Professional Documents
Culture Documents
Project Design By: 3.uplift Check
Project Design By: 3.uplift Check
Project Design By: 3.uplift Check
3.UPLIFT CHECK
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
Design of Wall W5
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
4.5) Design of W5
The Geometry properties of W5 Wall
The Thickness of Wall W5 is 700mm .
Crack width check is performed for water face i.e. Moment at inward, outward of tank wall.
Wall elements W5 are highlighted as given below
Orientation of STAAD model
Y axis is upward side
SERVICE CONDITION
Summary of Bending moments (Group No. shaft)
Shear Membrane Bending Moment
SQX SQY SX SY SXY Mx My Mxy
Plate L/C
(local) (local) (local) (local) (local) kNm/m kNm/m kNm/m
Max Qx 11094 104 DL+WET SOIL
414.60 32.00 -283.90 -210.20 -111.30 -130.85 -7.78 11.06
Min Qx 11122 104 DL+WET -423.40
SOIL 34.10 -253.20 -182.90 127.20 -139.88 -11.06 -11.43
Max Qy 11920 162 DL+HL(1-CHANNEL,
66.30 204.70
WW EMPTY))-MWL+WET
-67.80 -82.90 -51.00
SOIL -23.78 7.06 -25.09
Min Qy 10592 155 DL+LL+HL(20.00
CHANNELS,WW
-568.30 -98.10
EMPTY-571.70
& ALL OTHERS
-10.70 FULL)-MWL+WET
-17.17 -156.82
SOIL -0.87
Max Sx 11922 193 DL + LL + -14.30
HL(1 CHANNEL
-8.60 EMPTY
139.50& ALL
1.40
OTHERS
15.70
FULL)-MWL
7.80 -1.32 -2.60
Min Sx 11008 162 DL+HL(1-CHANNEL,
406.40 51.60
WW EMPTY))-MWL+WET
-287.60 -210.40 -127.80
SOIL -120.70 -5.48 22.67
Max Sy 11914 181 1.0*(DL + HL(1
-5.60CHANNEL
0.00 EMPTY
98.50& ALL
10.30
OTHERS
-2.50
FULL)-MWL
3.32+ WL (+Z))
-0.03 0.23
Min Sy 10593 151 DL+LL+HL(FULL)-MWL+WET
10.90 -562.90 -98.10
SOIL -583.5 14.90 -17.30 -156.96 -7.66
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
Maximum Moments of W5
X-DIRECTION (Horz.) Y-DIRECTION (Vert.)
Design for Bending moment Out side Inside Out side Inside
MX MX MY MY
Extra Bars location 1.8m @bottom 1.8m @bottom 1.8m @bottom 1.8m @bottom
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
x=(sqrt((m.Ast)2 + 2xmAst)-mxAst)xd
Maximum
% of steel Ʈc from Table 19
Shear Check shear Check
provided of IS 456-2000
stress, Ʈv
Distance From the Point Considered to the Surface of Nearest Longitudinal bar
Applied Service Axial Force, T 0.00 KN
Moduli of Elasticity of Concrete " Ec " = 5000x ( sqrt(fcu) ) = 27.39 KN/mm2
Moduli of Elasticity of Steel " Es " = 200.00 KN/mm2
Modular Ratio " a " = (Es/Ec) = 7.30
r = As/bd = 0.00593
a.r = 0.04
Depth of Neutral Axis, " X " = d.a.r(((1+(2/a.r))^0.5)-1) = 134.68 mm
Lever arm " Z " = ( d - X/3) = 485.11 mm
Reinforcement Stress " fs " = Ms/(As*Z)+((Tx0.5)/As) = 104.46 N/mm2
Concrete Stress " fc " = (fs*As)/(0.5*b*X) = 4.87 N/mm2
"e1 " Strain at Soffit of Concrete Slab = (fs/Es)*(h-X)/(d-X) = 0.00061
"e1 " = (fs/Es)*(h-X)/(d-X)
em = e1 - e2 = 0.00018 mm
Design of Wall
W2
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment
Plants and Intermediate Sewage Pumping Stations with
Design
Project Operation & Maintenance thereof for Seven Years [Works VM
by
- A] and Procurement and Construction of Main Sewers
including Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Checked
Doc. Title VM
Screen, Wet Well, Pumping Station & Flowmeter chamber by
Apprd.
