06 PLI - Form - Inspection Lifting Gear
06 PLI - Form - Inspection Lifting Gear
06 PLI - Form - Inspection Lifting Gear
CHECK ITEMS
YES NO
1 Broken wires
2 Severe localized abrasion or scraping,
3 Kinking, crushing, bird caging, or any other damage to the rope structure,
4 Evidence of heat damage,
5 Crushed, deformed, or worn end attachments,
6 Severe corrosion of the rope, end attachments or fittings,
7 Missing or illegible sling identifications
8 Others
SLEEVE: YES NO
1 Crack or Undercut
3 Others
OVERALL COMMENTS:
Date: Date:
Skedule Inspeksi : Bulanan
PT. PUNJ LLOYD INDONESIA
3 x 18 MW COAL FIRED POWER PLANT PROJECT
CHECK ITEMS
YES NO
OVERALL COMMENTS:
Date: Date:
Location: Skedule Inspeksi : Bulanan
DATA: USER ( Main Contractor / Sub-Contractor ):
1 TYPE SHACKLE Reference No.
2 Shackle Diameter (mm): Inspection Date:
3 Pin Dia (mm): Date of Next Inspection:
4 SWL: Color Code:
CHECK ITEMS
YES NO