COMMERCIAL BID SHEET
MAINTENANCE SERVICES OF ROAD AND WATERWAYS DURI
[A] [B] [C] [D] [E] [F] = [C] * [D] * [E] [D] [E] [F] = [C] * [D] * [E]
Total Daily
Hypothetical Total Daily Rate Duration Duration
No Position Total Rate Total
Quantity (IDR/day) (Days) (Days)
(IDR/day)
[A] [B] [C] [D] [E] [F] = [C] * [D] * [E] [D] [E] [F] = [C] * [D] * [E]
[A] [B] [C] [G] = [D] + [E] + [F] [H] [I] = [C] * [G] * [H] [G] = [D] + [E] + [F] [H] [I] = [C] * [G] * [H] [G] = [D] + [E] + [F] [H] [I] = [C] * [G] * [H]
NON REMOTE (IDR/Hour) NON REMOTE (IDR/Hour) NON REMOTE (IDR/Hour) NON REMOTE (IDR/Hour)
Total Total
No Position Work Days Workdays Work Days Workdays Work Days Workdays Work Days Workdays
Overtime Overtime
Working Hours Working > 10 Off Days Working Hours > 8 Working > 10 Off Days Working Hours Working > 10 Off Days Working Hours > 8 Working > 10 Off Days
> 8 ≤ 10 Hours Hours ≤ 10 Hours Hours > 8 ≤ 10 Hours Hours ≤ 10 Hours Hours
V. Overtime
heavy vehicles & construction equipment operator/driver
(Company's equipment) Quote Quote Quote Quote Quote Quote Calculate 59,600,914 39,733,943 146,709,943 70,329,079 46,886,053 173,117,733 536,377,664
Total Daily
Hypothetical Duration Total Daily Rate Duration
No Position Rate Total Total
Quantity (Days) (IDR / Day) (Days)
(IDR / Day)
[A] [B] [C] [D] [E] [F] = [C] * [D] * [E] [D] [E] [F] = [C] * [D] * [E]
II. Hourly Stand By Rate Non Remote
helper 35 Quote 192 Calculate 651,500 192 4,378,080,000
swamper 20 Quote 192 Calculate 651,500 192 2,501,760,000
mason 1 Quote 192 Calculate 733,000 192 140,736,000
materialsman 1 Quote 192 Calculate 733,000 192 140,736,000
pipe fitter 1 Quote 192 Calculate 772,800 192 148,377,600
carpenter 1 Quote 192 Calculate 703,600 192 135,091,200
mechanic 1 Quote 192 Calculate 792,600 192 152,179,200
A technician lab 1 Quote 192 Calculate 792,600 192 152,179,200
rigger 1 Quote 192 Calculate 725,100 192 139,219,200
vehicle driver (Contractor
5 Quote 192 Calculate 633,200 192 607,872,000
equipment)
sr. mason Quote Quote Quote Calculate 132,912,000 88,608,000 163,584,000 385,104,000
sr. materialsman Quote Quote Quote Calculate 66,456,000 44,304,000 81,792,000 192,552,000
sr. pipe fitter Quote Quote Quote Calculate 143,288,229 95,525,486 176,354,743 415,169,000
sr. carpenter Quote Quote Quote Calculate 132,929,829 88,619,886 163,605,943 385,156,000
sr. vehicle driver (Contractor
Quote Quote Quote Calculate 4,313,712,000 2,875,808,000 5,309,184,000 12,498,704,000
B equipment)
HES man Quote Quote Quote Calculate 260,439,771 173,626,514 320,541,257 754,608,000
C foreman Quote Quote Quote Calculate 3,895,899,429 2,597,266,286 4,794,953,143 11,288,119,000
Sub Total IV Calculate 55,016,563,000
Table B-1.6 Heavy Vehicle and Construction Equipment Service Rate (Rupiah) RC
E COMPACTORS - - -
1 Compactor - Pad/Sheep Foot Construction Equipment 10 Ton 110 HP 6 4800 370,000 3.399 36,224,691,964
