2 EARTHWORK
Excavation work in boulder and gravel mixed soil
2.01 with 50m lead 5432.36
3 COFFER DAM
Filling with excavated riverbed material from
3.01 under item no.202.1 m³ 418.7
3.02 0.5 m thick boulder riprap m³ 42
3.03 Placing of geotextile underneath boulder riprap m2 12.08
4 CONCRETE WORK
4.01 Placing of 75mm thick C15 blindIng concrete 1206.5
4.02 Placing of C25 concrete 2716.53
4.03 Placing C35 Concrete 106.15
4.04 Placing of C25 (40% Plum) 3591.17
5 FORMWORK
5.01 Formwork including Centering and Shuttering 2702.05
Form Work including Centering and Shuttering as
5.02 per Design level 16787.27
6 REINFORCEMENT ton
6.01 Placing of reinforcement bar 272.69
Placing of Reinforcement bar for sub-structure,
6.02 super-structures and machine foundations 88.84
8 JOINT DETAILS
8.01 Providing and laying of water bar at the joints rm 8.30
8.02 Joint sealent (25 mm thick) rm 94.48
8.03 Joint filler (25 mm thick) m2 244.7
9 GABION WORKS
9.01 300 mm thick Gabion Matress m2 57.95
9.02 Gabion box m 3
671.71
9.03 Gabion wall m 3
715.96
10 STONE MASONRY
10.01 1:4 cement sand stone masonry m3 55
Stone masonry 1:4 for temporary support on
10.02 juction m3 9
Dressed / Rubble stone masonry with 1:4 cement
10.03 sand mortar mortar m3 81.58
10.04 1:4 stone masonry 1864.05
10.05 1:4 Stone masonry wall on superstructure 550.77
10.05 1:4 Brick wall
11 GEOTEXTILE
11.01 150gm/m2 Geotextile m2 3905.57
12 BASE PREPARATION
Preparation of sub grade formation level as per
12.01 line and level as specified on the drawings 2695.32
13 MISCELLANEOUS WORKS
13.01 1m Ø boulder lining m³ 421.96
13.02 2m Ø boulder lining m³ 2499.27
13.03 0.5 m thick filter( coble and pebbles) m³ 1092.57
13.04 0.25 m thick transition filter m³ 456.4
13.05 0.5 m thick clay blanket m³ 912.8
13.06 Construction drain arround the powerhouse LS 0
13.07 Fencing arround the power house LS 0
13.08 Earthing inside PH LS 0
13.09 stone soling including breaking of stone Cum
13.1 0.5 m thick graded filter material m2
13.11 0.5 m Dia boulder riprap cum
13.12 0.3 m thick filter( coble and pebbles) cum
13.13 0.3 m thick clay blanket cum
13.14 0.3 m thick 20 mm down river bed gravel cum
13.15 0.3 m Dia stone soling cum
16 HDPE PIPE
16.01 225 mm dia semi perforated pipe rm 98.91
16.02 0.6 m dia Heavy Duty Hume pipe
16.03 0.4 m dia. Heavy Duty HDPE Pipe
17 BOULDER RIPRAP
17.0 0.5m to 1.0m boulder riprap m3 1474.56
17.02 1-2m boulder riprap at outlet of tailrace canal m3 279.14
18 MASONRY WALL
18.01 1:4 Stone masonry wall m³
18.02 1:4 Brick wall m³
19 ROOFING
19.01 Roof truss of MS- steel tubular section panels
including fasteners and purlin m 614.4
19.02 Colour Heritage sheet for roofing m 2
463.81
21 FLOORING WORK
21.01 Sand filling on control room m³ 9.35
21.02 300mm thick stone soling with sand filler for base
preparation on floor m³ 112.22
21.03 PPC (1:3:6)work above stone soling m³ 28.05
21.04 1:4 Cement sand plaster above PCC m2 505.05
21.05 3mm thick punning above plaster inside control
room base m2 505.05
22 PLASTERING ON WALLS
22.01 12mm thick 1:4 CS plaster on wall and ceiling of
control room m2 2502.86
23 PAINTING
23.01 Painting to plastered walls, ceilings and outerwall
in approved paint and color m2 2502.86
24 METAL WORKS
24.01 Sliding Door ton 0.9
24.02 Gantry Crane Kg 3400
25 Boulder Lining m³ 1257.41
REV-1 REV-2 BoQ REVISED BOQ Rev 2 IPC upto-10 RATE
25,737.02 25737.02 29822.63 27,489.63 10.00
340.00
340.00
3,157.19 1,454.60 2780.81 710.14 700.00
418.70 418.70
418.698 250.00
200.00
42.00 30.00 42.00 40.00 2,650.00
122.08 122.080 30.00 600.00
1113.44 1,018.21 895.77 329.08 9500
2470.65 2,860.93 3808.48 3,329.74 21,300.00
96.59 76.59 96.59 68.98756 27,500.00
3306.62 3,035.83 4448.628 2,199.65 15000
960.000 - 20.00
2 EARTHWORK
Excavation work in boulder and gravel mixed soil with
2.01 50m lead 5432.36
Excavation work in boulder and gravel mixed soil upto
2.02 formation level with a leadupto 100m lead 1099.32
Excavation work in boulder and gravel mixed soil with a
2.03 leadupto 100m lead 42719.8
2.04 Hard rock excavation 3098.2
2.05 Excavation in boulder,gravel and sand mixed soil 2050
Compacted backfill with excavated material under
2.06 301.1.2.1 410
Excavation work in boulder and gravel mixed soil with a
2.07 lead upto 200 m 5094.82
3 COFFER DAM
Filling with excavated riverbed material from under item
3.01 no.202.1 m³ 418.7
3.02 0.5 m thick boulder riprap m³ 42
3.03 Placing of geotextile underneath boulder riprap m2 12.08
4 CONCRETE WORK
4.01 Placing of 75mm thick C15 blindIng concrete 1206.5
4.02 Placing of C25 concrete 2716.53
4.03 Placing C35 Concrete 106.15
4.04 Placing of C25 (40% Plum) 3591.17
5 FORMWORK
5.01 Formwork including Centering and Shuttering 2702.05
Form Work including Centering and Shuttering as per
5.02 Design level 16787.27
6 REINFORCEMENT ton
6.01 Placing of reinforcement bar 272.69
Placing of Reinforcement bar for sub-structure, super-
6.02 structures and machine foundations 88.84
8 JOINT DETAILS
8.01 Providing and laying of water bar at the joints rm 8.3
8.02 Joint sealent (25 mm thick) rm 94.48
8.03 Joint filler (25 mm thick) m2 244.7
8.04 Providing and laying of water bar Rear Guard S rm 225.49
9 GABION WORKS
9.01 300 mm thick Gabion Matress m2 57.95
9.02 Gabion box m3 671.71
9.03 Gabion wall m3 715.96
10 STONE MASONRY
10.01 1:4 cement sand stone masonry m3 55
10.02 Stone masonry 1:4 for temporary support on juction m3 9
Dressed / Rubble stone masonry with 1:4 cement sand
10.03 mortar mortar m3 81.58
10.04 1:4 stone masonry 1864.05
10.05 1:4 Stone masonry wall on superstructure 550.77
10.05 1:4 Brick wall
11 GEOTEXTILE
11.01 150gm/m2 Geotextile m2 3905.57
12 BASE PREPARATION
Preparation of sub grade formation level as per line and
12.01 level as specified on the drawings 2695.32
Preparation of sub grade formation as per line and
level as specified on the drawings m2
Preparation of sub grade formation at undersluice and
12.02 inlet canal base as per line 408.62
Preparation of sub grade formation level as per line and
12.03 level m2 1080.82
Preparation of sub grade as per line and level specified
12.04 on drawing m2 6091.06
Preparation of sub grade as per line and level specified
12.04143 on drawing m2
Preparation of sub grade as per line and level specified
12.04786 on drawing m2
Preparation of sub grade as per line and level specified
12.05 on drawing, gravelling with 10-40mm gravel m³ 500
13 MISCELLANEOUS WORKS
13.01 1m Ø boulder lining m³ 421.96
13.02 2m Ø boulder lining m³ 2499.27
13.03 0.5 m thick filter( coble and pebbles) m³ 1092.57
13.04 0.25 m thick transition filter m³ 456.4
13.05 0.5 m thick clay blanket m³ 912.8
13.06 Construction drain arround the powerhouse LS 0
13.07 Fencing arround the power house LS 0
13.08 Earthing inside PH LS 0
13.09 stone soling including breaking of stone Cum
13.1 0.5 m thick graded filter material m2
13.11 0.5 m Dia boulder riprap cum
13.12 0.3 m thick filter( coble and pebbles) cum
13.13 0.3 m thick clay blanket cum
13.14 0.3 m thick 20 mm down river bed gravel cum
13.15 0.3 m Dia stone soling cum
16 HDPE PIPE
16.01 225 mm dia semi perforated pipe rm 98.91
16.02 0.6 m dia Heavy Duty Hume pipe
16.03 0.4 m dia. Heavy Duty HDPE Pipe
17 BOULDER RIPRAP
17.01 0.5m to 1.0m boulder riprap m3 1474.56
17.02 1-2m boulder riprap at outlet of tailrace canal m3 279.14
18 MASONRY WALL
18.01 1:4 Stone masonry wall m³
18.02 1:4 Brick wall m³
19 ROOFING
Roof truss of MS- steel tubular section panels including
19.01 fasteners and purlin m 614.4
19.02 Colour Heritage sheet for roofing m2 463.81
21 FLOORING WORK
21.01 Sand filling on control room m³ 9.35
300mm thick stone soling with sand filler for base
21.02 preparation on floor m³ 112.22
21.03 PPC (1:3:6)work above stone soling m³ 28.05
21.04 1:4 Cement sand plaster above PCC m2 505.05
3mm thick punning above plaster inside control room
21.05 base m2 505.05
22 PLASTERING ON WALLS
12mm thick 1:4 CS plaster on wall and ceiling of control
22.01 room m2 2502.86
23 PAINTING
Painting to plastered walls, ceilings and outerwall in
23.01 approved paint and color m2 2502.86
24 METAL WORKS
24.01 Sliding Door ton 0.9
24.02 Gantry Crane Kg 3400
25 Boulder Lining m³ 1257.41
REV-1 REV-2 BoQ REVISED BOQ Rev 2 IPC upto-10 RATE HUMLA
25737.02 25737.02 29822.63 27489.63 10
340
340
3157.193 1454.6 2780.812 710.14323333 700
1025 5713.47 5713.47 831.369 340
641.56 339 20
829.5 1051.97 20
372.46 960 0 20
2 EARTHWORK
2.01 Excavation work in boulder and gravel mixed soil with 50m lead
2.02 Excavation work in boulder and gravel mixed soil upto formation level with a leadupto 100m lead
2.03 Excavation work in boulder and gravel mixed soil with a leadupto 100m lead
2.04 Hard rock excavation
2.05 Excavation in boulder,gravel and sand mixed soil
2.06 Compacted backfill with excavated material under 301.1.2.1
2.07 Excavation work in boulder and gravel mixed soil with a lead upto 200 m
2.08 Disposal of Excavated material
2.09 Compacted backfill with excavated material under 301.2.1
2.1 Backfill with compaction at foundation base
2.11 Excavation work in boulder and gravel mixed soil up to the formation level with a lead upto 50 m
2.12 Backfilling with excavated material
2.13 Compacted backfill from excavated material under 402.1
2.14 Compacted backfill
2.15 Compacted backfill under item no. 702.1
2.16 Excavation for boulder mixed soil with 50m lead
2.17 Excavation work in boulder and gravel mixed soil upto the formation level with 30m lead
2.18 Compacted back fill from the material under 902.1
2.19 Excavation work excavation in soft soil up to the formation level
2.2 compacted backfill behind gabion wall
3 COFFER DAM
3.01 Filling with excavated riverbed material from under item no.202.1
3.02 0.5 m thick boulder riprap
3.03 Placing of geotextile underneath boulder riprap
4 CONCRETE WORK
4.01 Placing of 75mm thick C15 blindIng concrete
4.02 Placing of C25 concrete
4.03 Placing C35 Concrete
4.04 Placing of C25 (40% Plum)
5 FORMWORK
5.01 Formwork including Centering and Shuttering
5.02 Form Work including Centering and Shuttering as per Design level
6 REINFORCEMENT
6.01 Placing of reinforcement bar
6.02 Placing of Reinforcement bar for sub-structure, super-structures and machine foundations
8 JOINT DETAILS
8.01 Providing and laying of water bar at the joints
8.02 Joint sealent (25 mm thick)
8.03 Joint filler (25 mm thick)
8.04 Providing and laying of water bar Rear Guard S
8.05 Providing and laying of water bar Waterfoil or Hydrofoil
8.06 Joint sealent (20 mm thick)
8.07 Joint filler (20 mm thick)
8.08 Providing and laying of water bar
9 GABION WORKS
9.01 300 mm thick Gabion Matress
9.02 Gabion box
9.03 Gabion wall
10 STONE MASONRY
10.01 1:4 cement sand stone masonry
10.02 Stone masonry 1:4 for temporary support on juction
10.03 Dressed / Rubble stone masonry with 1:4 cement sand mortar mortar
10.04 1:4 stone masonry
10.05 1:4 Stone masonry wall on superstructure
10.05 1:4 Brick wall
11 GEOTEXTILE
11.01 150gm/m2 Geotextile
12 BASE PREPARATION
12.01 Preparation of sub grade formation level as per line and level as specified on the drawings