KBR-AIPPL- Doc. No. BWSSP III/27/DAS/ISPS/HER/CV/CL/4001 R0 AMG
by
JV
4.2) Design of W2
The Geometry properties of W2 Wall
The Thickness of Wall W2 is 400mm .
Crack width check is performed for water face i.e. Moment at inward, outward of tank wall.
Wall elements W2 are highlighted as given below
Orientation of STAAD model
Y axis is upward side
SERVICE CONDITION
Summary of Bending moments (Group No.801)
Shear Membrane Bending Moment
SQX SQY SX SY SXY
Mx My Mxy
Plate L/C (local) (local) (local) (local) (local)
kNm/m kNm/m kNm/m
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
Max Qx 14450 180 1.0*(DL +0.200
HL(1 CHANNEL
0.000 0.100
EMPTY0.000
& ALL OTHERS
0.000 FULL)-MWL
7.269 0.301
+ WL (-X))
7.044
Min Qx 14447 180 1.0*(DL +
-0.100
HL(1 CHANNEL
0.100 0.100
EMPTY0.000
& ALL OTHERS
0.000 -6.532
FULL)-MWL2.874
+ WL (-X))
-3.024
Max Qy 14448 180 1.0*(DL +0.100
HL(1 CHANNEL
0.100 0.100
EMPTY0.000
& ALL OTHERS
0.000 -11.918
FULL)-MWL1.940
+ WL (-X))
4.183
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment
Plants and Intermediate Sewage Pumping Stations with
Design
Project Operation & Maintenance thereof for Seven Years [Works VM
by
- A] and Procurement and Construction of Main Sewers
including Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Checked
Doc. Title VM
Screen, Wet Well, Pumping Station & Flowmeter chamber by
Apprd.
KBR-AIPPL- Doc. No. BWSSP III/27/DAS/ISPS/HER/CV/CL/4001 R0 AMG
by
JV
Min Qy 14451 153 DL+LL+HL(1
0.100
CHANNEL
-0.100 EMPTY
0.300 &0.100
ALL OTHERS
0.200 FULL)-MWL+WET
26.159 -1.491SOIL5.641
Max Sx 14452 153 DL+LL+HL(1
-0.100
CHANNEL
-0.100 EMPTY
0.400 &0.100
ALL OTHERS
0.100 FULL)-MWL+WET
23.334 -2.873SOIL
-2.290
Min Sx 14447 162 DL+HL(1-CHANNEL,
0.100 0.000
WW-0.300
EMPTY))-MWL+WET
-0.100 0.100SOIL6.156 -0.985 3.690
Max Sy 13494 162 DL+HL(1-CHANNEL,
0.000 0.000
WW0.000
EMPTY))-MWL+WET
0.300 0.100SOIL
-0.709 -3.285 -0.732
Min Sy 13501 193 DL + LL +0.000
HL(1 CHANNEL
0.000 0.000
EMPTY
-0.400
& ALL OTHERS
0.100 -0.578
FULL)-MWL
-1.763 -0.829
Max Sxy 13485 154 DL+LL+HL(INLET,OUTLET
0.000 0.000 0.100
EMPTY
-0.100
& ALL OTHERS
0.300 -0.774
FULL)-MWL+WET
-5.797 SOIL
-1.132
Min Sxy 13505 162 DL+HL(1-CHANNEL,
0.000 0.000
WW0.100
EMPTY))-MWL+WET
0.000 -0.200SOIL
-0.408 -0.849 0.137
Max Mx 14451 153 DL+LL+HL(1
0.100
CHANNEL
-0.100 EMPTY
0.300 &0.100
ALL OTHERS
0.200 FULL)-MWL+WET
26.159 -1.491SOIL5.641
Min Mx 14466 153 DL+LL+HL(1
0.100
CHANNEL
0.100 EMPTY
0.200 &0.000
ALL OTHERS
-0.100 FULL)-MWL+WET
-20.537 0.267SOIL3.760
Max My 14132 193 DL + LL +0.000
HL(1 CHANNEL
0.000 0.200
EMPTY
-0.100
& ALL OTHERS
0.000 20.464
FULL)-MWL
7.744 0.681
Min My 13488 153 DL+LL+HL(1
0.000
CHANNEL
0.000 EMPTY
0.100 &0.100
ALL OTHERS
0.300 FULL)-MWL+WET
-1.111 -6.378SOIL
-1.457
Max Mxy 14419 180 1.0*(DL +0.000
HL(1 CHANNEL
0.000 0.200
EMPTY0.000
& ALL OTHERS
0.000 FULL)-MWL
7.738 -0.577
+ WL (-X))
10.357
Min Mxy 14398 153 DL+LL+HL(1
0.000
CHANNEL
0.000 EMPTY
0.200 &0.000
ALL OTHERS
0.000 FULL)-MWL+WET
-2.219 0.194SOIL
-4.683
Strength Condition
Shear Stress,
2 Bending Moments, kNm/m
Type N/mm
SQX SQY +veMx -veMx +veMy -veMy
Wall 0.50 0.50 162.50 177.65 174.76 179.70
Maximum Moments of W2
X-DIRECTION (Horz.) Y-DIRECTION (Vert.)
