4014 P20040-LCAL-CNCEQ-0002 Additional Temporary Sheet Piling Due To Existing KGB Scaffolds Towers Re Candaba 3rd Viaduct Project - From Leighton Contractors (ASIA) Limited Phi
Rennie cvpfpm) arou/9072
Te MA Wa PS U]-1 aes
APPROVAL REQUE
NLEX SRD
Project Te: ‘Candaba Srd Viaduct Project Ref. No, PZO040-PMSAR-OO2
Contractor: ‘eighton Contractor's Asia) Limited Philippine Branch Dste: Moy 17,2023
Pay heme “Temporary Diversion of Waterway PayliemNow B17
Plant/ Materia?
Equipment [RCPC 910mm & 120mm Class
Description:
Intended Use eal
Reference Bask
Specification: Fonemner ‘a Product Data/ Certificates
‘samples
sone pipes Concrete Corpora ‘aTest/ Mill Reports
sourcersuppier: —_"™ me oe
‘tachment WaR, Test Report cAcwualitem
(Others: Tick-Test Mill Reports
PRINTED NAME ‘POSTION ‘COMPANY
Recommended &
Reviewed by “anthony Horario Construction Manager bo
SS
Design & Engineering Y
(huis Carrot Manager ec
Validated by, SC*RaandoTommang—— [AC Manager CA
ea
Anproved by: Franck Prams Deputy Project Manager CAL
Commie NoRConGULT PLEX 4
The Sobmisionreturnedas | Notes: Tet
indicated below aecrialh:
‘i The matevials met the a}.
cepted emi ea aes.
{Accepted as noted requived Specification fov & | —S——r=
{Revise and resubmit as A ef
noted Class Ty RCPC va Rl coawnen —
(Rejected as noted ee ei
pants
tS ae V7
Reviewed By: a. ‘Signed by: RAMOS,
Tae: ONC | MANAGER ‘Tite:
Date:
‘QAC-FO01/RO1/16 September 2019
focused OA
pa
tig ivy eSRECEIVING COPY
NLEX SESE
Lelghton Contractors (Asta) Limited
Samomaermmraasoy Philippe Branch
Project Title Candaba 3rd Viaduct Project WIRNo._[00725
Contractor: Leighton Contractor's (Asia) Limited — Philippine Branch
‘Construction Process: | Embankment / Access Earthworks
Location: Zone 1 RCP Laying Locations
Requested Date, Time:_ | Apr. 20, 2023, 10:00 AM
Pay item No. Pay item Description:
DETAILS OF WORK TO BE ONE:
Dalivery Inspection of RC Pipes for river] Wigation laying
FRANCIS PRAMS
‘Sipe Above Psd Name “Snags Above Peta Nae
Connors Dopty Prost Manezorbesanaiad ICs Renresertatve
‘TO BE MARKED WITH ACTUAL DATE OF COMPLETION AND TO BE ATTACHED TO APPROPRIATE REPORT
POMS BN (CMT-FO02/RO1/16 September 2019NLEX BE EES
CORPORATION elton Conracer (At) Lied
‘enoncrevamcame Philippine Branch
(CMT-FO01/R01/16 September 2019RECEIVING COPY
NLEX LEIGHTON MM work INSPECTION REQUEST
Lelgiton Contactors (Asta) Limitec
Candaba 3rd Viaduct Project WIR No._| 00730
Leighton Contractors (Asia) Limited — Philippine Branch
‘Material Pre-Qualification
Parpipes - PRECOM LTO Compound, Gov. Halll Ave. Bagbaguin Sta. Maria, Bulacan
May 5, 2023, 10:00 AN
Pay liem No. Pay Item Description: RC Pipes
DETAILS OF WORK TO BE DONE: aaa Z a
“Testing of concrote pipes for Irigation canals.
‘Notes: 1 Won‘ sha proceed past ie above Wor inspection reqvet (WR) ules Be Contact i ineete etree
_2).ons associa mi ts WIR wi be checked by Cantactrs tat rte he equestdngpacton tn oer tat wrk an
ecoaance wine npproved arngs on ier
Approved by:
Acived hyp? 1
t)r/9d ass am ‘CMT-F001/R01/16 September 2019S400 = RO 60. is
a. 3 fms ~ re apes
os 1A pep Ec. “
ay Poerian e
J
med ok | ess] 55 a 6B], GOI joopsel] oct | S001 | Orel | @ mum al vm “aoa paw
a oe ° o [it | eal 1 [colsb| col | oir | Ol | a Mem Mf SS¥D 1 a4 PuNDOL
‘woo | 2209 | Bem | tem | 0m | reo, pey | 8 | pez | emmy | pony ama
ephenny [2288S | atrmay Lea | At | [rv eo, [Pree | ms ter en ea Nolidiaosad
® wosa3s2ad oeri aaa ac
Beaee' (aHtal “WLOL IVA
esas He (atta) “WLoL Taxa IVA
eiscewe woz | eoiee
oseizeur's woz | wrse's
(entenoxa) Tonisniaxa)
eoudpepuepa | %i1vA | eoud NUN
ut woo vous Duoqeoy cue ews,
uous woo ooyessoouseoupuEUpeS yeua
BUYS "HOHEON owen eg
fa posiey PO 2298 Lev 1160 sued bo-si8e oor :onusoes
“aude
O¥LSV9 ONVNIGUSS yeWwoD a
ed souddiind ‘veot S19 SinBey “AD
vonusny s091z01 TON 2e1Kddng ——_eqojo ojeeyjuog ag puze ‘samo COUR AZ OWN
9002 SANIddlIHd
honemanermrnae ieee eset VONVdiNWd
OVHOd DIsvd SAVEINV,
lene aed Cue VEVONYD 1 see NOLLVYOdNOD SUFYONOD SAdiduvd OL
000 wo1ss0, dO - 6128122 ‘ON J0pIO eseyound ezivores eeaON / 80, zpouDene are (| xeUUY) suOrFNNSU [0945
dO 6128122 ON J9pi9 eseysind 105 suopaninsuy je;oods
evn Some ppt Oper tpn gaia mena hanes he mea mB Ae i
‘suo}|puog pur sue) spi eseysing
PeuwWH (vIS¥) S10}9eNUOD UO}YB}O7,LEIGHTON CONTRACTORS (ASIA) LIMITED
12F Unk D Menaro Tower, 320 Steet
ThNO coseenats OY Purchase Order No. 7218219
“elophane No: (22) 96-6400
Fac No: (632) 423-0437
ANNEX 1
‘SPECIAL INSTRUCTIONS
‘+ Terme and Conditions Attached
+ Forinvolce& Offical Receipt, pease indicat:
Company: LEIGHTON CONTRACTORS (ASIA) LIMITED
TINNe. e052 946
Aadroce: UnitD 12° Menarco Tower, S2nd St Benifeclo Global Clty
‘Pllppines
Taguig Oty 1694,
‘Business Style: Leighton Contractors (Asia) United
invole and Delivery Recelots must be submited to:
company LEIGHTON CONTRACTORS (ASIA) LIMITED
‘81 Floor Annex Bulting, 2229 Alegria Building, Chino Roces Avenue, Makati Cty
Ate 1 state PO number and Pro
Payment Term: 90 days upon delivery and receipt of Ivces.
Note:
410. Piase send us back immodistly 2 copy of elgned ANNEX 1,
20 For dolvery, please contact Mr. Bere Onuy (0902 297 2918).
are:
‘CONFORME:
Brit Name & Sgnatie of Atioraed RopressntaiveOL LSY Uo pane LORERIEOMS /26-WLBY -IWUSY WU as
Coe
cdaailaeil
daca bares en
"3 3S
& WO D32IdNLEX BEECH
Leighton Contractors (Asia) Limited
To: The Contractor
Philippine Granch
Project Tite: Candaba 3rd Viaduct Project Ref. Ho. P2O08O-FMEAR-OTS
eer Toighton Contractors (Asia) Limited - Philippine Branch Date: May 17, 2023,
fer ise Rinne rn Pay item No 400,
Plant/ Material/ oo z
Equipment Epoxy Paint
Description:
one Bored Pile rebar spacer protection
Reference | Basis
Spectfication: SP.400 [Product 02ta/ certificates
‘Samples
‘rand &
Deen ‘0 Test/ Mill Reports
Source/Supplir: ‘Oo Mock-ups
—— Product Data Sheet —
‘Others:
PRINTED NAME ‘BOSITION COMPANY SIGNATURE, DATE
Recommended &
Reviewed by: “Anthony Horario Construction Manager
Design & Engineering
Chris Carrot Manager
Validated by Rolando Tumang ‘GA/GC Manager
‘Approved by: ———~SC*rancs Prammis ‘Deputy Project Manager TAL
| The Submission is returned as | Notes:
Indicated below:
hecapes
‘Accepted as noted
‘Revise and resubmit as
noted
‘Rejected as noted
ty
‘Signed by: RAMOS
=
‘QAC-FO01/RO1/16 September 2019BOYSEN® Epoxy Primer
Tevet
EIT LORS zy y
SS -DESCRIPTION: BOYSEN® Epoxy Primer is a high quality, two-component, epoxy-polyamide system that
has exceptional adhesion to practically any surface including stee! tanks, coastal installations, galvanized
iron, pipelines, aluminum, structural steel, etc. It has excellent corrosion resistance and sealing
properties. Itis also highly alkali-resistant so there is no need to neutralize new concrete.
B-2202 serves as a Curing Agent designed to be compounded with Epoxy Primer.
PRINCIPAL USES: It is a durable primer for metal, wood, and concrete substrates.
DRY TIME:
Touch: 2 - 3 hours
Recoat: 8 - 12 hours
THEORETICAL COVERAGE PER 4-LITERS: 20 - 25 sq.m,
*Depending on surface texture and porosity
TINTING: Not applicable
THINNING SOLVENT: If applied by brush or roller, the ideal dilution mixture is 1- Liter of
BOYSEN® Epoxy Reducer B-55 for every 4-Liters of paint. Maximum of 1:1 mixture for concrete floor
priming. |
CLEAN-UP SOLVENT: BOYSEN® Epoxy Reducer B-55
PACKAGING:
-Liters (B-2202 Curing Agent for Epoxy Primer is available in 1- Liter cans)
APPLICATION: By brush or spray
AVAILABLE COLORS:
18-2200 White with Curing Agent 8-202
18.2230 Gray with Curing Agent 8:2202
B.227T Red Oxide wah Curing Agent 2202‘SURFACE PREPARATION:
Concrete Flooring
Allow new concrete to dry for 14 - 28 days under normal weather conditions before painting. Remove oil
and grease by using detergents or degreasers. Painting over a roughened concrete floor is
recommended to improve adhesion of succeeding coats.
Metal Surfaces
Wipe the surface with a rag soaked in paint thinner to remove grease, oll, wax and other foreign matter.
For new galvanized surfaces, etch the surface by applying 10% BOYSEN® Metal Etching Solution B-71
(Dilute 1 part of B-71 to 9 parts water). Rinse with water and dry immediately.
Unpainted galvanized surfaces that have been exposed for 6 months or more need not be etched.
Treat rusted steel by sanding and wire brushing. Use BOYSEN® Metal Etching Solution B-71 on
remaining rust. Let it stay for 10 - 15 minutes. Be sure to remove all remaining residue. Immediately
prime after drying.
Wooden Surfaces |
Surface to be painted should be clean and dry, free from dust, dirt, and other foreign matter. Hammer all
nails deep enough to apply put. Sand rough wood until smooth and then dust off tore painting.
For repainting, scrape off all loose, scaling, flaking, and peeling paint as necessary. Make sure surface is
clean, dry, and good weather persists prior to painting. Prime with BOYSEN® Flatwall Enamel B-800
before recoating. |
PAINTING SCHEDULE:
Concrete Flooring
Mix 3 parts of BOYSEN® Epoxy Primer White B-2200 to 1 part ofits catalyst (Pot life: 5 hours). Allow 20
minutes induction time. Thin 1:1 with Epoxy Reducor B-55. Apply as primer coating on bare concrete
floors. Let dry ovemight.
NOTE: Foot traffic abrasion resistance fully develops after 3 days of curing. The paint will reach full
hardness after 7 days of drying, |
Metal
Prime bare metal with BOYSEN® Epoxy Primer Red Oxide B-2277 or BOYSEN® Epoxy Primer Gray B-
2230. Let dry 8 hours to overnight.
Water Tank (Interior)
Prime bare substrate with BOYSEN® Epoxy Primer White B-2200. Let dry 8 hours to overnight. Topcoat
with 2 to 3 coats of BOYSEN® Epoxy Enamel White B-2100. Let dry overnight before recoating. Curing is
strictly 7 days prior to use of tank.
Application of topcoat should be done within 7 days after priming to ensure good intercoat adhesion,
otherwise re- application of primer is needed.
Wooden Surfaces
Prime wooden substrate with BOYSEN® Epoxy Primer White B-2200 or BOYSEN® Epoxy Primer Gray B-
2230. Let dry 8 hours to overnight.
Company Information
Products
4014 P20040-LCAL-CNCEQ-0002 Additional Temporary Sheet Piling Due To Existing KGB Scaffolds Towers Re Candaba 3rd Viaduct Project - From Leighton Contractors (ASIA) Limited Phi