Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

1TB01-100C02-7010 Marina Village Precinct - Soft Landscaping Marina Schedule Layout 26-May-24 11:21

Activity ID Activity Name Original Start Finish 2024 2025


Duration
D J F M A M J J A S O N D J F MA
184NoCons
1TB01-100C02-7010 Marina Village Precinct - Soft Landscaping Works - Baseline Schedule R3a 19-Jun-24 21-Jan-25 21-Jan-25, 1TB01-100

Construction 184 19-Jun-24 21-Jan-25 21-Jan-25, Constructio

Village Boutique Hotel (VBH) 184 19-Jun-24 21-Jan-25 21-Jan-25, Village Bou
Zone 6 184 19-Jun-24 21-Jan-25 21-Jan-25, Zone 6
Irrigation System 72 19-Jun-24 11-Sep-24 11-Sep-24, Irrigation System
Lateral Lines 22 19-Jun-24 15-Jul-24 15-Jul-24, Lateral Lines
1.TB.01.001.C.1035 Clearing and Excavation Works 6 19-Jun-24 25-Jun-24 Clearing and Excavation Works
1.TB.01.001.C.1105 Preparation of Sand Bedding 2 26-Jun-24 27-Jun-24 Preparation of Sand Bedding
1.TB.01.001.C.1530 Installation of Solenoid Valve from Stub-out. 2 29-Jun-24 30-Jun-24 Installation of Solenoid Valve from Stub-out
1.TB.01.001.C.1535 Installation of Irrigation cable and conduit including full box and warning tapes 2 01-Jul-24 02-Jul-24 Installation of Irrigation cable and conduit in
1.TB.01.001.C.1540 Installation of Sprinkler lateral Pipes 10 03-Jul-24 15-Jul-24 Installation of Sprinkler lateral Pipes
Driplines & Heads 48 16-Jul-24 09-Sep-24 09-Sep-24, Driplines & Heads
1.TB.01.001.C.1335 Laying of Irrigation Driplines with in-line emitter for Ground Cover 2 16-Jul-24 17-Jul-24 Laying of Irrigation Driplines with in-line em
1.TB.01.001.C.1375 Installation of Bubbler Root Watering for Palm and Trees 10 18-Jul-24 29-Jul-24 Installation of Bubbler Root Watering for
1.TB.01.001.C.1415 Installation of Irrigation Driplines with botton Drip emitter for Shrubs 16 30-Jul-24 17-Aug-24 Installation of Irrigation Driplines with bo
1.TB.01.001.C.1545 Installation of Sprinklers heads / Rotor spray 2 18-Aug-24 19-Aug-24 Installation of Sprinklers heads / Rotor
1.TB.01.001.C.1550 Installation of valves assembly with complete fitting and accessories 2 20-Aug-24 21-Aug-24 Installation of valves assembly with co
1.TB.01.001.C.1555 Installation of Drain Pipe for Planter box 16 22-Aug-24 09-Sep-24 Installation of Drain Pipe for Planter b
Irrigation Controller 2 10-Sep-24 11-Sep-24 11-Sep-24, Irrigation Controller
1.TB.01.001.C.1560 Installation of irrigation controller for outdoor 2 10-Sep-24 11-Sep-24 Installation of irrigation controller for
Softscape Works 112 12-Sep-24 21-Jan-25 21-Jan-25, Softscape
Palms & Trees 74 12-Sep-24 08-Dec-24 08-Dec-24, Palms & Trees
1.TB.01.001.C.1030 Excavation Works for tree Pits 10 12-Sep-24 24-Sep-24 Excavation Works for tree Pits
1.TB.01.001.C.1095 Laying of Geotextile & Drainage Gravel 12 25-Sep-24 08-Oct-24 Laying of Geotextile & Drainage G
1.TB.01.001.C.1160 Laying of Planting Medium 6 09-Oct-24 15-Oct-24 Laying of Planting Medium
1.TB.01.001.C.1215 Laying of Soil Mix 8 16-Oct-24 24-Oct-24 Laying of Soil Mix
1.TB.01.001.C.1275 Planting of Palm 10 26-Oct-24 05-Nov-24 Planting of Palm
1.TB.01.001.C.1325 Planting of Shade trees and Buffer trees 16 06-Nov-24 24-Nov-24 Planting of Shade trees and
1.TB.01.001.C.1570 Installation of Stick Guying 12 25-Nov-24 08-Dec-24 Installation of Stick Guying
Succulents, Shrubs, & Ground Cover 112 12-Sep-24 21-Jan-25 21-Jan-25, Succulents
1.TB.01.001.C.1100 Excavation Works for Shrubs and ground cover 20 12-Sep-24 06-Oct-24 Excavation Works for Shrubs and
1.TB.01.001.C.1165 Laying of Geotextile & Drainage Gravel 21 07-Oct-24 30-Oct-24 Laying of Geotextile & Drainag
1.TB.01.001.C.1220 Laying of Planting Medium 21 31-Oct-24 24-Nov-24 Laying of Planting Medium
1.TB.01.001.C.1280 Laying of Soil Mix 21 25-Nov-24 18-Dec-24 Laying of Soil Mix
1.TB.01.001.C.1370 Planting of Shrubs 21 19-Dec-24 12-Jan-25 Planting of Shrubs

Actual Level of Effort Remaining Work Page 1 of 2 TASK filter: Construction Layout.
Actual Work Critical Remaining Work © Oracle Corporation
1TB01-100C02-7010 Marina Village Precinct - Soft Landscaping Marina Schedule Layout 26-May-24 11:21
Activity ID Activity Name Original Start Finish 2024 2025
Duration
D J F M A M J J A S O N D J F MA
1.TB.01.001.C.1410 Planting of Succulents 2 13-Jan-25 14-Jan-25 Planting of Succulents
1.TB.01.001.C.1330 Planting of Climbers 2 15-Jan-25 16-Jan-25 Planting of Climbers
1.TB.01.001.C.1620 Planting of General Planting 4 18-Jan-25 21-Jan-25 Planting of General Pl

Actual Level of Effort Remaining Work Page 2 of 2 TASK filter: Construction Layout.
Actual Work Critical Remaining Work © Oracle Corporation

You might also like