PT.

PUNJ LLOYD INDONESIA


3 X 18 MW COAL FIRED POWER PLANT PROJECT

Inspection Form Welding Machine

1. Mesin Skedule Inspeksi : Harian

No. Parts Condition


Good Broken Remarks
01. Check engine oil/Periksa Oli Mesin
02. Check engine oil Filter/Periksa Oli Filter
03. Check fuel filter/Periksa Filter Solar
04. Check air filter/Periksa Filter Udara
05. Check for engine fluid leaks/Periksa Kebocoran
06. Check engine cooling fins for blockage/Periksa Radiator
07. Check fan belt/alternator/Periksa Vanbelt
08. Check for loose pipes, nuts, bolts, wires and all guards/
Periksa pipa, mur, baut, kabel dan pelindung
09. Check condition for all fuel hoses/Periksa selang solar

2. Skid
No. Parts Remarks
Good Broken Remarks
1. Check whether battery electrolyte level and terminal
are clean / mounting clamp (Periksa air aki, kepala aki
dan klemp aki)
2. Check door cabin/Periksa pintu cabin
3. Check door hinges and latch operation
4. Check fuel cap and sealing surface/Periksa penutup
tanki solar
5. Check engine/alternator and radiator rubber mount
condition/Periksa alternator dan kondisi radiator
6. Check emergency stop/Periksa emergency stop
7. Check fuel tank, drain /Periksa tanki solar, saluran
pembuangan
8. Check fuel/Periksa kecukupan solar
9. Check starter /Periksa kunci starter
10. Check switch on/off / Periksa tombol on / off
11. Check connection welding cable/Periksa sambungan
kabel las

3. Approval Inspector :

Checked by Approved by
Date : Date :
Name : Name :

Signature : Signature :