Professional Documents
Culture Documents
Paddy - Calculation - Old Tubewell
Paddy - Calculation - Old Tubewell
mm 0.60 m
(command area X total effective rainfall) 5.96 Ha-m
Crop water Requirement - Effective rainfall 6.04 Ha-m
7.55 Ha-m
10.78 Ha-m
= 0.11 MCM
Q 0.03802243 m3/s
136.880734 M3/hr
Name of Schme :- phase 3 and old tubewell scheme
Crop water Requirement (Delta Method)
Command Area
Delta of wheat
Corp water Requirement
(command area X Delta of crop)
GIR 3.20
FIR 4
NIR 5.71428571428571
57142.8571428571 M3
417.464572960552
for 1 day 4.63849525511724
= 8.00 ha
= 0.4 m
=
8.00 X 0.4 = 3.20 ha-m
Name of Schme :- phase 8 and 11 tubewell scheme
Crop water Requirement (Delta Method)
Command Area = 4.00 ha
Delta of wheat = 0.4 m
Corp water Requirement =
(command area X Delta of crop) 4.00 X 0.4 = 1.60 ha-m
GIR 1.60
FIR 2
NIR 2.857143
28571.43 M3
417.4646
for 1 day 4.638495
Name of Schme :- phase 8 and 11 tubewell scheme
Crop water Requirement (Delta Method)
Command Area
Delta of Paddy
Corp water Requirement
(command area X Delta of crop)
Effective rainfall for crop between 15th June to 15th October
7 Av. Rainfall (mm) 140.95 291.82
Effective Rainfall
(i) Pe = 0.8P - 25 If
P> 75 mm/ month
(ii) Pe= 0.6P - 10 if
8 P< 75mm / month 87.76 208.46
mm 0.60 m
(command area X total effective rainfall) 2.98 Ha-m
Crop water Requirement - Effective rainfall 3.02 Ha-m
3.77 Ha-m
5.39 Ha-m
= 0.05 MCM
power of pump
Q
power of pump 1000*9.81*Q*H/0.6
0.0190112130479103 m3/s
68.4403669724771 M3/hr