Professional Documents
Culture Documents
d7068 Mjnp1 Acc Wo e 010 Rev0 Signed
d7068 Mjnp1 Acc Wo e 010 Rev0 Signed
Section 3 – Specific Requirements (Note: Check appropriate column. N/A = “Not Applicable”)
Description Yes No N/A Remarks
Third Party Certification (e.g. X
ABS, DNV, etc)
Page 1 of 2
PTMI WO No.: D7068-MJNP1-ACC-WO-E-010 REV0
(PTMI Fabrication WO Form Part 1 Rev 10.2)
PTMI Fabrication Work Order Form
Andrew Patterson
Page 2 of 2
PTMI WO No.: D7068-MJNP1-ACC-WO-E-010 REV0
(PTMI Fabrication WO Form Part 1 Rev 10.2)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:
PREVAILING WIND PLATFORM 1. ALL DIMENSIONS ARE IN MILLIMETERS.
NORTH 2. ALL ELEVATIONS ARE IN METERS AND REFER
TO THE LOWEST ASTRONOMICAL TIDE (LAT.) DATUM.
UTM 3. ALL MATERIAL, FABRICATION AND COATINGS SHALL BE
IN ACCORDANCE WITH COMPANY SPECIFICATIONS.
GRID 4. FOR MATERIAL CLASSIFICATION REFER DRAWING
30° NO. CB-740605-001
5. ALL STRUCTURAL SHAPES SHALL BE SH4-50ksi (UNO.) IN
ACCORDANCE WITH 12-SAMSS-018.
6. ALL PLATE MATERIALS SHALL BE PL4-50ksi(UNO.) IN
ACCORDANCE WITH 12-SAMSS-018.
7. BOLT HOLES TO BE DRILLED ON SITE TO SUIT ACTUAL
1 EQUIPMENT HOLE LOCATIONS.
8. DRILL & TAP FOR 18mm DIA STUD BOLT (W/NUT, LOCKNUT &
WASHER) MINIMUM THREAD ENGAGEMENT OF 30mm.
80 672 120 672 120 672 120 672 120 672 830 120 830 120 830 120 830 80 80 636 120 636 120 636 120 636 80 45 715 45 45 715 45
4725
100 100
200 180
30
45
100
25
PL. #1 PL. #3 PL. #3 PL. #3 PL. #3 PL. #1PL. #1 PL. #3 PL. #3 PL. #3 PL. #1 PL. #1 PL. #3 PL. #3 PL. #3 PL. #1 PL. #5 PL. #5
538
478
573
663
500
PL. #1
PL. #5 PL. #5
PL. #1 PL. #3 PL. #3 PL. #3 PL. #3 PL. #1PL. #1 PL. #3 PL. #3 PL. #3 PL. #1 PL. #1 PL. #3 PL. #3 PL. #3
100
30
45
PL. #5 PL. #5 PL. #5 PL. #5
175 430
650
2065 6188 6188
1718
2700
00 08/11/22 ISSUED FOR CONSTRUCTION AMS MMM RM VR
100
INTERNAL LEAD
50 PL. #5 PL. #5 PL. #5 PL. #5 REVISION
DATE DESCRIPTION DRN CHKD
ENGR
PEM
100 500
McDERMOTT MIDDLE EAST,INC MPP REVISION CONTROL
100 626 140 626 140 626 140 626 140 626 140 626 140 626 140 626 626 140 626 140 626 140 626 140 626 140 626 140 626 140 626 100
REFERENCE DRAWINGS
40
500
TOPSIDES - GENERAL NOTES
PL. #2 PL. #4 PL. #4 PL. #4 PL. #4 PL. #4 PL. #4 PL. #4 PL. #2 PL. #2 PL. #4 PL. #4 PL. #4 PL. #4 PL. #4 PL. #4 PL. #4 PL. #2