Design for Bending moment Inside Out side Inside Out side
MX MX MY MY
Factored Moment(kN-m) 162.50 177.65 174.76 179.70
2
Grade of concrete,fck (N/mm ) 30 30 30 30
2
Grade of steel,fy (N/mm ) 500 500 500 500
Width of section,b (mm) 1000 1000 1000 1000
Thickness of section,h(mm) 450 450 450 450
Cover to reinforcement(mm) 60 60 60 60
2
Mu/bd 1.126 1.231 1.349 1.387
Area of Design steel required(mm2) 1031 1133 1182 1218
Area of Minimum steel required(mm 540 540 540 540
Area of steel provided(mm2) 2094 2094 2094 2094
Area of Steel provided OK OK OK OK
Dia of Main rebar(mm) 20 20 20 20
Spacing of main bars 150 150 150 150
Effective depth,d(mm) 380 380 360 360
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment
Plants and Intermediate Sewage Pumping Stations with
Design
Project Operation & Maintenance thereof for Seven Years [Works VM
by
- A] and Procurement and Construction of Main Sewers
including Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Checked
Doc. Title VM
Screen, Wet Well, Pumping Station & Flowmeter chamber by
Apprd.
KBR-AIPPL- Doc. No. BWSSP III/27/DAS/ISPS/HER/CV/CL/4001 R0 AMG
by
JV
%pt provided 0.551 0.551 0.582 0.582
Es(N/mm2) 200000 200000 200000 200000
2
Ece(N/mm ) 27386 27386 27386 27386
m= Es/Ece 7.303 7.303 7.303 7.303
Depth of
93.60 93.60 90.75 90.75
Neutral axis
x=(sqrt((m.Ast)2 + 2xmAst)-mxAst)xd
Lever arm (mm) =d-x/3 348.80 348.80 329.75 329.75
2
fs (N/mm ) =M/AstxZ 43.53 33.26 12.20 11.34
h (mm) 450 450 450 450
Design of Wall W3
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
4.3) Design of W3
The Geometry properties of W3 Wall
The Thickness of Wall W3 is 400mm .
Crack width check is performed for water face i.e. Moment at inward, outward of tank wall.
Wall elements W3 are highlighted as given below
Orientation of STAAD model
Y axis is upward side
SERVICE CONDITION
Summary of Bending moments (Group No. 701)
Shear Membrane Bending Moment
SQX SQY SX SY SXY Mx kN- My kN- Mxy kN-
Plate L/C
(local) (local) (local) (local) (local) m/m m/m m/m
Max Qx 6059 128 DL+LL+WET
0.292
SOIL+EL(-Z)
-0.025 -0.913 -0.424 0.857 -22.962 -1.911 -1.684
Min Qx 6052 104 DL+WET SOIL
-0.276 -0.007 -0.484 0.012 0.283 -15.578 -0.388 0.071
Max Qy 6015 154 DL+LL+HL(INLET,OUTLET
0.004 0.346 EMPTY
-0.101 & -0.538
ALL OTHERS
0.655
FULL)-MWL+WET
0.162 -26.244
SOIL -0.056
Min Qy 6049 154 DL+LL+HL(INLET,OUTLET
0.281 -0.044 EMPTY
-0.534 & -0.361
ALL OTHERS
0.784
FULL)-MWL+WET
-19.486 0.582
SOIL -4.573
Max Sx 6159 125 DL+LL+WET
0.201
SOIL+EL(+X)
-0.03 0.881 -0.171 -0.085 -6.701 -12.002 -5.869
Min Sx 6079 154 DL+LL+HL(INLET,OUTLET
0.28 0.011 EMPTY
-2.184 & ALL
0.051
OTHERS
0.004
FULL)-MWL+WET
-21.955 -7.032
SOIL 1.897
Max Sy 6079 114 DL+LL+HL(FULL)-MWL+EL(-Z)
0.038 0.005 -0.992 0.335 0.139 -6.66 -6.398 -0.187
Min Sy 6015 154 DL+LL+HL(INLET,OUTLET
0.004 0.346 EMPTY
-0.101 & -0.538
ALL OTHERS
0.655
FULL)-MWL+WET
0.162 -26.244
SOIL -0.056
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
Maximum Moments of W3
X-DIRECTION (Horz.) Y-DIRECTION (Vert.)
