SN DESCRIPTION OF WORK UNIT INITIAL

1 SITE CLEARANCE m2 30,063.62


Site clearance including removal of vegetation
around the inlet canal 1503.48
Site clearance including removal of vegetation 1985.87

2 EARTHWORK
Excavation work in boulder and gravel mixed soil
2.01 with 50m lead 5432.36

Excavation work in boulder and gravel mixed soil


2.02 upto formation level with a leadupto 100m lead 1099.32
Excavation work in boulder and gravel mixed soil
2.03 with a leadupto 100m lead 42719.8
2.04 Hard rock excavation 3098.2

2.05 Excavation in boulder,gravel and sand mixed soil 2050


Compacted backfill with excavated material
2.06 under 301.1.2.1 410
Excavation work in boulder and gravel mixed soil
2.07 with a lead upto 200 m 5094.82
2.08 Disposal of Excavated material 10951.6
Compacted backfill with excavated material
2.09 under 301.2.1 1341
2.1 Backfill with compaction at foundation base 114.96

Excavation work in boulder and gravel mixed soil


2.11 up to the formation level with a lead upto 50 m
2.12 Backfilling with excavated material 195.62
Compacted backfill from excavated material
2.13 under 402.1 759.28
2.14 Compacted backfill 18227.8
2.15 Compacted backfill under item no. 702.1 922.32
2.16 Excavation for boulder mixed soil with 50m lead 1204.62
Excavation work in boulder and gravel mixed soil
2.17 upto the formation level with 30m lead 578
Compacted back fill from the material under 173.4
2.18 902.1
Excavation work excavation in soft soil up to the
1909.57
2.19 formation level
2.2 compacted backfill behind gabion wall 110.7

3 COFFER DAM
Filling with excavated riverbed material from
3.01 under item no.202.1 m³ 418.7
3.02 0.5 m thick boulder riprap m³ 42
3.03 Placing of geotextile underneath boulder riprap m2 12.08
4 CONCRETE WORK
4.01 Placing of 75mm thick C15 blindIng concrete 1206.5
4.02 Placing of C25 concrete 2716.53
4.03 Placing C35 Concrete 106.15
4.04 Placing of C25 (40% Plum) 3591.17

5 FORMWORK
5.01 Formwork including Centering and Shuttering 2702.05
Form Work including Centering and Shuttering as
5.02 per Design level 16787.27

6 REINFORCEMENT ton
6.01 Placing of reinforcement bar 272.69
Placing of Reinforcement bar for sub-structure,
6.02 super-structures and machine foundations 88.84

8 JOINT DETAILS
8.01 Providing and laying of water bar at the joints rm 8.30
8.02 Joint sealent (25 mm thick) rm 94.48
8.03 Joint filler (25 mm thick) m2 244.7

8.04 Providing and laying of water bar Rear Guard S rm 225.49


Providing and laying of water bar Waterfoil or
8.05 Hydrofoil rm 303.63
8.06 Joint sealent (20 mm thick) rm 431.50
8.07 Joint filler (20 mm thick) m2 299.29
8.08 Providing and laying of water bar rm 4

9 GABION WORKS
9.01 300 mm thick Gabion Matress m2 57.95
9.02 Gabion box m 3
671.71
9.03 Gabion wall m 3
715.96

10 STONE MASONRY
10.01 1:4 cement sand stone masonry m3 55
Stone masonry 1:4 for temporary support on
10.02 juction m3 9
Dressed / Rubble stone masonry with 1:4 cement
10.03 sand mortar mortar m3 81.58
10.04 1:4 stone masonry 1864.05
10.05 1:4 Stone masonry wall on superstructure 550.77
10.05 1:4 Brick wall

11 GEOTEXTILE
11.01 150gm/m2 Geotextile m2 3905.57
12 BASE PREPARATION
Preparation of sub grade formation level as per
12.01 line and level as specified on the drawings 2695.32

Preparation of sub grade formation at


12.02 undersluice and inlet canal base as per line 408.62
Preparation of sub grade formation level as per
12.03 line and level m2 1080.82
Preparation of sub grade as per line and level
12.04 specified on drawing m2 6091.06
Preparation of sub grade as per line and level 500.00
specified on drawing, gravelling with 10-40mm
12.05 gravel m³

13 MISCELLANEOUS WORKS
13.01 1m Ø boulder lining m³ 421.96
13.02 2m Ø boulder lining m³ 2499.27
13.03 0.5 m thick filter( coble and pebbles) m³ 1092.57
13.04 0.25 m thick transition filter m³ 456.4
13.05 0.5 m thick clay blanket m³ 912.8
13.06 Construction drain arround the powerhouse LS 0
13.07 Fencing arround the power house LS 0
13.08 Earthing inside PH LS 0
13.09 stone soling including breaking of stone Cum
13.1 0.5 m thick graded filter material m2
13.11 0.5 m Dia boulder riprap cum
13.12 0.3 m thick filter( coble and pebbles) cum
13.13 0.3 m thick clay blanket cum
13.14 0.3 m thick 20 mm down river bed gravel cum
13.15 0.3 m Dia stone soling cum

14 Hard stone lining


14.01 40cm thick hard stone lining m³ 27.67
300 mm thick dressed hard stone lining on the
14.02 base slab of undersluice m2 42.4

15 SELECTED GRAVEL BACKFILL


15.01 20-90mm dia gravel fill around the pipe m³ 3.85

16 HDPE PIPE
16.01 225 mm dia semi perforated pipe rm 98.91
16.02 0.6 m dia Heavy Duty Hume pipe
16.03 0.4 m dia. Heavy Duty HDPE Pipe

17 BOULDER RIPRAP
17.0 0.5m to 1.0m boulder riprap m3 1474.56
17.02 1-2m boulder riprap at outlet of tailrace canal m3 279.14
18 MASONRY WALL
18.01 1:4 Stone masonry wall m³
18.02 1:4 Brick wall m³

19 ROOFING
19.01 Roof truss of MS- steel tubular section panels
including fasteners and purlin m 614.4
19.02 Colour Heritage sheet for roofing m 2
463.81

