Name of work – coNstuctiNg of tail wall at km 25.600 of lkc
Bill of QuaNtitY S. No. Description of Item No. L B D Qty. 1 Earth work excavation of foundation with all types of soil, including all lead and lift, labours, T&P etc. Required and filling sides of the foundation trenches and disposal of surplus excavated earth as per direction of engineer- in-charge. mixed rocky area 1 4.65 0.70 0.90 2.93 Total 2.93 Cum 2 Providing & Laying Coarse sand including cost of all material labour etc. Complete 1 4.65 0.70 0.15 0.49 Total 0.49 Cum 3 Providing & Laying C.C. 1:3:6 concrete with stone ballast 20-40 mm size with corage sand i/c cost of all material labour etc. Complete 1 4.65 0.70 0.30 0.98 Total 0.98 Cum 4 Providing & laying R.R. Stone Masonary in 1:4 CM with cement, coarse sand and stone boulder (Local boulder) including cost of all material, labour, T&P etc. Required for proper completion of work as per direction of Engineer-in-charge. 1 3.95 0.35 0.90 1.24 2 (1+1.73)/2 0.35 0.75 0.72 Total 1.96 Cum