REQUEST FOR OVERTIME INSPECTION

SUPERVISOR BI/WO #: 10-93103-0019


INSPECTION & QUALITY ASSURANCE SECTION Charge Acct. #: 10-93103-011-050
Room – 10, Bldg. 3106, LIP Dhahran Project Title: Voltage Conversion – Phase III
Tel: 013-862-5236
Inspector: Gopal Prasad Mohanty

Please provide inspection coverage for the above project. Details of required are given below.

INSPECTOR DATE TIME DESCRIPTION


DISCIPLINE INSPECTION APPROXIMATE OF
REQUIRED REQUIRED FROM TO ACTIVITIES

Loop 14, Building 1610, LV Cable


ELECTRICAL Installation, IR continuity Test, Cable
10 April 2024 07:00 AM 04:00 PM termination and torque test, LV Panel
Board Installation, EMT and Flexible
conduit Installation

The Construction Agency has verified that the above items are ready for inspection and work
meets Saudi Aramco and industry standards.

I&QAS will evaluate this request to determine the need for Inspector to be present. If an
Inspector does not show up at the requested time, the Construction Agency PE at their
discretion may proceed with the work activity.

Requesting Organization: ______CSPD____________________________

Requestor’s Name : __________________________________

Signature and Date : __________________________________

Telephone Number : __________________________________

Inspection Authorized by : Date: _____________________

(This form should be signed by the Saudi Aramco Project Engineer and submitted to I&QAS at least
24hours in advance of the required inspection or no later than 11:00 AM on Thursday for the Weekend.)