548
468
100
TYPICAL SECONDARY BEAMS CONN. DETAILS CB-740618-001
100
468
2942
2996 3840 4000 1423 3064
2251
50
80 830 120 830 120 830 120 830 672 120 672 120 672 120 672 120 672 80 80 636 120 636 120 636 120 636 KEY PLAN
30
PL. #1 PL. #3 PL. #3 PL. #3 PL. #1 PL. #1 PL. #3 PL. #3 PL. #3 PL. #3 PL. #1 PL. #1 PL. #3 PL. #3 PL. #3 PL. #1
538
478
538
PL. #1 PL. #3 PL. #3 PL. #3 PL. #1 PL. #1 PL. #3 PL. #3 PL. #3 PL. #3 PL. #1 PL. #1 PL. #3 PL. #3 PL. #3 PL. #1
30
SCALE
105 170
125 190 150
80 25 25 120 25
100 25 25 140 25 25 100 25
SEE SEE
NOTE 7 SEE SEE SEE 0 0.5 1.0 2.0
50 THK. PL. NOTE 7 50 THK. PL. TYP.
50 THK. PL. NOTE 7 NOTE 7 50 THK. PL. NOTE 7 50 THK. PL. 8
TOP.
50
METERS
EL.(+) 14.210
= =
= =
= =
= =
1 : 25M
= =
60
80
60
SCALE:
80
90
1 NOS. M18 THREADED 1 NOS. M18 THREADED 2 NOS. M18 THREADED 2 NOS. M18 THREADED 2 NOS. M18 THREADED
HOLE FOR M18 HOLE FOR M18 HOLES FOR M18 HOLES FOR M18 HOLES FOR M18
STUD BOLT (TYP.). STUD BOLT (TYP.). STUD BOLTS (TYP.). STUD BOLTS (TYP.).
REVISION VALIDATION
STUD BOLTS (TYP.).
SEE NOTE 8 SEE NOTE 8 SEE NOTE 8 SEE NOTE 8 THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
SEE NOTE 8
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-12201-0002-011
PL. #1 DETAIL PL. #2 DETAIL PL. #3 DETAIL PL. #4 DETAIL PL. #5 DETAIL TYPICAL CONNECTION DETAIL DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
SCALE 1:25 SCALE 1:25 SCALE 1:25 SCALE 1:25 SCALE 1:25 SCALE 1:25 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
MMM
08/11/22
REV.NO. DATE REVISION DESCRIPTION
8300
7. BOLT HOLES TO BE DRILLED ON SITE TO SUIT ACTUAL
EQUIPMENT HOLE LOCATIONS.
DIA406.4 8. DRILL & TAP FOR 18mm DIA STUD BOLT (W/NUT, LOCKNUT &
WASHER) MINIMUM THREAD ENGAGEMENT OF 30mm.
30
9. THIS DRAWING IS DEVELOPED BASED ON AVAILABLE
VENDOR DATA DOCUMENT NO.:
- D7068-VD-EUP02-01-B01-0026 - Rev. B
73
PL. #1 PL. #2 PL. #2 PL. #2 PL. #2 PL. #2 PL. #1 ANY CHANGES DUE TO REVISED INFORMATION ON
ABOVE SHALL BE INCORPORATED IN THE SUBSEQUENT
REVISION OF THE DRAWING.
405
PL. #1 PL. #2 PL. #2 PL. #2 PL. #2 PL. #2 PL. #1
PREVAILING WIND
PLATFORM
NORTH
30° UTM
GR
ID
2 3 4
PL. #1 PL. #2 PL. #2 PL. #2 PL. #2 PL. #2 PL. #1 22000 22000
30
10500
B'
13500 13500
27000
BATTERY RACK FOOT PRINT AT TOP.
EL. (+) 34.710
(SCALE 1:10) A'
10500
A
THIS DRAWING
SCALE
105 170
25 80 25 120 25
SEE
NOTE 50 THK. PL. SEE
50 THK. PL. BASE PL.
7 NOTE 7
TYP. 0 0.1 0.2 0.3 0.4 0.5 1.0
8
= =
= =
60
60
METERS
1 NOS. M18 THREADED
50
HOLES FOR M18 2 NOS. M18 THREADED
TOS EL(+)34.700 m 1 : 10M
STUD BOLTS (TYP.). HOLES FOR M18 SCALE: