Site Condition

PMU 132/33kV Tanjung Pauh ITC

Site condition at piling works area (Piling works completed – building scope)
Site Condition

PMU 132/33kV Tanjung Pauh ITC

No adequate support for pile and improper pile stacking for abandoned pile.
To removed balance unused pile from site.
Site Condition

PMU 132/33kV Tanjung Pauh ITC

Conversion psi unit different with method statement


(44tons to 1714.68psi in method statement) (44tons to 3194psi in approved drawing).
To remove load psi unit from general notes in piling layout drawing.
Site Condition

PMU 132/33kV Tanjung Pauh ITC

Pile crack found at site. Pending justification letter from consultant regarding pile crack issue.