Design for Bending moment Inside Out side Inside Out side
MX MX MY MY
x=(sqrt((m.Ast)2 + 2xmAst)-mxAst)xd
Maximum
% of steel Ʈc from Table 19
Shear Check shear Check
provided of IS 456-2000
stress, Ʈv
Distance From the Point Considered to the Surface of Nearest Longitudinal bar
Applied Service Axial Force, T 0.00 KN
Moduli of Elasticity of Concrete " Ec " = 5000x ( sqrt(fcu) ) = 27.39 KN/mm2
Moduli of Elasticity of Steel " Es " = 200.00 KN/mm2
Modular Ratio " a " = (Es/Ec) = 7.30
r = As/bd = 0.00404
a.r = 0.03
Depth of Neutral Axis, " X " = d.a.r(((1+(2/a.r))^0.5)-1) = 71.43 mm
Lever arm " Z " = ( d - X/3) = 308.19 mm
2
Reinforcement Stress " fs " = Ms/(As*Z)+((Tx0.5)/As) = 87.07 N/mm
Concrete Stress " fc " = (fs*As)/(0.5*b*X) = 3.27 N/mm2
"e1 " Strain at Soffit of Concrete Slab = (fs/Es)*(h-X)/(d-X) = 0.00055
"e1 " = (fs/Es)*(h-X)/(d-X)
em = e1 - e2 = -0.00022 mm
Steel Provided is = OK
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
Design of Wall W4
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
4.4) Design of W4
The Geometry properties of W4 Wall
The Thickness of Wall W4 is 400mm .
Crack width check is performed for water face i.e. Moment at inward, outward of tank wall.
Wall elements W4 are highlighted as given below
Orientation of STAAD model
Y axis is upward side
SERVICE CONDITION
Summary of Bending moments (Group No.601)
Shear Membrane Bending Moment
SQX SQY SX SY SXY Mx My Mxy
Plate L/C
(local) (local) (local) (local) (local) kNm/m kNm/m kNm/m
Max Qx 12187 153 DL+LL+HL(1
190.7
CHANNEL
8.9
EMPTY
-721.7
& ALL -47.5
OTHERS FULL)-MWL+WET
-229 43.501 SOIL
9.075 3.407
Min Qx 12172 104 DL+WET SOIL
-194.6 1.1 -738.4 -163.6 27.7 53.775 10.823 0.183
Max Qy 9017 154 DL+LL+HL(INLET,OUTLET
3.4 214 EMPTY
-49.8 & -281.8
ALL OTHERS9.6
FULL)-MWL+WET
2.224 26.74
SOIL -3.901
Min Qy 12323 154 DL+LL+HL(INLET,OUTLET
-13.7 -95.4 EMPTY
-93.7 & -337.4
ALL OTHERS
-24.1
FULL)-MWL+WET
-2.072 -17.636
SOIL 1.449
Max Sx 8746 193 DL + LL + HL(1
48.8CHANNEL
-6 EMPTY
334.3& ALL
260.8
OTHERS
-31.9
FULL)-MWL
5.831 11.664 -0.093
Min Sx 12546 106 DL+LL+WET-152
SOIL 9.6 -849.2 -172.8 -93.8 -27.981 -6.65 1.521
Max Sy 8770 193 DL + LL + HL(1
21.9CHANNEL
-23.4 EMPTY
172.1& ALL
330.4
OTHERS
-111.5
FULL)-MWL
5.85 6.003 2.835
Min Sy 12323 194 DL + LL + HL(INLET,OUTLET
-1.2 -27.2 -29.8
EMPTY -407.4
& ALL OTHERS
-103.4 FULL)-MWL
-1.057 -5.152 0.596
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
Maximum Moments of W4
X-DIRECTION (Horz.) Y-DIRECTION (Vert.)