20 SAL WOOD DOOR & WINDOW OPENINGS


20.01 Door and window frame m³ 2.04
20.02 Panelled Door shutter m2 25.44
20.03 Glazed window shutter m2 80.66

21 FLOORING WORK
21.01 Sand filling on control room m³ 9.35
21.02 300mm thick stone soling with sand filler for base
preparation on floor m³ 112.22
21.03 PPC (1:3:6)work above stone soling m³ 28.05
21.04 1:4 Cement sand plaster above PCC m2 505.05
21.05 3mm thick punning above plaster inside control
room base m2 505.05

22 PLASTERING ON WALLS
22.01 12mm thick 1:4 CS plaster on wall and ceiling of
control room m2 2502.86

23 PAINTING
23.01 Painting to plastered walls, ceilings and outerwall
in approved paint and color m2 2502.86

24 METAL WORKS
24.01 Sliding Door ton 0.9
24.02 Gantry Crane Kg 3400
25 Boulder Lining m³ 1257.41
REV-1 REV-2 BoQ REVISED BOQ Rev 2 IPC upto-10 RATE
25,737.02 25737.02 29822.63 27,489.63 10.00

737.11 2,970.11 3070.11 328.44 10.00


1,985.87 1983.31 1,985.87 4695.54 10.00

44524.744 41,187.38 49252.30 3,877.58 340.00

340.00

340.00
3,157.19 1,454.60 2780.81 710.14 700.00

1025.00 5,713.47 5713.47 831.37 340.00

307.50 1,083.23 1183.23 - 250.00

3217.835 2917.352 3217.835 4328.64879481 340.00


2734.801 2515 2734.801 2360.59399481 250.00

684 360.00 684 112.44 250.00


114.957 114.957 50 195.616 250.00

1594.02 1,570.02 1,570.020 340.00


195.62 195.62 195.62 250

759.28 759.28 959.280 759.28 250.00


13949.69 9922.97 14852.867 - 250
729.28 729.28 3,188.000 - 250.00
843.23 2815 2,815.000 709.45 340.00

578 578 340.00


173.4
173.4 173.400 0.00 250.00
1145.74 1145.74 1,837.240 340.00
1,728.24
250.00

418.70 418.70
418.698 250.00
200.00
42.00 30.00 42.00 40.00 2,650.00
122.08 122.080 30.00 600.00
1113.44 1,018.21 895.77 329.08 9500
2470.65 2,860.93 3808.48 3,329.74 21,300.00
96.59 76.59 96.59 68.98756 27,500.00
3306.62 3,035.83 4448.628 2,199.65 15000

2276 2373 2531.44 5,582.63 550.00

11714.0956 11948.46 13549.555 3,454.34 550.00

214.232 232.88 330.803 286.58 123,000.00

83.55 91.5 141.72 130.65 123000

10.80 13.20 13.10 13.15 1,500.00


94.48 84.48 102.58 0.00 1,500.00
126.49 126.51 126.49 33.50 2,000.00

104.09 114.09 104.09 33.63 1,500.00

238.97 230.97 254.97 131.50 2,000.00


286.50 286.5 286.5 - 2,000.00
188.69 183.03 188.69 22.32 2,000.00
2.5 2.5 21.000 0.00 1,500.00

395.63 0 449.26 0 600.00


671.73 280 670.00 40.50 3,800.00
965.96 476 4213.96 1,581.25 3800

137.5 347.898 288 302.84 6,500.00

9 9.00 9.000 6.9 6,500.00

325.5 210.5 160.000 375.13109 6,500.00


1647.36 1547.44 1794.63 7,519.12 6500
165.23 152.20 6500
-

4126.26 12322.48 1,191.12 600.00


7456.34 2537.06 3419.630 3,201.29 20.00

408.67 1281.66 1389.56 1080.82 20.00

1389.56 4000.00 4,420.00 1080.82 20.00


372.46

960.000 - 20.00

1749.49 1749 1749.490 514.299 2,650.00


421.96 205 421.960 89.409 2,650.00
1092.57 842.57 1092.570 301.854 2,650.00
456.4 395 456.400 137.0763 2,200.00
912.8 612 255.685 255.685 1,500.00
0 -
0 -

3553.5 127.82 145.00


400.00 - 2,200.00
33.480 2,650.00 - 1,500.00
18.630 2,650.00 - 1800
8.820 1,500.00 - 9500
9.620 2,200.00 - 300
90.000 2,650.00 0.00 150

27.67 27.00 34.320 0 4,500.00

42.404 42.4 42.404 0 5,000.00

33.91 33.91 43.914 30.064 1,800.00

98.91 98.91 98.910 83.51 650.00


- 18.000 -
- -

288.90 205.00 288.900 0.00 2,650.00


83.74 83.74 50.000 0.00 2,650.00
165.23 125 457.099 152.20 6,500.00
0 75.859 - -

614.4 614.4 1,786.580 - 850.00


463.8144 463.8144 749.554 - 1,500.00

2.04237 2.042367 2.500 - 180,000.00


25.44 25.44 25.440 - 2,200.00
80.664 80.66 100.535 - 2,500.00

9.35125 9.3513 - - 1,500.00

112.215 112.215 176.43 - 1,800.00


28.05375 28.05375 31.42 - 9,500.00
505.05 505.05 - - 300.00

505.05 505.05 603.75 - 150.00

2502.86 2502.86 2,672.80 - 320.00

2502.86 2502.86 2,672.80 - 150.00

0.9 0.9 0.900 0 160,000.00


160
2650
HUMLA
400000
650000
150000
SN DESCRIPTION OF WORK UNIT INITIAL
1 SITE CLEARANCE m2 30063.62
Site clearance including removal of vegetation around
the inlet canal 1503.48
Site clearance including removal of vegetation 1985.87

2 EARTHWORK
Excavation work in boulder and gravel mixed soil with
2.01 50m lead 5432.36
Excavation work in boulder and gravel mixed soil upto
2.02 formation level with a leadupto 100m lead 1099.32
Excavation work in boulder and gravel mixed soil with a
2.03 leadupto 100m lead 42719.8
2.04 Hard rock excavation 3098.2
2.05 Excavation in boulder,gravel and sand mixed soil 2050
Compacted backfill with excavated material under
2.06 301.1.2.1 410
Excavation work in boulder and gravel mixed soil with a
2.07 lead upto 200 m 5094.82

2.08 Disposal of Excavated material 10951.6

Compacted backfill with excavated material under


2.09 301.2.1 1341
2.1 Backfill with compaction at foundation base 114.96
Excavation work in boulder and gravel mixed soil up to
2.11 the formation level with a lead upto 50 m
2.12 Backfilling with excavated material 195.62
Compacted backfill from excavated material under
2.13 402.1 759.28
2.14 Compacted backfill 18227.8
2.15 Compacted backfill under item no. 702.1 922.32
2.16 Excavation for boulder mixed soil with 50m lead 1204.62
Excavation work in boulder and gravel mixed soil upto
2.17 the formation level with 30m lead 578
2.18 Compacted back fill from the material under 902.1 173.4
Excavation work excavation in soft soil up to the
2.19 formation level 1909.57
2.2 compacted backfill behind gabion wall 110.7

3 COFFER DAM
Filling with excavated riverbed material from under item
3.01 no.202.1 m³ 418.7
3.02 0.5 m thick boulder riprap m³ 42
3.03 Placing of geotextile underneath boulder riprap m2 12.08
4 CONCRETE WORK
4.01 Placing of 75mm thick C15 blindIng concrete 1206.5
4.02 Placing of C25 concrete 2716.53
4.03 Placing C35 Concrete 106.15
4.04 Placing of C25 (40% Plum) 3591.17

5 FORMWORK
5.01 Formwork including Centering and Shuttering 2702.05
Form Work including Centering and Shuttering as per
5.02 Design level 16787.27

6 REINFORCEMENT ton
6.01 Placing of reinforcement bar 272.69
Placing of Reinforcement bar for sub-structure, super-
6.02 structures and machine foundations 88.84

8 JOINT DETAILS
8.01 Providing and laying of water bar at the joints rm 8.3
8.02 Joint sealent (25 mm thick) rm 94.48
8.03 Joint filler (25 mm thick) m2 244.7
8.04 Providing and laying of water bar Rear Guard S rm 225.49

8.05 Providing and laying of water bar Waterfoil or Hydrofoil rm 303.63


8.06 Joint sealent (20 mm thick) rm 431.5
8.07 Joint filler (20 mm thick) m2 299.29
8.08 Providing and laying of water bar rm 4

9 GABION WORKS
9.01 300 mm thick Gabion Matress m2 57.95
9.02 Gabion box m3 671.71
9.03 Gabion wall m3 715.96

10 STONE MASONRY
10.01 1:4 cement sand stone masonry m3 55
10.02 Stone masonry 1:4 for temporary support on juction m3 9
Dressed / Rubble stone masonry with 1:4 cement sand
10.03 mortar mortar m3 81.58
10.04 1:4 stone masonry 1864.05
10.05 1:4 Stone masonry wall on superstructure 550.77
10.05 1:4 Brick wall

11 GEOTEXTILE
11.01 150gm/m2 Geotextile m2 3905.57

12 BASE PREPARATION
Preparation of sub grade formation level as per line and
12.01 level as specified on the drawings 2695.32
Preparation of sub grade formation as per line and
level as specified on the drawings m2
Preparation of sub grade formation at undersluice and
12.02 inlet canal base as per line 408.62
Preparation of sub grade formation level as per line and
12.03 level m2 1080.82
Preparation of sub grade as per line and level specified
12.04 on drawing m2 6091.06
Preparation of sub grade as per line and level specified
12.04143 on drawing m2
Preparation of sub grade as per line and level specified
12.04786 on drawing m2
Preparation of sub grade as per line and level specified
12.05 on drawing, gravelling with 10-40mm gravel m³ 500

13 MISCELLANEOUS WORKS
13.01 1m Ø boulder lining m³ 421.96
13.02 2m Ø boulder lining m³ 2499.27
13.03 0.5 m thick filter( coble and pebbles) m³ 1092.57
13.04 0.25 m thick transition filter m³ 456.4
13.05 0.5 m thick clay blanket m³ 912.8
13.06 Construction drain arround the powerhouse LS 0
13.07 Fencing arround the power house LS 0
13.08 Earthing inside PH LS 0
13.09 stone soling including breaking of stone Cum
13.1 0.5 m thick graded filter material m2
13.11 0.5 m Dia boulder riprap cum
13.12 0.3 m thick filter( coble and pebbles) cum
13.13 0.3 m thick clay blanket cum
13.14 0.3 m thick 20 mm down river bed gravel cum
13.15 0.3 m Dia stone soling cum

14 Hard stone lining


14.01 40cm thick hard stone lining m³ 27.67
300 mm thick dressed hard stone lining on the base
14.02 slab of undersluice m2 42.4

15 SELECTED GRAVEL BACKFILL


15.01 20-90mm dia gravel fill around the pipe m³ 3.85

16 HDPE PIPE
16.01 225 mm dia semi perforated pipe rm 98.91
16.02 0.6 m dia Heavy Duty Hume pipe
16.03 0.4 m dia. Heavy Duty HDPE Pipe

17 BOULDER RIPRAP
17.01 0.5m to 1.0m boulder riprap m3 1474.56
17.02 1-2m boulder riprap at outlet of tailrace canal m3 279.14
18 MASONRY WALL
18.01 1:4 Stone masonry wall m³
18.02 1:4 Brick wall m³

19 ROOFING
Roof truss of MS- steel tubular section panels including
19.01 fasteners and purlin m 614.4
19.02 Colour Heritage sheet for roofing m2 463.81

20 SAL WOOD DOOR & WINDOW OPENINGS


20.01 Door and window frame m³ 2.04
20.02 Panelled Door shutter m2 25.44
20.03 Glazed window shutter m2 80.66

21 FLOORING WORK
21.01 Sand filling on control room m³ 9.35
300mm thick stone soling with sand filler for base
21.02 preparation on floor m³ 112.22
21.03 PPC (1:3:6)work above stone soling m³ 28.05
21.04 1:4 Cement sand plaster above PCC m2 505.05
3mm thick punning above plaster inside control room
21.05 base m2 505.05