Preparation of sub grade formation as per line and level as specified on the drawings
12.02 Preparation of sub grade formation at undersluice and inlet canal base as per line
12.03 Preparation of sub grade formation level as per line and level
12.04 Preparation of sub grade as per line and level specified on drawing
12.04143 Preparation of sub grade as per line and level specified on drawing
12.04786 Preparation of sub grade as per line and level specified on drawing
12.05 Preparation of sub grade as per line and level specified on drawing, gravelling with 10-40mm gravel
13 MISCELLANEOUS WORKS
13.01 1m Ø boulder lining
13.02 2m Ø boulder lining
13.03 0.5 m thick filter( coble and pebbles)
13.04 0.25 m thick transition filter
13.05 0.5 m thick clay blanket
13.06 Construction drain arround the powerhouse
13.07 Fencing arround the power house
13.08 Earthing inside PH
13.09 stone soling including breaking of stone
13.1 0.5 m thick graded filter material
13.11 0.5 m Dia boulder riprap
13.12 0.3 m thick filter( coble and pebbles)
13.13 0.3 m thick clay blanket
13.14 0.3 m thick 20 mm down river bed gravel
13.15 0.3 m Dia stone soling
16 HDPE PIPE
16.01 225 mm dia semi perforated pipe
16.02 0.6 m dia Heavy Duty Hume pipe
16.03 0.4 m dia. Heavy Duty HDPE Pipe
17 BOULDER RIPRAP
17.01 0.5m to 1.0m boulder riprap
17.02 1-2m boulder riprap at outlet of tailrace canal
18 MASONRY WALL
18.01 1:4 Stone masonry wall
18.02 1:4 Brick wall
19 ROOFING
19.01 Roof truss of MS- steel tubular section panels including fasteners and purlin
19.02 Colour Heritage sheet for roofing
21 FLOORING WORK
21.01 Sand filling on control room
21.02 300mm thick stone soling with sand filler for base preparation on floor
21.03 PPC (1:3:6)work above stone soling
21.04 1:4 Cement sand plaster above PCC
21.05 3mm thick punning above plaster inside control room base
22 PLASTERING ON WALLS
22.01 12mm thick 1:4 CS plaster on wall and ceiling of control room
23 PAINTING
23.01 Painting to plastered walls, ceilings and outerwall in approved paint and color
24 METAL WORKS
24.01 Sliding Door
24.02 Gantry Crane
25 Boulder Lining
UNIT INITIAL REV-1 REV-2 BoQ REVISED BOQ Rev 2 IPC upto-10 RATE
321,564,170.75
528,183.40
SN DESCRIPTION OF WORK UNIT INITIAL REV-1 REV-2 BoQ
1 SITE CLEARANCE
Site Clearance work m2 30,063.62 25,737.02 25737.02
Site clearance including removal of 1503.48 737.11 2,970.11
vegetation around the inlet canal
Site clearance including removal of
1985.87 1,985.87 1983.31
vegetation
2 EARTHWORK
Excavation work in boulder and
2.01 5432.36 44524.744 41,187.38
gravel mixed soil with 50m lead
Excavation work in boulder and
2.02 gravel mixed soil upto formation level 1099.32
with a leadupto 100m lead
Excavation work in boulder and
2.03 gravel mixed soil with a leadupto 42719.8
100m lead
2.04 Hard rock excavation 3098.2 3,157.19 1,454.60
Excavation in boulder,gravel and
2.05 2050 1025.00 5,713.47
sand mixed soil
Compacted backfill with excavated
2.06 410 307.50 1,083.23
material under 301.1.2.1
Excavation work in boulder and
2.07 gravel mixed soil with a lead upto 200 5094.82 3217.835 2917.352
m
2.08 Disposal of Excavated material 10951.6 2734.801 2515
Compacted backfill with excavated
2.09 1341 684 360.00
material under 301.2.1
Backfill with compaction at foundation
2.1 114.96 114.957 114.957
base
Excavation work in boulder and
2.11 gravel mixed soil up to the formation 1594.02 1,570.02
level with a lead upto 50 m
2.12 Backfilling with excavated material 195.62 195.62 195.62
Compacted backfill from excavated
2.13 759.28 759.28 759.28
material under 402.1
2.14 Compacted backfill 18227.8 13949.69 9922.97
Compacted backfill under item no.