Design for Bending moment Inside Out side Inside Out side
MX MX MY MY
x=(sqrt((m.Ast)2 + 2xmAst)-mxAst)xd
Maximum
% of steel Ʈc from Table 19
Shear Check shear Check
provided of IS 456-2000
stress, Ʈv
Distance From the Point Considered to the Surface of Nearest Longitudinal bar
Applied Service Axial Force, T 0.00 KN
Moduli of Elasticity of Concrete " Ec " = 5000x ( sqrt(fcu) ) = 27.39 KN/mm2
Moduli of Elasticity of Steel " Es " = 200.00 KN/mm2
Modular Ratio " a " = (Es/Ec) = 7.30
r = As/bd = 0.00404
a.r = 0.03
Depth of Neutral Axis, " X " = d.a.r(((1+(2/a.r))^0.5)-1) = 71.43 mm
Lever arm " Z " = ( d - X/3) = 308.19 mm
2
Reinforcement Stress " fs " = Ms/(As*Z)+((Tx0.5)/As) = 132.58 N/mm
Concrete Stress " fc " = (fs*As)/(0.5*b*X) = 4.98 N/mm2
"e1 " Strain at Soffit of Concrete Slab = (fs/Es)*(h-X)/(d-X) = 0.00084
"e1 " = (fs/Es)*(h-X)/(d-X)
em = e1 - e2 = 0.00006 mm
Steel Provided is = OK
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
Design of Wall W5
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
4.5) Design of W5
The Geometry properties of W5 Wall
The Thickness of Wall W5 is 700mm .
Crack width check is performed for water face i.e. Moment at inward, outward of tank wall.
Wall elements W5 are highlighted as given below
Orientation of STAAD model
Y axis is upward side
SERVICE CONDITION
Summary of Bending moments (Group No. shaft)
Shear Membrane Bending Moment
SQX SQY SX SY SXY Mx My Mxy
Plate L/C
(local) (local) (local) (local) (local) kNm/m kNm/m kNm/m
Max Qx 5923 153 DL+LL+HL(10.20
CHANNEL
0.00
EMPTY
-0.80
& ALL -0.10
OTHERS -0.30
FULL)-MWL+WET
15.63 SOIL
17.88 -0.63
Min Qx 5910 153 DL+LL+HL(1
-0.10
CHANNEL
0.00
EMPTY
-1.00
& ALL OTHERS
0.00 FULL)-MWL+WET
0.10 14.86 SOIL
15.71 -2.24
Max Qy 5037 152 DL+LL+HL(1-CHANNEL,
0.00 0.20WW -0.10
EMPTY))-MWL+WET
-0.60 -0.10
SOIL 2.88 21.81 -0.20
Min Qy 5794 153 DL+LL+HL(10.00
CHANNEL
-0.20
EMPTY
-0.70
& ALL -0.20
OTHERS -0.10
FULL)-MWL+WET
18.14 SOIL
11.51 2.79
Max Sx 5035 111 DL+LL+HL(FULL)-MWL+EL(+X)
0.00 0.20 0.60 -0.50 -0.20 4.76 31.89 -0.25
Min Sx 5500 104 DL+WET SOIL
0.00 0.00 -1.10 -0.50 0.00 2.21 -4.23 -0.05
Max Sy 5785 153 DL+LL+HL(10.00
CHANNEL
-0.10
EMPTY
-0.40
& ALL OTHERS
0.10 -0.20
FULL)-MWL+WET
8.59 SOIL
12.03 2.82
Min Sy 7860 152 DL+LL+HL(1-CHANNEL,
0.00 0.00WW EMPTY))-MWL+WET
0.10 -0.8 -0.10
SOIL -3.15 -2.21 1.02
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
Maximum Moments of W5
X-DIRECTION (Horz.) Y-DIRECTION (Vert.)
Design for Bending moment Out side Inside Out side Inside
MX MX MY MY
Extra Bars location 1.8m @bottom 1.8m @bottom 1.8m @bottom 1.8m @bottom
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
x=(sqrt((m.Ast)2 + 2xmAst)-mxAst)xd
Maximum
% of steel Ʈc from Table 19
Shear Check shear Check
provided of IS 456-2000
stress, Ʈv
Distance From the Point Considered to the Surface of Nearest Longitudinal bar
Applied Service Axial Force, T 0.00 KN
Moduli of Elasticity of Concrete " Ec " = 5000x ( sqrt(fcu) ) = 27.39 KN/mm2
Moduli of Elasticity of Steel " Es " = 200.00 KN/mm2
Modular Ratio " a " = (Es/Ec) = 7.30
r = As/bd = 0.00404
a.r = 0.03
Depth of Neutral Axis, " X " = d.a.r(((1+(2/a.r))^0.5)-1) = 71.43 mm
Lever arm " Z " = ( d - X/3) = 308.19 mm
Reinforcement Stress " fs " = Ms/(As*Z)+((Tx0.5)/As) = 80.31 N/mm2
Concrete Stress " fc " = (fs*As)/(0.5*b*X) = 3.01 N/mm2
"e1 " Strain at Soffit of Concrete Slab = (fs/Es)*(h-X)/(d-X) = 0.00051
"e1 " = (fs/Es)*(h-X)/(d-X)
em = e1 - e2 = -0.00027 mm
Steel Provided is = OK
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
Design of Wall W6
Page 95 of 195
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
KBR-AIPPL- Doc. No. BWSSP III/27/DAS/ISPS/HER/CV/CL/4001 R0 Apprd. by AMG
JV
4.6) Design of W6
The Geometry properties of W6 Wall
The Thickness of Wall W6 is 300mm .
Wall elements W6 are highlighted as given below
Orientation of STAAD model
Y axis is upward side
SERVICE CONDITION
Summary of Bending moments (Group No. VLAVECHAMWALL)
Shear Membrane Bending Moment
SQX SQY SX SY SXY
Mx My Mxy
Plate L/C (local) (local) (local) (local) (local)
kNm/m kNm/m kNm/m
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
Max Qx 16147 101 DL+LL 0.1 0 0.1 0 0 -8.403 -0.162 2.66
Min Qx 16120 101 DL+LL 0 0 0.1 0 0 -9.567 -0.213 -1.681
Max Qy 15445 106 DL+LL+WET SOIL
0 0.1 0 -0.1 0 4.697 25.235 1.288
Min Qy 15876 101 DL+LL 0 0 0 0 0 0.045 0.079 3.378
Max Sx 16140 101 DL+LL 0 0 0.2 0 0 9.001 0.332 0.906
Min Sx 15456 101 DL+LL 0 0 -0.2 0 0.1 -2.425 -0.336 0.591
Max Sy 15432 101 DL+LL 0 0 0 0 0 -1.993 1.698 2.648
Min Sy 15424 101 DL+LL 0 0 0 -0.1 0 4.35 21.757 6.407
Page 96 of 195
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
KBR-AIPPL- Doc. No. BWSSP III/27/DAS/ISPS/HER/CV/CL/4001 R0 Apprd. by AMG
JV
Max Sxy 15456 171 1.0*(DL+HL(FULL)-MWL+WL(+X))
0 0 -0.2 0 0.1 -3.155 -0.417 0.813
Min Sxy 15674 101 DL+LL 0 0 0 -0.1 -0.1 -1.782 4.185 7.138
Max Mx 16140 101 DL+LL 0 0 0.2 0 0 9.001 0.332 0.906
Min Mx 16165 101 DL+LL 0 0 0.1 0 0 -20.712 -0.651 0.422
Max My 15446 106 DL+LL+WET SOIL
0 0.1 0 -0.1 0 4.91 25.622 0.178
Min My 15869 171 1.0*(DL+HL(FULL)-MWL+WL(+X))
0 0 0 0 0 -14.219 -2.922 0.556
Max Mxy 15438 101 DL+LL 0 0 0 -0.1 0 2.293 14.071 11.216
Min Mxy 15407 101 DL+LL 0 0 0 -0.1 0 1.56 10.167 -7.845
Page 97 of 195
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
KBR-AIPPL- Doc. No. BWSSP III/27/DAS/ISPS/HER/CV/CL/4001 R0 Apprd. by AMG
JV
Strength Condition
Shear Stress,
Bending Moments, kNm/m
Type N/mm2
SQX SQY +veMx -veMx +veMy -veMy
Maximum Moments of W6
X-DIRECTION (Horz.) Y-DIRECTION (Vert.)
Design for Bending moment Inside Out side Inside Out side
MX MX MY MY
Cover to reinforcement(mm) 60 60 60 60
Page 98 of 195
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
KBR-AIPPL- Doc. No. BWSSP III/27/DAS/ISPS/HER/CV/CL/4001 R0 Apprd. by AMG
JV
%pt provided 0.340 0.340 0.322 0.322
x=(sqrt((m.Ast)2 + 2xmAst)-mxAst)xd
Maximum
% of steel Ʈc from Table 19
Shear Check shear Check
provided of IS 456-2000
stress, Ʈv
Page 99 of 195
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
KBR-AIPPL- Doc. No. BWSSP III/27/DAS/ISPS/HER/CV/CL/4001 R0 Apprd. by AMG
JV
Cover to steel 60.00 mm
Bar Diameter adopted 12.00 mm
d= 234.00 mm
b= 1000.00 mm
Mu/b/d/d 0.707 Mpa
Steel Grade 500.00 Mpa
Concrete Grade 30.00 Mpa
Refer Mu formula SP16 page 10 Pt= 0.167
Distance From the Point Considered to the Surface of Nearest Longitudinal bar
Applied Service Axial Force, T 0.00 KN
2
Moduli of Elasticity of Concrete " Ec " = 5000x ( sqrt(fcu) ) = 27.39 KN/mm
Moduli of Elasticity of Steel " Es " = 200.00 KN/mm2
Steel Provided is = OK
Design of Wall W7
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
KBR-AIPPL- Doc. No. BWSSP III/27/DAS/ISPS/HER/CV/CL/4001 R0 Apprd. by AMG
JV
4.7) Design of W7
The Geometry properties of W7 Wall
The Thickness of Wall W7 is 300mm .
Wall elements W6 are highlighted as given below
Orientation of STAAD model
Y axis is upward side
SERVICE CONDITION
Summary of Bending moments (Group No. 301)
Shear Membrane Bending Moment
SQX SQY SX SY SXY Mx My Mxy
Plate L/C
(local) (local) (local) (local) (local) kNm/m kNm/m kNm/m
Max Qx 13078 153 DL+LL+HL(1
386.9
CHANNEL
-50.3
EMPTY
345.7
& ALL OTHERS
28.2 FULL)-MWL+WET
11.9 -31.75 SOIL
-8.955 -1.489
Min Qx 12812 151 DL+LL+HL(FULL)-MWL+WET
-208 -109.6 -415.1
SOIL -81.7 -140.8 11.461 -1.448 -2.261
Max Qy 13084 153 DL+LL+HL(1
302.7
CHANNEL
288.9
EMPTY103
& ALL101.2
OTHERS364.5
FULL)-MWL+WET
-17.879 SOIL
-2.447 -10.828
Min Qy 12811 151 DL+LL+HL(FULL)-MWL+WET
124.1 -138.6 -279.8
SOIL -30.3 -138.8 14.339 0.02 2.908
Max Sx 13078 104 DL+WET SOIL
358.7 -64.3 352.8 55.7 34.6 -31.411 -8.391 -0.963
Min Sx 13030 151 DL+LL+HL(FULL)-MWL+WET
28.6 33.9 -511.3
SOIL -59 -102.8 9.136 0.801 1.868
Max Sy 12864 193 DL + LL + HL(1
-51.1CHANNEL
-11.6 EMPTY
51& ALL402
OTHERS
-459.1
FULL)-MWL
1.887 -1.678 -0.862
Min Sy 12867 111 DL+LL+HL(FULL)-MWL+EL(+X)
6 -15.2 14.7 -420.9 -264.5 -0.544 -2.354 -0.603
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
KBR-AIPPL- Doc. No. BWSSP III/27/DAS/ISPS/HER/CV/CL/4001 R0 Apprd. by AMG
JV
Max Sxy 12677 111 DL+LL+HL(FULL)-MWL+EL(+X)
8.1 45.3 -12.6 339.5 399.1 -1.115 -3.923 4.417
Min Sxy 12864 111 DL+LL+HL(FULL)-MWL+EL(+X)
-50.8 -13.3 49.5 398.8 -464.3 1.833 -1.75 -0.891
Max Mx 12811 151 DL+LL+HL(FULL)-MWL+WET
124.1 -138.6 -279.8
SOIL -30.3 -138.8 14.339 0.02 2.908
Min Mx 13078 153 DL+LL+HL(1
386.9
CHANNEL
-50.3
EMPTY
345.7
& ALL OTHERS
28.2 FULL)-MWL+WET
11.9 -31.75 SOIL
-8.955 -1.489
Max My 12953 151 DL+LL+HL(FULL)-MWL+WET
1.8 107.5 -26.4
SOIL -262.2 65.8 1.554 9.159 1.272
Min My 12674 151 DL+LL+HL(FULL)-MWL+WET
3.9 -99.5 -15.8
SOIL -258.5 158 -1.758 -10.009 1.054
Max Mxy 12677 133 DL+LL+HL(1
-22.1
CHANNEL71
EMPTY &
-4ALL361.3
OTHERS375.6
FULL)-MWL+DRY
-2.585 SOIL
-4.293 4.831
Min Mxy 13084 153 DL+LL+HL(1
302.7
CHANNEL
288.9
EMPTY103
& ALL101.2
OTHERS364.5
FULL)-MWL+WET
-17.879 SOIL
-2.447 -10.828
Strength Condition
Shear Stress,
2 Bending Moments, kNm/m
Type N/mm
SQX SQY +veMx -veMx +veMy -veMy
Wall 311.90 314.10 25.87 23.80 15.65 16.60
Maximum Moments of W7
X-DIRECTION (Horz.) Y-DIRECTION (Vert.)