22 PLASTERING ON WALLS
12mm thick 1:4 CS plaster on wall and ceiling of control
22.01 room m2 2502.86

23 PAINTING
Painting to plastered walls, ceilings and outerwall in
23.01 approved paint and color m2 2502.86

24 METAL WORKS
24.01 Sliding Door ton 0.9
24.02 Gantry Crane Kg 3400
25 Boulder Lining m³ 1257.41
REV-1 REV-2 BoQ REVISED BOQ Rev 2 IPC upto-10 RATE HUMLA
25737.02 25737.02 29822.63 27489.63 10

737.11 2970.11 3070.11 328.44 10


1985.87 1983.31 1985.87 4695.54 10

44524.744 41187.38 49252.3 3877.5848 340

340

340
3157.193 1454.6 2780.812 710.14323333 700
1025 5713.47 5713.47 831.369 340

307.5 1083.23 1183.23 0 250

3217.835 2917.352 3217.835 4328.6487948 340

2734.801 2515 2734.801 2360.5939948 250

684 360 684 112.44302 250


114.957 114.957 50 195.616 250

1594.02 1570.02 1570.02 340


195.62 195.62 195.62 250

759.28 759.28 959.28 759.28 250


13949.69 9922.97 14852.867 0 250
729.28 729.28 3188 0 250
843.23 2815 2815 709.45 340

578 578 340


173.4 173.4 173.4 0 250

1145.74 1145.74 1837.24 1728.24112 340


250

418.698 418.7 418.698 200 250


42 30 42 40 2650
122.08 122.08 30 600
1113.44 1018.21 895.77 329.07594313 9500
2470.65 2860.93 3808.483 3329.7387971 21300
96.59 76.59 96.59 68.98756 27500
3306.62 3035.832 4448.628 2199.6519305 15000

2276.46 2373 2531.44 5582.634692 550

11714.0956 11948.46 13549.555 3454.341221 550

214.232 232.88 330.803 286.5799735 123000

83.55 91.5 141.72 130.65048245 123000

10.8 13.2 13.1 13.15 1500


94.48 84.48 102.58 0 1500
126.49 126.51 126.49 33.5004 2000
104.09 114.09 104.09 33.63 1500

238.97 230.97 254.97 131.504 2000


286.5 286.5 286.5 0 2000
188.69 183.03 188.69 22.32 2000
2.5 2.5 21 0 1500

395.63 0 449.26 0 600


671.735 280 670 40.5 3800
965.96 476 4213.96 1581.25 3800

137.5 347.898 287.898 302.8395 6500


9 9 9 6.9 6500

325.5 210.5 160 375.13109 6500


1647.36 1547.44 1794.63 7519.124251 6500
165.23 152.2 6500
0

4126.26 12322.48 1191.122206 600

7456.34 2537.06 3419.63 3201.288 20


149 151.45 2980 20

408.67 1281.66 1389.56 1080.82 20

1389.56 4000 4420 1080.82 20

641.56 339 20

829.5 1051.97 20

372.46 960 0 20

1749.49 1749 1749.49 514.299 2650


421.96 205 421.96 89.409 2650
1092.57 842.57 1092.57 301.854 2650
456.4 395 456.4 137.0763 2200
912.8 612 255.685 255.685 1500
0 0
0 0

3553.5 127.8204 145


400 0 2200
33.48 2650 0 1500
18.63 2650 0 1800
8.82 1500 0 9500
9.62 2200 0 300
90 2650 0 150

27.672 27 34.32 0 4500

42.404 42.4 42.404 0 5000

33.914 33.91 43.914 30.064 1800

98.91 98.91 98.91 83.51 650


0 18 0
0 0

288.9 205 288.9 0 2650


83.74 83.74 50 0 2650
165.23 125 457.099 152.2 6500
0 75.859 0 0

614.4 614.4 1786.58 0 850


463.8144 463.8144 749.554 0 1500

2.04237 2.042367 2.5 0 180000


25.44 25.44 25.44 0 2200
80.664 80.66 100.535 0 2500

9.35125 9.3513 0 0 1500

112.215 112.215 176.43 0 1800


28.05375 28.05375 31.42 0 9500
505.05 505.05 0 0 300

505.05 505.05 603.754 0 150

2502.86 2502.86 2672.8 0 320

2502.86 2502.86 2672.8 0 150

0.9 0.9 0.9 0 160000


160
2650
SN DESCRIPTION OF WORK
1 SITE CLEARANCE
Site Clearance work
Site clearance including removal of vegetation around the inlet canal
Site clearance including removal of vegetation

2 EARTHWORK
2.01 Excavation work in boulder and gravel mixed soil with 50m lead
2.02 Excavation work in boulder and gravel mixed soil upto formation level with a leadupto 100m lead
2.03 Excavation work in boulder and gravel mixed soil with a leadupto 100m lead
2.04 Hard rock excavation
2.05 Excavation in boulder,gravel and sand mixed soil
2.06 Compacted backfill with excavated material under 301.1.2.1
2.07 Excavation work in boulder and gravel mixed soil with a lead upto 200 m
2.08 Disposal of Excavated material
2.09 Compacted backfill with excavated material under 301.2.1
2.1 Backfill with compaction at foundation base
2.11 Excavation work in boulder and gravel mixed soil up to the formation level with a lead upto 50 m
2.12 Backfilling with excavated material
2.13 Compacted backfill from excavated material under 402.1
2.14 Compacted backfill
2.15 Compacted backfill under item no. 702.1
2.16 Excavation for boulder mixed soil with 50m lead
2.17 Excavation work in boulder and gravel mixed soil upto the formation level with 30m lead
2.18 Compacted back fill from the material under 902.1
2.19 Excavation work excavation in soft soil up to the formation level
2.2 compacted backfill behind gabion wall

3 COFFER DAM
3.01 Filling with excavated riverbed material from under item no.202.1
3.02 0.5 m thick boulder riprap
3.03 Placing of geotextile underneath boulder riprap

4 CONCRETE WORK
4.01 Placing of 75mm thick C15 blindIng concrete
4.02 Placing of C25 concrete
4.03 Placing C35 Concrete
4.04 Placing of C25 (40% Plum)

5 FORMWORK
5.01 Formwork including Centering and Shuttering
5.02 Form Work including Centering and Shuttering as per Design level

6 REINFORCEMENT
6.01 Placing of reinforcement bar
6.02 Placing of Reinforcement bar for sub-structure, super-structures and machine foundations
8 JOINT DETAILS
8.01 Providing and laying of water bar at the joints
8.02 Joint sealent (25 mm thick)
8.03 Joint filler (25 mm thick)
8.04 Providing and laying of water bar Rear Guard S
8.05 Providing and laying of water bar Waterfoil or Hydrofoil
8.06 Joint sealent (20 mm thick)
8.07 Joint filler (20 mm thick)
8.08 Providing and laying of water bar

9 GABION WORKS
9.01 300 mm thick Gabion Matress
9.02 Gabion box
9.03 Gabion wall

10 STONE MASONRY
10.01 1:4 cement sand stone masonry
10.02 Stone masonry 1:4 for temporary support on juction
10.03 Dressed / Rubble stone masonry with 1:4 cement sand mortar mortar
10.04 1:4 stone masonry
10.05 1:4 Stone masonry wall on superstructure
10.05 1:4 Brick wall

11 GEOTEXTILE
11.01 150gm/m2 Geotextile

12 BASE PREPARATION
12.01 Preparation of sub grade formation level as per line and level as specified on the drawings
Preparation of sub grade formation as per line and level as specified on the drawings
12.02 Preparation of sub grade formation at undersluice and inlet canal base as per line
12.03 Preparation of sub grade formation level as per line and level
12.04 Preparation of sub grade as per line and level specified on drawing
12.04143 Preparation of sub grade as per line and level specified on drawing
12.04786 Preparation of sub grade as per line and level specified on drawing
12.05 Preparation of sub grade as per line and level specified on drawing, gravelling with 10-40mm gravel

13 MISCELLANEOUS WORKS
13.01 1m Ø boulder lining
13.02 2m Ø boulder lining
13.03 0.5 m thick filter( coble and pebbles)
13.04 0.25 m thick transition filter
13.05 0.5 m thick clay blanket
13.06 Construction drain arround the powerhouse
13.07 Fencing arround the power house
13.08 Earthing inside PH
13.09 stone soling including breaking of stone
13.1 0.5 m thick graded filter material
13.11 0.5 m Dia boulder riprap
13.12 0.3 m thick filter( coble and pebbles)
13.13 0.3 m thick clay blanket
13.14 0.3 m thick 20 mm down river bed gravel
13.15 0.3 m Dia stone soling

14 Hard stone lining


14.01 40cm thick hard stone lining
14.02 300 mm thick dressed hard stone lining on the base slab of undersluice

15 SELECTED GRAVEL BACKFILL


15.01 20-90mm dia gravel fill around the pipe

16 HDPE PIPE
16.01 225 mm dia semi perforated pipe
16.02 0.6 m dia Heavy Duty Hume pipe
16.03 0.4 m dia. Heavy Duty HDPE Pipe

17 BOULDER RIPRAP
17.01 0.5m to 1.0m boulder riprap
17.02 1-2m boulder riprap at outlet of tailrace canal

18 MASONRY WALL
18.01 1:4 Stone masonry wall
18.02 1:4 Brick wall

19 ROOFING
19.01 Roof truss of MS- steel tubular section panels including fasteners and purlin
19.02 Colour Heritage sheet for roofing

20 SAL WOOD DOOR & WINDOW OPENINGS


20.01 Door and window frame
20.02 Panelled Door shutter
20.03 Glazed window shutter

21 FLOORING WORK
21.01 Sand filling on control room
21.02 300mm thick stone soling with sand filler for base preparation on floor
21.03 PPC (1:3:6)work above stone soling
21.04 1:4 Cement sand plaster above PCC
21.05 3mm thick punning above plaster inside control room base

22 PLASTERING ON WALLS
22.01 12mm thick 1:4 CS plaster on wall and ceiling of control room

23 PAINTING
23.01 Painting to plastered walls, ceilings and outerwall in approved paint and color

24 METAL WORKS
24.01 Sliding Door
24.02 Gantry Crane
25 Boulder Lining
UNIT INITIAL REV-1 REV-2 BoQ REVISED BOQ Rev 2 IPC upto-10 RATE

