0022

You might also like

Download as pdf
Download as pdf
You are on page 1of 13
Rennie cvpfpm) arou/9072 Te MA Wa PS U]-1 aes APPROVAL REQUE NLEX SRD Project Te: ‘Candaba Srd Viaduct Project Ref. No, PZO040-PMSAR-OO2 Contractor: ‘eighton Contractor's Asia) Limited Philippine Branch Dste: Moy 17,2023 Pay heme “Temporary Diversion of Waterway PayliemNow B17 Plant/ Materia? Equipment [RCPC 910mm & 120mm Class Description: Intended Use eal Reference Bask Specification: Fonemner ‘a Product Data/ Certificates ‘samples sone pipes Concrete Corpora ‘aTest/ Mill Reports sourcersuppier: —_"™ me oe ‘tachment WaR, Test Report cAcwualitem (Others: Tick-Test Mill Reports PRINTED NAME ‘POSTION ‘COMPANY Recommended & Reviewed by “anthony Horario Construction Manager bo SS Design & Engineering Y (huis Carrot Manager ec Validated by, SC*RaandoTommang—— [AC Manager CA ea Anproved by: Franck Prams Deputy Project Manager CAL Commie NoRConGULT PLEX 4 The Sobmisionreturnedas | Notes: Tet indicated below aecrialh: ‘i The matevials met the a}. cepted emi ea aes. {Accepted as noted requived Specification fov & | —S——r= {Revise and resubmit as A ef noted Class Ty RCPC va Rl coawnen — (Rejected as noted ee ei pants tS ae V7 Reviewed By: a. ‘Signed by: RAMOS, Tae: ONC | MANAGER ‘Tite: Date: ‘QAC-FO01/RO1/16 September 2019 focused OA pa tig ivy eS RECEIVING COPY NLEX SESE Lelghton Contractors (Asta) Limited Samomaermmraasoy Philippe Branch Project Title Candaba 3rd Viaduct Project WIRNo._[00725 Contractor: Leighton Contractor's (Asia) Limited — Philippine Branch ‘Construction Process: | Embankment / Access Earthworks Location: Zone 1 RCP Laying Locations Requested Date, Time:_ | Apr. 20, 2023, 10:00 AM Pay item No. Pay item Description: DETAILS OF WORK TO BE ONE: Dalivery Inspection of RC Pipes for river] Wigation laying FRANCIS PRAMS ‘Sipe Above Psd Name “Snags Above Peta Nae Connors Dopty Prost Manezorbesanaiad ICs Renresertatve ‘TO BE MARKED WITH ACTUAL DATE OF COMPLETION AND TO BE ATTACHED TO APPROPRIATE REPORT POMS BN (CMT-FO02/RO1/16 September 2019 NLEX BE EES CORPORATION elton Conracer (At) Lied ‘enoncrevamcame Philippine Branch (CMT-FO01/R01/16 September 2019 RECEIVING COPY NLEX LEIGHTON MM work INSPECTION REQUEST Lelgiton Contactors (Asta) Limitec Candaba 3rd Viaduct Project WIR No._| 00730 Leighton Contractors (Asia) Limited — Philippine Branch ‘Material Pre-Qualification Parpipes - PRECOM LTO Compound, Gov. Halll Ave. Bagbaguin Sta. Maria, Bulacan May 5, 2023, 10:00 AN Pay liem No. Pay Item Description: RC Pipes DETAILS OF WORK TO BE DONE: aaa Z a “Testing of concrote pipes for Irigation canals. ‘Notes: 1 Won‘ sha proceed past ie above Wor inspection reqvet (WR) ules Be Contact i ineete etree _2).ons associa mi ts WIR wi be checked by Cantactrs tat rte he equestdngpacton tn oer tat wrk an ecoaance wine npproved arngs on ier Approved by: Acived hyp? 1 t)r/9d ass am ‘CMT-F001/R01/16 September 2019 S400 = RO 60. is a. 3 fms ~ re apes os 1A pep Ec. “ ay Poerian e J med ok | ess] 55 a 6B], GOI joopsel] oct | S001 | Orel | @ mum al vm “aoa paw a oe ° o [it | eal 1 [colsb| col | oir | Ol | a Mem Mf SS¥D 1 a4 PuNDOL ‘woo | 2209 | Bem | tem | 0m | reo, pey | 8 | pez | emmy | pony ama ephenny [2288S | atrmay Lea | At | [rv eo, [Pree | ms ter en ea Nolidiaosad ® wosa3s2ad