Design for Bending moment Inside Out side Inside Out side
MX MX MY MY
x=(sqrt((m.Ast)2 + 2xmAst)-mxAst)xd
Maximum
% of steel Ʈc from Table 19
Shear Check shear Check
provided of IS 456-2000
stress, Ʈv
Distance From the Point Considered to the Surface of Nearest Longitudinal bar
Applied Service Axial Force, T 0.00 KN
Moduli of Elasticity of Concrete " Ec " = 5000x ( sqrt(fcu) ) = 27.39 KN/mm2
Moduli of Elasticity of Steel " Es " = 200.00 KN/mm2
Modular Ratio " a " = (Es/Ec) = 7.30
r = As/bd = 0.00322
a.r = 0.02
Depth of Neutral Axis, " X " = d.a.r(((1+(2/a.r))^0.5)-1) = 45.56 mm
Lever arm " Z " = ( d - X/3) = 218.81 mm
Reinforcement Stress " fs " = Ms/(As*Z)+((Tx0.5)/As) = 201.47 N/mm2
Concrete Stress " fc " = (fs*As)/(0.5*b*X) = 6.67 N/mm2
"e1 " Strain at Soffit of Concrete Slab = (fs/Es)*(h-X)/(d-X) = 0.00136
"e1 " = (fs/Es)*(h-X)/(d-X)
em = e1 - e2 = 0.00022 mm
Steel Provided is = OK
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
SERVICE CONDITION
Summary of Bending moments
Shear Membrane Bending Moment
SQX SQY SX SY SXY
Mx My Mxy
Plate L/C (local) (local) (local) (local) (local)
kNm/m kNm/m kNm/m
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
Max Qx 8298 165 DL+HL(2 CHANNELS,
0 WW 0 EMPTY0 & ALL OTHERS
0 FULL)-MWL+WET
0 8.474 SOIL
2.542 1.154
Min Qx 8414 193 DL + LL + HL(1 0CHANNEL
0 EMPTY0& ALL OTHERS
0 FULL)-MWL
0 16.154 9.92 -0.165
Max Qy 8298 194 DL + LL + HL(INLET,OUTLET
0 0 EMPTY
0 & ALL0 OTHERS0FULL)-MWL
20.975 13.442 -0.973
Min Qy 8454 102 0.9 DL+UPLIFT 0 0 0 0 0 12.092 9.433 -0.55
Max Sx 8454 101 DL+LL 0 0 0 0 0 14.597 10.491 -1.193
Sewerage Facilities to 110 Villages: Design, Engineering,
Construction and Commissioning of Sewage Treatment Plants
and Intermediate Sewage Pumping Stations with Operation &
Design
Project Maintenance thereof for Seven Years [Works - A] and VM
by
Procurement and Construction of Main Sewers including
Manholes in Dasarahalli and R R Nagar Zones
(V Valley Catchment) [Works – B]
Structural design calculation of Receiving chamber, Coarse Screen, Checked
Doc. Title VM
Wet Well, Pumping Station & Flowmeter chamber by
Strength Condition
Shear Stress,
Bending Moments, kNm/m
Type N/mm2
SQX SQY +veMx -veMx +veMy -veMy
x=(sqrt((m.Ast)2 + 2xmAst)-mxAst)xd
Maximum
% of steel Ʈc from Table 19
Shear Check shear Check
provided of IS 456-2000
stress, Ʈv
Distance From the Point Considered to the Surface of Nearest Longitudinal bar
Applied Service Axial Force, T 0.00 KN
Moduli of Elasticity of Concrete " Ec " = 5000x ( sqrt(fcu) ) = 27.39 KN/mm2
Moduli of Elasticity of Steel " Es " = 200.00 KN/mm2
Steel Provided is = OK