Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

14

Sh-12
18
Sh-13

10T12-31-250B 1300 T16-40- T16-40-


2T20-39- T20-39- T20-39- T20-39- T20-39-
2T16-40-

R10-41-150 R10-41-150

500
13 13 T16-40- T16-40- T16-40- T16-40-
350

Sh-12 Sh-12
8R10-41-150
T20-39- T20-39- T20-39- T20-39-

2T20-39- T16-40- T16-40-

8R10-35-175

8R10-35-175

8R10-35-175

8R10-35-175
16T12-32-250B
16
3895

Sh-13
17
Sh-13

2T12-37a- 2T12-37- 2T12-37a- 2T12-37- 2T12-37a- 2T12-37-

SUIT TO SITE (MAX:7500)


8R8-38-150 13R8-38-150
R8-38-150 R8-38-150 R8-38-150 R8-38-150

2T12-36a- 2T12-36- 2T12-36a- 2T12-36- 2T12-36a- 2T12-36-

4200
350

T16-34- T16-34- T16-34- T16-34-

T20-33- T20-33 T20-33- T20-33- T20-33 T20-33- T20-33

13R10-35-175

13R10-35-175

13R10-35-175

13R10-35-175
350 350

2150

14
Sh-12 15 15
Sh-13 Sh-13

SCALE 1:30
NOTES:-
300

1. ALL DIMENSIONS ARE IN MILLIMETRES.

2. REINFORCEMENT TO BE RIBBED TOR STEEL UNLESS OTHERWISE STATED.


10T12-31-250B 16T12-32-250B
3. CLEAR COVER TO REINFORCEMENT SHALL BE 50 mm (UNDER GROUND) 16T12-32-250B 10T12-31-250B
25 mm (ABOVE GROUND) UNLESS OTHERWISE STATED.
2250 3895
4. LAP LENGTH SHALL BE 50 x DIA. UNLESS OTHERWISE STATED.

5. LAP TO BE STAGGERED WHEREVER POSSIBLE.


SCALE 1:30 SCALE 1:30
6. BARS TO BE CURTAILED WHEREVER NECESSARY AND SUITABLE TRIMMER BARS TO

BE PROVIDED AT OPENINGS.

7.SETTING OUT DETAILS SHALL BE CHECKED & APPROVED BY THE ENGINEER BEFORE SETTING ANY CONSTRUCTION.
SRIMATHIE
REV. DESCRIPTION DATE SIGN.
SIRIWARDANA.
j`ñk jlsMp`qn h` jl`pvhn mZdly DRAWN D.O.A.(P&D) Drg.No,

NATIONAL WATER SUPPLY AND DRAINAGE BOARD


Njrpa ePh; toq;fy; tbfhyikg;Gr; rig ENGINEER C.E.
08 - 04 - 2024
(STG.IV) (STG.IV) C.E. (P&D) DATE

CULVERT CROSSING DETAILS AT CH 4 + 760 - SHEET 12


A.G.M. (DEVELOPMENT) D.G.M. (SOUTHERN)

You might also like