Professional Documents
Culture Documents
Daily Report 06-02-2024
Daily Report 06-02-2024
Subcontractor Labor
Equipment on Site:
on Site
Type Qty Idle Position No Idle
Bobcat “216” 1 Civil site engineer 1
Mechanical excavator “320” 1 Guard 1
JCB 0 Labor 2
Power supply generator 1 Driver 4
Roller Compactor 1 Mechanical engineer 0
Hand excavation tools 10 Construction workers 3
Mini excavator 1 Skilled Welder 2
Small truck 1 Unskilled Welder 2
Smooth drum compactor 1
ONGOING ACTIVITIES
BOQ Div. Area Description
QC INSPECTIONS PERFORMED
Type:
Construction Project De- Approved/
Prelim/ QC Issues/ Name of inspec-
BOQ Div. Area liverable and Inspection Not Ap-
Initial/ Fi- tor
type proved
nal
OPEN DEFICIENCIES
Anticipated
BOQ Div. Area Type* QC Issue Description Resolve Comment
Date
*QC Issue Type: Def= Deficiency, NC= Non-Compliance, S=Safety, EN= Environmental, Other
QCM Comments
Signatures Date
QCM
Zouhair Ab-
Subcontractor Representative dul Rahman