m2 30063.62 25737.02 25737.02 27,489.63 27489.63 10 274,896.30


1503.48 737.11 2970.11 3070.11 328.44 10 30,701.10
1985.87 1985.87 1983.31 1985.87 4695.54 10 19,858.70
-
-
5432.36 44524.74 41187.38 49252.3 3877.5848 340 16,745,782.00
1099.32 340 -
42719.8 340 -
3098.2 3157.193 1454.6 2,780.81 710.14323333 700 1,946,568.40
2050 1025 5713.47 5713.47 831.369 340 1,942,579.80
410 307.5 1083.23 1867.23 0 250 466,807.50
5094.82 3217.835 2917.352 3217.835 4328.6487948 340 1,094,063.90
10951.6 2734.801 2515 2734.801 2360.5939948 250 683,700.25
1341 684 360 112.44302 250 -
114.96 114.957 114.957 50 195.616 250 12,500.00
1594.02 1570.02 1,570.02 340 533,806.80
195.62 195.62 195.62 195.62 250 48,905.00
759.28 759.28 759.28 959.28 759.28 250 239,820.00
18227.8 13949.69 9922.97 14852.867 0 250 3,713,216.75
922.32 729.28 729.28 3188 0 250 797,000.00
1204.62 843.23 2815 2815 709.45 340 957,100.00
578 578 578 0 340 -
173.4 173.4 173.4 173.4 0 250 43,350.00
1909.57 1145.74 1145.74 1837.24 1728.24112 340 624,661.60
110.7 250 -
-
-
m³ 418.7 418.698 418.7 418.698 200 250 104,674.50
m³ 42 42 30 42.00 40 2650 111,300.00
m2 12.08 122.08 122.08 30 600 73,248.00
-
-
1206.5 1113.44 1018.21 895.77 329.07594313 9500 8,509,815.00
2716.53 2470.65 2860.93 3808.48 3329.7387971 21300 81,120,687.90
106.15 96.59 76.59 96.59 68.98756 27500 2,656,225.00
3591.17 3306.62 3035.832 4448.628 2199.6519305 15000 66,729,420.00
-
-
2702.05 2276.46 2373 2434.44 5582.634692 550 1,338,942.00
16787.27 11714.1 11948.46 13549.555 3454.341221 550 7,452,255.25
-
ton -
272.69 214.232 232.88 330.803 286.5799735 123000 40,688,769.00
88.84 83.55 91.5 141.72 130.65048245 123000 17,431,560.00
-
-
rm 8.3 10.8 13.2 13.10 13.15 1500 19,650.00
rm 94.48 94.48 84.48 102.58 0 1500 153,870.00
m2 244.7 126.49 126.51 126.49 33.5004 2000 252,980.00
rm 225.49 104.09 114.09 104.09 33.63 1500 156,135.00
rm 303.63 238.97 230.97 254.97 131.504 2000 509,940.00
rm 431.5 286.5 286.5 286.5 0 2000 573,000.00
m2 299.29 188.69 183.03 188.69 22.32 2000 377,380.00
rm 4 2.5 2.5 21 0 1500 31,500.00
-
-
m2 57.95 395.63 0 449.26 0 600 269,556.00
m3 671.71 671.735 280 670.00 40.5 3800 2,546,000.00
m3 715.96 965.96 476 4193.96 1581.25 3800 15,937,048.00
-
-
m3 55 137.5 347.898 288 302.8395 6500 1,871,337.00
m3 9 9 9 9 6.9 6500 58,500.00
m3 81.58 325.5 210.5 160 375.13109 6500 1,040,000.00
1864.05 1647.36 1547.44 1794.63 7519.124251 6500 11,665,095.00
550.77 165.23 152.2 6500 -
0 -
-
-
m2 3905.57 4126.26 12322.48 1191.122206 600 7,393,488.00
-
-
2695.32 7456.34 2537.06 2028.66 3201.288 20 40,573.20
m2 149 2980 20 -
408.62 408.67 -
m2 1080.82 408.67 1281.66 1188.90 1080.82 20 23,778.00
m2 6091.06 1389.56 4000 6011.63 1080.82 20 120,232.60
m2 641.56 20 -
m2 829.5 20 -
m³ 500 372.46 960 0 20 19,200.00
-
-
m³ 421.96 1749.49 1749 1749.49 514.299 2650 4,636,148.50
m³ 2499.27 421.96 205 421.96 89.409 2650 1,118,194.00
m³ 1092.57 1092.57 842.57 1092.57 301.854 2650 2,895,310.50
m³ 456.4 456.4 395 456.4 137.0763 2200 1,004,080.00
m³ 912.8 912.8 612 255.685 255.685 1500 383,527.50
LS 0 0 0 0 -
LS 0 0 0 0 -
LS 0 -
Cum 3553.5 0 127.8204 145 -
m2 400 0 2200 880,000.00
cum 33.48 33.48 0 2,650.00 88,722.00
cum 18.63 18.63 0 2,650.00 49,369.50
cum 8.82 8.82 0 1,500.00 13,230.00
cum 9.62 9.62 0 2,200.00 21,164.00
cum 90 90 0 2,650.00 238,500.00
-
-
m³ 27.67 27.672 27 34.32 0 4500 154,440.00
m2 42.4 42.404 42.4 42.404 0 5000 212,020.00
-
-
m³ 3.85 33.914 33.91 43.914 30.064 1800 79,045.20
-
-
rm 98.91 98.91 98.91 98.91 83.51 650 64,291.50
0 18 18 0 -
0 36.893 0 -
-
-
m3 1474.56 288.9 205 288.9 0 2650 765,585.00
m3 279.14 83.74 83.74 50 0 2650 132,500.00
-
-
m³ 165.23 125 457.099 152.2 6500 2,971,143.50
m³ 0 75.859 0 0 -
-
-
m 614.4 614.4 614.4 1786.58 0 850 1,518,593.00
m2 463.81 463.8144 463.8144 749.554 0 1500 1,124,331.00
-
-
m³ 2.04 2.04237 2.042367 2.5 0 180000 450,000.00
m2 25.44 25.44 25.44 25.44 0 2200 55,968.00
m2 80.66 80.664 80.66 100.535 0 2500 251,337.50
-
-
m³ 9.35 9.35125 9.3513 0 0 1500 -
m³ 112.22 112.215 112.215 176.43 0 1800 317,574.00
m³ 28.05 28.05375 28.05375 31.42 0 9500 298,490.00
m2 505.05 505.05 505.05 0 0 300 -
m2 505.05 505.05 505.05 603.75 0 150 90,562.50
-
-
m2 2502.86 2502.86 2502.86 2672.8 0 320 855,296.00
-
-
m2 2502.86 2502.86 2502.86 2672.8 0 150 400,920.00
-
-
ton 0.9 0.9 0.9 0.9 0 160000 144,000.00
Kg 3400 160 -
m³ 1257.41 339 2650 898,350.00
0 -
196,469.42

321,564,170.75

528,183.40
SN DESCRIPTION OF WORK UNIT INITIAL REV-1 REV-2 BoQ

1 SITE CLEARANCE
Site Clearance work m2 30,063.62 25,737.02 25737.02
Site clearance including removal of 1503.48 737.11 2,970.11
vegetation around the inlet canal
Site clearance including removal of
1985.87 1,985.87 1983.31
vegetation