2 Smooth Drum/Tire Compactor Construction Equipment 10 Ton 110 HP 6 4800 350,000 3.399 34,266,600,507
3 Mini compactor/Baby Roller Compactor (lebar pemadatan < 1000 95,000 3.413 1,556,519,425
Construction Equipment 1 ton 10 Hp 1 4800
mm)
F GRADERS - - -
1 Motor Grader Construction Equipment Blade width: 12 Feet 125 HP 6 4800 425,000 3.454 42,283,047,181
G LIFTING EQUIPMENT - - -
1 Lifting Truck (6x4) complete with Crane Construction Equipment 5 Ton 220 PS 2 4800 250,000 3.830 9,192,162,345
2 Lifting Truck (6x4) complete with Crane Construction Equipment 8 Ton 260 PS 2 4800 350,000 3.778 12,695,014,537
3 Lifting Truck (6x4) Long bed 12M complete with Crane Construction Equipment 12 Ton 260 PS 1 4800 400,000 3.704 7,112,029,732
H TRUCKS -
1 Prime Mover 6X4 & Trailer Flatbed/Hiboy (3 axles) Heavy Vehicle 30 Ton 285 HP 1 4800 400,000 3.713 7,128,102,007
2 Prime Mover 6X4 & Trailer Flatbed/Lowboy (3 axles) Heavy Vehicle 30 Ton 285 HP 1 4800 450,000 3.713 8,019,114,758
3 Prime Mover 6X4 & Trailer Flatbed/Lowboy (3 axles) with ramp, 450,000 3.650 7,883,184,488
Heavy Vehicle 60 Ton 390 PS 1 4800
Ramp door equiped with Hydraulic
4 Prime Mover 6X4 & Trailer Flatbed/Lowboy (4 axles) with ramp, 825,000 4.755 18,829,800,000
Heavy Vehicle 75 Ton 460 HP 1 4800
Ramp door equiped with Hydraulic
5 Dump Truck (6x4) Heavy Vehicle 10 m³ 220 PS 9 4800 200,000 3.830 33,091,784,440
6 Dump Truck Tail Gate (6x4) Heavy Vehicle 10 m³ 220 PS 3 4800 225,000 3.830 12,409,419,165
7 Water Tank Truck (6x4) Heavy Vehicle 10,000 L 190 PS 3 4800 200,000 3.679 10,596,749,762
I LIGHT VEHICLE
1 Pickup 4x4, min 2000 cc, Double Cabin c/w RFID, Head rest, Fire Extin Light vehicle 2400 CC 30 4800 119,048 4.165 71,395,333,608
2 Station Wagon, min 2000 cc, c/w RFID, Head rest, Fire Extinguisher, ACLight vehicle 2000 CC 4 4800 158,000 4.333 13,143,976,651
Sub Total I 115 519,869,041,128
E COMPACTORS - - -
1 Compactor - Pad/Sheep Foot Construction Equipment 10 Ton 110 HP 6 1512 370,000 3.399 11,410,777,969
2 Smooth Drum/Tire Compactor Construction Equipment 10 Ton 110 HP 6 1512 350,000 3.399 10,793,979,160
3 Mini compactor/Baby Roller Compactor (lebar pemadatan < 1000 95,000 3.413 490,303,619
Construction Equipment 1 ton 10 Hp 1 1512
mm)
F GRADERS - - -
1 Motor Grader Construction Equipment Blade width: 12 Feet 125 HP 6 1512 425,000 3.454 13,319,159,862
G LIFTING EQUIPMENT - - -
1 Lifting Truck (6x4) complete with Crane Construction Equipment 5 Ton 220 PS 2 1512 250,000 3.830 2,895,531,139
2 Lifting Truck (6x4) complete with Crane Construction Equipment 8 Ton 260 PS 2 1512 350,000 3.778 3,998,929,579
3 Lifting Truck (6x4) Long bed 12M complete with Crane Construction Equipment 12 Ton 260 PS 1 1512 400,000 3.704 2,240,289,365
H TRUCKS -
1 Prime Mover 6X4 & Trailer Flatbed/Hiboy (3 axles) Heavy Vehicle 30 Ton 285 HP 1 1512 400,000 3.713 2,245,352,132