oer i aaa ac Beaee' (aHtal “WLOL IVA esas He (atta) “WLoL Taxa IVA eiscewe woz | eoiee oseizeur's woz | wrse's (entenoxa) Tonisniaxa) eoudpepuepa | %i1vA | eoud NUN ut woo vous Duoqeoy cue ews, uous woo ooyessoouseoupuEUpeS yeua BUYS "HOHEON owen eg fa posiey PO 2298 Lev 1160 sued bo-si8e oor :onusoes “aude O¥LSV9 ONVNIGUSS yeWwoD a ed souddiind ‘veot S19 SinBey “AD vonusny s091z01 TON 2e1Kddng ——_eqojo ojeeyjuog ag puze ‘samo COUR AZ OWN 9002 SANIddlIHd honemanermrnae ieee eset VONVdiNWd OVHOd DIsvd SAVEINV, lene aed Cue VEVONYD 1 see NOLLVYOdNOD SUFYONOD SAdiduvd OL 000 wo1ss0, dO - 6128122 ‘ON J0pIO eseyound ezivores eea ON / 80, zpouDene are (| xeUUY) suOrFNNSU [0945 dO 6128122 ON J9pi9 eseysind 105 suopaninsuy je;oods evn Some ppt Oper tpn gaia mena hanes he mea mB Ae i ‘suo}|puog pur sue) spi eseysing PeuwWH (vIS¥) S10}9eNUOD UO}YB}O7, LEIGHTON CONTRACTORS (ASIA) LIMITED 12F Unk D Menaro Tower, 320 Steet ThNO coseenats OY Purchase Order No. 7218219 “elophane No: (22) 96-6400 Fac No: (632) 423-0437 ANNEX 1 ‘SPECIAL INSTRUCTIONS ‘+ Terme and Conditions Attached + Forinvolce& Offical Receipt, pease indicat: Company: LEIGHTON CONTRACTORS (ASIA) LIMITED TINNe. e052 946 Aadroce: UnitD 12° Menarco Tower, S2nd St Benifeclo Global Clty ‘Pllppines Taguig Oty 1694, ‘Business Style: Leighton Contractors (Asia) United invole and Delivery Recelots must be submited to: company LEIGHTON CONTRACTORS (ASIA) LIMITED ‘81 Floor Annex Bulting, 2229 Alegria Building, Chino Roces Avenue, Makati Cty Ate 1 state PO number and Pro Payment Term: 90 days upon delivery and receipt of Ivces. Note: 410. Piase send us back immodistly 2 copy of elgned ANNEX 1, 20 For dolvery, please contact Mr. Bere Onuy (0902 297 2918). are: ‘CONFORME: Brit Name & Sgnatie of Atioraed Ropressntaive OL LSY Uo pane LORERIEOMS /26-WLBY -IWUSY WU as Coe cdaailaeil daca bares en "3 3S & WO D32Id NLEX BEECH Leighton Contractors (Asia) Limited To: The Contractor Philippine Granch Project Tite: Candaba 3rd Viaduct Project Ref. Ho. P2O08O-FMEAR-OTS eer Toighton Contractors (Asia) Limited - Philippine Branch Date: May 17, 2023, fer ise Rinne rn Pay item No 400, Plant/ Material/ oo z Equipment Epoxy Paint Description: one Bored Pile rebar spacer protection Reference | Basis Spectfication: SP.400 [Product 02ta/ certificates ‘Samples ‘rand & Deen ‘0 Test/ Mill Reports Source/Supplir: ‘Oo Mock-ups —— Product Data Sheet — ‘Others: PRINTED NAME ‘BOSITION COMPANY SIGNATURE, DATE Recommended & Reviewed by: “Anthony Horario Construction Manager Design & Engineering Chris Carrot Manager Validated by Rolando Tumang ‘GA/GC Manager ‘Approved by: ———~SC*rancs Prammis ‘Deputy Project Manager TAL | The Submission is returned as | Notes: Indicated below: hecapes ‘Accepted as noted ‘Revise and resubmit as noted ‘Rejected as noted ty ‘Signed by: RAMOS = ‘QAC-FO01/RO1/16 September 2019 BOYSEN® Epoxy Primer Tevet EIT LORS zy y SS - DESCRIPTION: BOYSEN® Epoxy Primer is a high quality, two-component, epoxy-polyamide system that has exceptional adhesion to practically any surface including stee! tanks, coastal installations, galvanized iron, pipelines, aluminum, structural steel, etc. It has excellent corrosion resistance and sealing properties. Itis also highly alkali-resistant so there is no need to neutralize new concrete. B-2202 serves as a Curing Agent designed to be compounded with Epoxy Primer. PRINCIPAL USES: It is a durable primer for metal, wood, and concrete substrates. DRY TIME: Touch: 2 - 3 hours Recoat: 8 - 12 hours THEORETICAL COVERAGE PER 4-LITERS: 20 - 25 sq.m, *Depending on surface texture and porosity TINTING: Not applicable THINNING SOLVENT: If applied by brush or roller, the ideal dilution mixture is 1- Liter of BOYSEN® Epoxy Reducer B-55 for every 4-Liters of paint. Maximum of 1:1 mixture for concrete floor priming. | CLEAN-UP SOLVENT: BOYSEN® Epoxy Reducer B-55 PACKAGING: -Liters (B-2202 Curing Agent for Epoxy Primer is available in 1- Liter cans) APPLICATION: By brush or spray AVAILABLE COLORS: 18-2200 White with Curing Agent 8-202 18.2230 Gray with Curing Agent 8:2202 B.227T Red Oxide wah Curing Agent 2202 ‘SURFACE PREPARATION: Concrete Flooring Allow new concrete to dry for 14 - 28 days under normal weather conditions before painting. Remove oil and grease by using detergents or degreasers. Painting over a roughened concrete floor is recommended to improve adhesion of succeeding coats. Metal Surfaces Wipe the surface with a rag soaked in paint thinner to remove grease, oll, wax and other foreign matter. For new galvanized surfaces, etch the surface by applying 10% BOYSEN® Metal Etching Solution B-71 (Dilute 1 part of B-71 to 9 parts water). Rinse with water and dry immediately. Unpainted galvanized surfaces that have been exposed for 6 months or more need not be etched. Treat rusted steel by sanding and wire brushing. Use BOYSEN® Metal Etching Solution B-71 on remaining rust. Let it stay for 10 - 15 minutes. Be sure to remove all remaining residue. Immediately prime after drying. Wooden Surfaces | Surface to be painted should be clean and dry, free from dust, dirt, and other foreign matter. Hammer all nails deep enough to apply put. Sand rough wood until smooth and then dust off tore painting. For repainting, scrape off all loose, scaling, flaking, and peeling paint as necessary. Make sure surface is clean, dry, and good weather persists prior to painting. Prime with BOYSEN® Flatwall Enamel B-800 before recoating. | PAINTING SCHEDULE: Concrete Flooring Mix 3 parts of BOYSEN® Epoxy Primer White B-2200 to 1 part ofits catalyst (Pot life: 5 hours). Allow 20 minutes induction time. Thin 1:1 with Epoxy Reducor B-55. Apply as primer coating on bare concrete floors. Let dry ovemight. NOTE: Foot traffic abrasion resistance fully develops after 3 days of curing. The paint will reach full hardness after 7 days of drying, | Metal Prime bare metal with BOYSEN® Epoxy Primer Red Oxide B-2277 or BOYSEN® Epoxy Primer Gray B- 2230. Let dry 8 hours to overnight. Water Tank (Interior) Prime bare substrate with BOYSEN® Epoxy Primer White B-2200. Let dry 8 hours to overnight. Topcoat with 2 to 3 coats of BOYSEN® Epoxy Enamel White B-2100. Let dry overnight before recoating. Curing is strictly 7 days prior to use of tank. Application of topcoat should be done within 7 days after priming to ensure good intercoat adhesion, otherwise re- application of primer is needed. Wooden Surfaces Prime wooden substrate with BOYSEN® Epoxy Primer White B-2200 or BOYSEN® Epoxy Primer Gray B- 2230. Let dry 8 hours to overnight. Company Information Products

You might also like