2 EARTHWORK
Excavation work in boulder and
2.01 5432.36 44524.744 41,187.38
gravel mixed soil with 50m lead
Excavation work in boulder and
2.02 gravel mixed soil upto formation level 1099.32
with a leadupto 100m lead
Excavation work in boulder and
2.03 gravel mixed soil with a leadupto 42719.8
100m lead
2.04 Hard rock excavation 3098.2 3,157.19 1,454.60
Excavation in boulder,gravel and
2.05 2050 1025.00 5,713.47
sand mixed soil
Compacted backfill with excavated
2.06 410 307.50 1,083.23
material under 301.1.2.1
Excavation work in boulder and
2.07 gravel mixed soil with a lead upto 200 5094.82 3217.835 2917.352
m
2.08 Disposal of Excavated material 10951.6 2734.801 2515
Compacted backfill with excavated
2.09 1341 684 360.00
material under 301.2.1
Backfill with compaction at foundation
2.1 114.96 114.957 114.957
base
Excavation work in boulder and
2.11 gravel mixed soil up to the formation 1594.02 1,570.02
level with a lead upto 50 m
2.12 Backfilling with excavated material 195.62 195.62 195.62
Compacted backfill from excavated
2.13 759.28 759.28 759.28
material under 402.1
2.14 Compacted backfill 18227.8 13949.69 9922.97
Compacted backfill under item no.
2.15 922.32 729.28 729.28
702.1
Excavation for boulder mixed soil with
2.16 1204.62 843.23 2815
50m lead
Excavation work in boulder and
2.17 gravel mixed soil upto the formation 578 578 578
level with 30m lead
Compacted back fill from the material
2.18 173.4 173.4 173.4
under 902.1
Excavation work excavation in soft
2.19 1909.57 1145.74 1145.74
soil up to the formation level
2.2 compacted backfill behind gabion wall 110.7

3 COFFER DAM
Filling with excavated riverbed
3.01 m³ 418.7 418.70 418.70
material from under item no.202.1
3.02 0.5 m thick boulder riprap m³ 42 42.00 30.00
Placing of geotextile underneath
3.03 m2 12.08 122.08
boulder riprap

4 CONCRETE WORK
Placing of 75mm thick C15 blindIng 1206.5
4.01 1113.44 1,018.21
concrete
4.02 Placing of C25 concrete 2716.53 2470.65 2,860.93
4.03 Placing C35 Concrete 106.15 96.59 76.59
4.04 Placing of C25 (40% Plum) 3591.17 3306.62 3,035.83

5 FORMWORK
Formwork including Centering and
5.01 2702.05 2276 2373
Shuttering
Form Work including Centering and
5.02 16787.27 11714.0956 11948.46
Shuttering as per Design level

6 REINFORCEMENT ton
6.01 Placing of reinforcement bar 272.69 214.232 232.88
Placing of Reinforcement bar for sub-
6.02 structure, super-structures and 88.84 83.55 91.5
machine foundations

8 JOINT DETAILS
Providing and laying of water bar at
8.01 rm 8.30 10.80 13.20
the joints
8.02 Joint sealent (25 mm thick) rm 94.48 94.48 84.48
8.03 Joint filler (25 mm thick) m2 244.7 126.49 126.51
Providing and laying of water bar
8.04 rm 225.49 104.09 114.09
Rear Guard S
Providing and laying of water bar
8.05 rm 303.63 238.97 230.97
Waterfoil or Hydrofoil
8.06 Joint sealent (20 mm thick) rm 431.50 286.50 286.5
8.07 Joint filler (20 mm thick) m2 299.29 188.69 183.03
8.08 Providing and laying of water bar rm 4 2.5 2.5

9 GABION WORKS
9.01 300 mm thick Gabion Matress m2 57.95 395.63 0
9.02 Gabion box m3 671.71 671.73 280
9.03 Gabion wall m3 715.96 965.96 476

10 STONE MASONRY
10.01 1:4 cement sand stone masonry m3 55 137.5 347.898
Stone masonry 1:4 for temporary
10.02 m3 9 9 9.00
support on juction
Dressed / Rubble stone masonry with
10.03 m3 81.58 325.5 210.5
1:4 cement sand mortar mortar
10.04 1:4 stone masonry 1864.05 1647.36 1547.44
1:4 Stone masonry wall on
10.05 550.77 165.23
superstructure
10.05 1:4 Brick wall

11 GEOTEXTILE
11.01 150gm/m2 Geotextile m2 3905.57 4126.26

12 BASE PREPARATION
Preparation of sub grade formation
12.01 level as per line and level as specified 2695.32 7456.34 2537.06
on the drawings
Preparation of sub grade formation
as per line and level as specified on m2 149
the drawings
Preparation of sub grade formation at
12.02 undersluice and inlet canal base as 408.62
per line
Preparation of sub grade formation
12.03 m2 1080.82 408.67 1281.66
level as per line and level
Preparation of sub grade as per line
12.04 m2 6091.06 1389.56 4000.00
and level specified on drawing
Preparation of sub grade as per line
12.041428571 m2 641.56
and level specified on drawing
Preparation of sub grade as per line
12.047857143 m2 829.5
and level specified on drawing
Preparation of sub grade as per line
12.05 and level specified on drawing, m³ 500.00 372.46
gravelling with 10-40mm gravel

13 MISCELLANEOUS WORKS
13.01 1m Ø boulder lining m³ 421.96 1749.49 1749
13.02 2m Ø boulder lining m³ 2499.27 421.96 205
13.03 0.5 m thick filter( coble and pebbles) m³ 1092.57 1092.57 842.57
13.04 0.25 m thick transition filter m³ 456.4 456.4 395
13.05 0.5 m thick clay blanket m³ 912.8 912.8 612
Construction drain arround the
13.06 LS 0 0
powerhouse
13.07 Fencing arround the power house LS 0 0
13.08 Earthing inside PH LS 0
stone soling including breaking of
13.09 Cum 3553.5
stone
13.1 0.5 m thick graded filter material m2
13.11 0.5 m Dia boulder riprap cum 33.480
13.12 0.3 m thick filter( coble and pebbles) cum 18.630
13.13 0.3 m thick clay blanket cum 8.820
0.3 m thick 20 mm down river bed
13.14 cum 9.620
gravel
13.15 0.3 m Dia stone soling cum 90.000

14 Hard stone lining


14.01 40cm thick hard stone lining m³ 27.67 27.67 27.00
300 mm thick dressed hard stone
14.02 m2 42.4 42.404 42.4
lining on the base slab of undersluice

15 SELECTED GRAVEL BACKFILL


20-90mm dia gravel fill around the
15.01 m³ 3.85 33.91 33.91
pipe

16 HDPE PIPE
16.01 225 mm dia semi perforated pipe rm 98.91 98.91 98.91
16.02 0.6 m dia Heavy Duty Hume pipe - 18.000
16.03 0.4 m dia. Heavy Duty HDPE Pipe -

17 BOULDER RIPRAP
17.0 0.5m to 1.0m boulder riprap m3 1474.56 288.90 205.00
1-2m boulder riprap at outlet of
17.02 m3 279.14 83.74 83.74
tailrace canal

18 MASONRY WALL
18.01 1:4 Stone masonry wall m³ 165.23 125
18.02 1:4 Brick wall m³ 0

19 ROOFING
Roof truss of MS- steel tubular
19.01 section panels including fasteners m 614.4 614.4 614.4
and purlin
19.02 Colour Heritage sheet for roofing m2 463.81 463.8144 463.8144

SAL WOOD DOOR & WINDOW


20
OPENINGS
20.01 Door and window frame m³ 2.04 2.04237 2.042367
20.02 Panelled Door shutter m2 25.44 25.44 25.44
20.03 Glazed window shutter m2 80.66 80.664 80.66

21 FLOORING WORK
21.01 Sand filling on control room m³ 9.35 9.35125 9.3513
300mm thick stone soling with sand
21.02 m³ 112.22 112.215 112.215
filler for base preparation on floor
21.03 PPC (1:3:6)work above stone soling m³ 28.05 28.05375 28.05375
21.04 1:4 Cement sand plaster above PCC m2 505.05 505.05 505.05
3mm thick punning above plaster
21.05 m2 505.05 505.05 505.05
inside control room base

22 PLASTERING ON WALLS
12mm thick 1:4 CS plaster on wall
22.01 m2 2502.86 2502.86 2502.86
and ceiling of control room

23 PAINTING
Painting to plastered walls, ceilings
23.01 and outerwall in approved paint and m2 2502.86 2502.86 2502.86
color

24 METAL WORKS
24.01 Sliding Door ton 0.9 0.9 0.9
24.02 Gantry Crane Kg 3400
25 Boulder Lining m³ 1257.41
REVISED
BOQ Rev IPC upto-10 RATE HUMLA Rev 2 IPC upto-10
2

27,489.63 23,894.10 10.00 274896.3 23894.10


328.44 10.00
3070.11 30701.1 2352.765
4695.54 10.00
1985.87 19858.7 2522.1516
0
0
3,877.58 340.00
49252.3 16745782 13446.95

340.00
0

340.00
0 24013.33
2,780.81 710.14 700.00 1946568.4 2,500.39
831.37 340.00
5713.47 1942579.8 5519.83456
- 250.00
1867.23 466807.5 988.17

4328.64879481482 340.00
3217.835 1094063.9 4328.64879481
2734.801 2360.59399481482 250.00 683700.25 2360.59399481
112.44 250.00
0
195.616 250.00
50 12500 195.616

340.00
1,570.02 533806.8
195.62 250 48905
759.28 250.00
959.28 239820 759.28
14852.867 - 250 3713216.75 1,775.63
- 250.00
3188 797000
709.45 340.00
2815 957100

340.00
0 0
0.00 250.00
173.4 43350
1,728.24 340.00
1837.24 624661.6
250.00
0
0
0
200.00 250.00
418.698 104674.5
42.00 40.00 2,650.00 111300
30.00 600.00
122.08 73248
0
0
329.08 9500
895.77 8509815
3808.48 3,329.74 21,300.00 81120687.9
96.59 68.98756 27,500.00 2656225
4448.628 2,199.65 15000 66729420
0
0
5,582.63 550.00
2434.44 1338942
3,454.34 550.00
13549.555 7452255.25
0
0
330.803 286.58 123,000.00 40688769

130.65 123000
141.72 17431560
0
0
13.15 1,500.00
13.10 19650
102.58 0.00 1,500.00 153870
126.49 33.50 2,000.00 252980
33.63 1,500.00
104.09 156135
131.50 2,000.00
254.97 509940
286.5 - 2,000.00 573000
188.69 22.32 2,000.00 377380
21 0.00 1,500.00 31500
0
0
449.26 0 600.00 269556
670.00 40.50 3,800.00 2546000
4193.96 1,581.25 3800 15937048
0
0
288 302.84 6,500.00 1871337
6.9 6,500.00
9 58500
375.13109 6,500.00
160 1040000
1794.63 7,519.12 6500 11665095
152.20 6500
0
- 0
0
0
12322.48 1,191.12 600.00 7393488
0
0

3,201.29 20.00
2028.66 40573.2

2,980.00 20.00
0

408.67 0
1080.82 20.00
1188.90 23778
1080.82 20.00
6011.63 120232.6
20.00
0
20
0

- 20.00
960 19200
0
0
1749.49 514.299 2,650.00 4636148.5
421.96 89.409 2,650.00 1118194
1092.57 301.854 2,650.00 2895310.5
456.4 137.0763 2,200.00 1004080
255.685 255.685 1,500.00 383527.5
-
0 0
0 - 0
0
127.82 145.00
0 0
400 - 2,200.00 880000
33.48 - 2,650.00 88722
18.63 - 2,650.00 49369.5
8.82 - 1,500.00 13230
-
9.62 2,200.00 21164
90 0.00 2,650.00 238500
0
0
34.32 0 4,500.00 154440

0 5,000.00
42.404 212020
0
0
30.064 1,800.00
43.914 79045.2
0
0
98.91 83.51 650.00 64291.5
18 - 0
36.893 - 0
0
0
288.9 0.00 2,650.00 765585
0.00 2,650.00
50 132500
0
0
457.099 152.20 6,500.00 2971143.5
75.859 - - 0
0
0

- 850.00
1786.58 1518593
749.554 - 1,500.00 1124331
0

0
2.5 - 180,000.00 450000
25.44 - 2,200.00 55968
100.535 - 2,500.00 251337.5
0
0
0 - 1,500.00 0
- 1,800.00
176.43 317574
31.42 - 9,500.00 298490
- 300.00
0 0
- 150.00
603.75 90562.5
0
0
- 320.00
2672.8 855296
0
0

- 150.00
2672.8 400920
0
0
0.9 0 160,000.00 144,000.00
160 0
339 2650 898350
0 0

196,469.42