Daily Report: General Rigging Down
Daily Report: General Rigging Down
Daily Report: General Rigging Down
Report No 5
Date: 25-Oct-22
Rig Name B1 Well Name Type Objective: RIG REFURBISHING Company
Proposed TD FT R.O.P FT Depth FT Total Footge FT Rig Move From: Move To:
BHA:
TON MILE A-SINCE LAST CUT B-Length of Rope Remaining: Safety Meeting:
REPAIRS A-Last 24 Hrs B-Month: TOTAL PERSONNELS 7 SET CARD TRIC CARD
From To OPERATION
0600 DISCONNECT POWER CABLE OF DROWWRKS AND SECURE
RIG DOWN TRIP TANK
REMOVE ALL HANDRAILS OF RIG FLOOR
REMOVE AIR LINE ON RIG FLOOR
1800 CONT PREPAIR PIPE BOX FOR RIG MOVE
140 Wt.: 0 90 Wt.: 0 50/20 Wt.: 0 46 Wt.: LTR 40 Wt.: LTR 37 Wt.: 0 10 Wt.: 0