Annex A. High Level Drawing of Conveyor System

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Paras will follow 11m

38m
the same design 17m

principles as
Kepanjen
88m

120m

80m Legends
47m Tipping area
80m
Sorting and residual Conveyor
55m Baling area
40m Bale storage
Residual (or loading )
100m
area
34m
For compost
20m
74m Current waste bank
41m
Office buildings
Weighbridge
Windrow composting

© 2021 Alliance to End Plastic Waste 1

You might also like