SASEC Highway Enhancement Project (SHEP)

Kakarvitta-Laukahi Road Section


Pile Inspection Sheet
Name of Bridge:
Chainage:
Weather:
Temperature:
Pile:
Time of Boring
Time of Concreting:
Diameter:

File Record
S.No. Description of Works Value
1 Teporary pile case top elevation
2 Temporary pile case length
3 Design pile top elevation
4 Design pile bottom elevation
5 Required depth of bore hole
6 Provided depth of bore hole
7 Required Depth from pile case top to finish concrete level;
8 Provided depth from pile case top to finish concrete level:
9 Bentonite Properties
a Specific Gravity of Bentonite solution before Boring:
b Specific Gravity of Bentonite solution before Concreting:
10 Concrete
a Grade
b Volume of Concrete brought at site
c Slump test
i 1st batch
ii 2nd batch
iii 3rd batch
iv 4th batch
11 Theoretical Depth for given volume of concrete
12 Actual depth at site
13 Plants and Equipment Used
a Rotary Drilling Rig
b Service Crane
c Excavator
d Loader
e Back Hoe
f Transit Mixture
g Tremie Pipe, Hopper, Submersible Pump, Welding Machine
BE ARE
14 Employers Representative

15 COVEC-CREGC-TUNDI JV Representative