Questionare Engmanagement Rich

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

IDENTIFICATION:

1. This term refers to evaluation of alternatives using intuition and subjective judgment.
2. There are instances when engineer managers make decision that will have implications in
the future.
3. This model is constructed to represent reality, on which conclusions about real-life
problems can be used.
4. This environment refers to variables that are outside the organization and not
typically, within the short-run control of top management.
5. A network technique which enables engineer managers to schedule, monitor, and control
large and complex project by employing three time estimates for each activity.

ENUMERATION:
6-12. What are the seven steps to effective decision making?
13-20. Give at least 8 types of quantitative techniques.

You might also like