2 Prime Mover 6X4 & Trailer Flatbed/Lowboy (3 axles) Heavy Vehicle 30 Ton 285 HP 1 1512 450,000 3.713 2,526,021,149
3 Prime Mover 6X4 & Trailer Flatbed/Lowboy (3 axles) with ramp, Ramp Heavy Vehicle 60 Ton 390 PS 1 1512 450,000 3.650 2,483,203,114
4 Prime Mover 6X4 & Trailer Flatbed/Lowboy (4 axles) with ramp, Ramp Heavy Vehicle 75 Ton 460 HP 1 1512 825,000 4.755 5,931,387,000
5 Dump Truck (6x4) Heavy Vehicle 10 m³ 220 PS 9 1512 200,000 3.830 10,423,912,099
6 Dump Truck Tail Gate (6x4) Heavy Vehicle 10 m³ 220 PS 3 1512 225,000 3.830 3,908,967,037
7 Water Tank Truck (6x4) Heavy Vehicle 10,000 L 190 PS 3 1512 200,000 3.679 3,337,976,175
I LIGHT VEHICLE
Pickup 4x4, min 2000 cc, Double Cabin c/w RFID, Head rest, Fire
1 Extinguisher, Permanent Tool Box & AC, loose article bag, GPS, Light vehicle 2000 CC 30 1512 119,048 4.165 22,489,530,086
reverse sensor, fuel
2 Station Wagon, min 2000 cc, c/w RFID, Head rest, Fire Extinguisher, 158,000 4.333 4,140,352,645
Light vehicle 2000 CC 4 1512
AC, loose article bag, GPS, reverse sensor, fuel
[A] [B] [C] [D] [F] [G] = [C] * [D] * [F] [D] [F] [G] = [C] * [D] * [F]
I. Daily Compensation Rate for NON REMOTE I. Daily Compensation Rate for NON REMOTE
A Welder Class E 1 Quote 864 Calculate 876,000 864 756,864,000
B Welder Class D 2 Quote 864 Calculate 893,000 864 1,543,104,000
Sub Total I 0.00 Calculate 1,769,000.00 2,299,968,000
RC
Total Hourly Total Hourly Total Hourly
Hypothetical Duration Total Duration Total Duration Total
No Position Rate Rate Rate
Quantity (Hours) Hourly Rate (Hours) Hourly Rate (Hours) Hourly Rate
(IDR / Hour) (IDR / Hour) (IDR / Hour)
[A] [B] [C] [G] = [E] + [F] [H] [I] = [C] * [G] * [H] [G] = [E] + [F] [H] [I] = [C] * [G] * [H] [G] = [E] + [F] [H] [I] = [C] * [G] * [H]
III. Hourly Stand By Rate Non Remote III. Hourly Stand By Rate Non Remote IV. Hourly Stand By Rate Remote
A Welder Class E 1 Quote 96 Calculate 125,143 96 12,013,714 147,669 96 14,176,183
B Welder Class D 1 Quote 96 Calculate 127,571 96 12,246,857 150,534 96 14,451,291
Sub Total III 0.00 Calculate 252,714.29 24,260,571 298,202.86 28,627,474
VI. Overtime
A Welder Class E Quote Quote Quote Quote Quote Quote Calculate 78,089,143 52,059,429 192,219,429 92,145,189 61,430,126 226,818,926 702,762,240
B Welder Class D Quote Quote Quote Quote Quote Quote Calculate 53,069,714 53,069,714 195,949,714 93,933,394 62,622,263 231,220,663 689,865,463
Sub Total V Calculate 1,392,627,703
TOTAL WELDER SERVICES RATE (I + II + III + IV+VI) Calculate 3,716,857,000
Description Unit Hypothetical Quantity Unit Rate (IDR) Duration (Days) Total Service Rate Unit Rate (IDR) Duration (Days) Total Service Rate
Field Survey Crew crew/day 2 Quote 960 Calculate 3,910,200 960 7,507,584,000
[A] [B] [C] [D] [E] [F] = [B] * [C] * [D] * [E] [C] [D] [E] [F] = [B] * [C] * [D] * [E]
Field Survey Crew 2 Quote 0.05 960 Calculate 15,640,800 0.05 960 1,501,516,800
Total Calculate Total 9,009,101,000