACTORS - - -
1 Compactor - Pad/Sheep Foot Construction Equipment 10 Ton 110 HP 6 1512 385,000 3.399 11,873,377,076
2 Smooth Drum/Tire Compactor Construction Equipment 10 Ton 110 HP 6 1512 365,000 3.399 11,256,578,266
3 Mini compactor/Baby Roller Compactor (lebar pemadatan < 1000 95,000 3.413 490,303,619
Construction Equipment 1 ton 10 Hp 1 1512
mm)
F GRADERS - - -
1 Motor Grader Construction Equipment Blade width: 12 Feet 125 HP 6 1512 425,000 3.454 13,319,159,862
G LIFTING EQUIPMENT - - -
1 Lifting Truck (6x4) complete with Crane Construction Equipment 5 Ton 220 PS 2 1512 327,000 3.830 3,787,354,729
2 Lifting Truck (6x4) complete with Crane Construction Equipment 8 Ton 260 PS 2 1512 406,000 3.778 4,638,758,312
3 Lifting Truck (6x4) Long bed 12M complete with Crane Construction Equipment 12 Ton 260 PS 1 1512 456,000 3.704 2,553,929,877
H TRUCKS -
1 Prime Mover 6X4 & Trailer Flatbed/Hiboy (3 axles) Heavy Vehicle 30 Ton 285 HP 1 1512 493,000 3.713 2,767,396,503
2 Prime Mover 6X4 & Trailer Flatbed/Lowboy (3 axles) Heavy Vehicle 30 Ton 285 HP 1 1512 500,000 3.713 2,806,690,165
3 Prime Mover 6X4 & Trailer Flatbed/Lowboy (3 axles) with ramp, Ramp Heavy Vehicle 60 Ton 390 PS 1 1512 718,000 3.650 3,962,088,524
4 Prime Mover 6X4 & Trailer Flatbed/Lowboy (4 axles) with ramp, Ramp Heavy Vehicle 75 Ton 460 HP 1 1512 825,000 4.755 5,931,387,000
5 Dump Truck (6x4) Heavy Vehicle 10 m³ 220 PS 9 1512 225,000 3.830 11,726,901,111
6 Dump Truck Tail Gate (6x4) Heavy Vehicle 10 m³ 220 PS 3 1512 320,000 3.830 5,559,419,786
7 Water Tank Truck (6x4) Heavy Vehicle 10,000 L 190 PS 3 1512 365,000 3.679 6,091,806,519
I LIGHT VEHICLE
Pickup 4x4, min 2000 cc, Double Cabin c/w RFID, Head rest, Fire
1 Extinguisher, Permanent Tool Box & AC, loose article bag, GPS, Light vehicle 2000 CC 30 1512 183,000 4.165 34,570,905,649
reverse sensor, fuel
2 Station Wagon, min 2000 cc, c/w RFID, Head rest, Fire Extinguisher, 158,000 4.333 4,140,352,645
Light vehicle 2000 CC 4 1512
AC, loose article bag, GPS, reverse sensor, fuel
[A] [B] [C] [D] [F] [G] = [C] * [D] * [F] [D] [F] [G] = [C] * [D] * [F]
I. Daily Compensation Rate for NON REMOTE I. Daily Compensation Rate for NON REMOTE
A Welder Class E 1 Quote 864 Calculate 995,000 864 859,680,000
B Welder Class D 2 Quote 864 Calculate 995,000 864 1,719,360,000
Sub Total I 0.00 Calculate 1,990,000.00 2,579,040,000
RC
Total Hourly Total Hourly Total Hourly
Hypothetical Duration Total Duration Total Duration Total
No Position Rate Rate Rate
Quantity (Hours) Hourly Rate (Hours) Hourly Rate (Hours) Hourly Rate
(IDR / Hour) (IDR / Hour) (IDR / Hour)
[A] [B] [C] [G] = [E] + [F] [H] [I] = [C] * [G] * [H] [G] = [E] + [F] [H] [I] = [C] * [G] * [H] [G] = [E] + [F] [H] [I] = [C] * [G] * [H]
III. Hourly Stand By Rate Non Remote III. Hourly Stand By Rate Non Remote IV. Hourly Stand By Rate Remote
A Welder Class E 1 Quote 96 Calculate 142,143 96 13,645,714 167,729 96 16,101,943
B Welder Class D 1 Quote 96 Calculate 142,143 96 13,645,714 167,729 96 16,101,943
Sub Total III 0.00 Calculate 284,285.71 27,291,429 335,457.14 32,203,886
VI. Overtime
A Welder Class E Quote Quote Quote Quote Quote Quote Calculate 88,697,143 44,348,571 163,748,571 104,662,629 69,775,086 257,631,086 728,863,086
B Welder Class D Quote Quote Quote Quote Quote Quote Calculate 88,697,143 44,348,571 163,748,571 104,662,629 69,775,086 257,631,086 728,863,086
Sub Total V Calculate 1,457,726,171
TOTAL WELDER SERVICES RATE (I + II + III + IV+VI) Calculate 4,064,058,000
Description Unit Hypothetical Quantity Unit Rate (IDR) Duration (Days) Total Service Rate Unit Rate (IDR) Duration (Days) Total Service Rate
Field Survey Crew crew/day 2 Quote 960 Calculate 3,797,600 960 7,291,392,000
[A] [B] [C] [D] [E] [F] = [B] * [C] * [D] * [E] [C] [D] [E] [F] = [B] * [C] * [D] * [E]
Field Survey Crew 2 Quote 0.05 960 Calculate 15,190,400 0.05 960 1,458,278,400
Total Calculate Total 8,749,671,000