2.15 922.32 729.28 729.28
702.1
Excavation for boulder mixed soil with
2.16 1204.62 843.23 2815
50m lead
Excavation work in boulder and
2.17 gravel mixed soil upto the formation 578 578 578
level with 30m lead
Compacted back fill from the material
2.18 173.4 173.4 173.4
under 902.1
Excavation work excavation in soft
2.19 1909.57 1145.74 1145.74
soil up to the formation level
2.2 compacted backfill behind gabion wall 110.7
3 COFFER DAM
Filling with excavated riverbed
3.01 m³ 418.7 418.70 418.70
material from under item no.202.1
3.02 0.5 m thick boulder riprap m³ 42 42.00 30.00
Placing of geotextile underneath
3.03 m2 12.08 122.08
boulder riprap
4 CONCRETE WORK
Placing of 75mm thick C15 blindIng 1206.5
4.01 1113.44 1,018.21
concrete
4.02 Placing of C25 concrete 2716.53 2470.65 2,860.93
4.03 Placing C35 Concrete 106.15 96.59 76.59
4.04 Placing of C25 (40% Plum) 3591.17 3306.62 3,035.83
5 FORMWORK
Formwork including Centering and
5.01 2702.05 2276 2373
Shuttering
Form Work including Centering and
5.02 16787.27 11714.0956 11948.46
Shuttering as per Design level
6 REINFORCEMENT ton
6.01 Placing of reinforcement bar 272.69 214.232 232.88
Placing of Reinforcement bar for sub-
6.02 structure, super-structures and 88.84 83.55 91.5
machine foundations
8 JOINT DETAILS
Providing and laying of water bar at
8.01 rm 8.30 10.80 13.20
the joints
8.02 Joint sealent (25 mm thick) rm 94.48 94.48 84.48
8.03 Joint filler (25 mm thick) m2 244.7 126.49 126.51
Providing and laying of water bar
8.04 rm 225.49 104.09 114.09
Rear Guard S
Providing and laying of water bar
8.05 rm 303.63 238.97 230.97
Waterfoil or Hydrofoil
8.06 Joint sealent (20 mm thick) rm 431.50 286.50 286.5
8.07 Joint filler (20 mm thick) m2 299.29 188.69 183.03
8.08 Providing and laying of water bar rm 4 2.5 2.5
9 GABION WORKS
9.01 300 mm thick Gabion Matress m2 57.95 395.63 0
9.02 Gabion box m3 671.71 671.73 280
9.03 Gabion wall m3 715.96 965.96 476
10 STONE MASONRY
10.01 1:4 cement sand stone masonry m3 55 137.5 347.898
Stone masonry 1:4 for temporary
10.02 m3 9 9 9.00
support on juction
Dressed / Rubble stone masonry with
10.03 m3 81.58 325.5 210.5
1:4 cement sand mortar mortar
10.04 1:4 stone masonry 1864.05 1647.36 1547.44
1:4 Stone masonry wall on
10.05 550.77 165.23
superstructure
10.05 1:4 Brick wall
11 GEOTEXTILE
11.01 150gm/m2 Geotextile m2 3905.57 4126.26
12 BASE PREPARATION
Preparation of sub grade formation
12.01 level as per line and level as specified 2695.32 7456.34 2537.06
on the drawings
Preparation of sub grade formation
as per line and level as specified on m2 149
the drawings
Preparation of sub grade formation at
12.02 undersluice and inlet canal base as 408.62
per line
Preparation of sub grade formation
12.03 m2 1080.82 408.67 1281.66
level as per line and level
Preparation of sub grade as per line
12.04 m2 6091.06 1389.56 4000.00
and level specified on drawing
Preparation of sub grade as per line
12.041428571 m2 641.56
and level specified on drawing
Preparation of sub grade as per line
12.047857143 m2 829.5
and level specified on drawing
Preparation of sub grade as per line
12.05 and level specified on drawing, m³ 500.00 372.46
gravelling with 10-40mm gravel
13 MISCELLANEOUS WORKS
13.01 1m Ø boulder lining m³ 421.96 1749.49 1749
13.02 2m Ø boulder lining m³ 2499.27 421.96 205
13.03 0.5 m thick filter( coble and pebbles) m³ 1092.57 1092.57 842.57
13.04 0.25 m thick transition filter m³ 456.4 456.4 395
13.05 0.5 m thick clay blanket m³ 912.8 912.8 612
Construction drain arround the
13.06 LS 0 0
powerhouse
13.07 Fencing arround the power house LS 0 0
13.08 Earthing inside PH LS 0
stone soling including breaking of
13.09 Cum 3553.5
stone
13.1 0.5 m thick graded filter material m2
13.11 0.5 m Dia boulder riprap cum 33.480
13.12 0.3 m thick filter( coble and pebbles) cum 18.630
13.13 0.3 m thick clay blanket cum 8.820
0.3 m thick 20 mm down river bed
13.14 cum 9.620
gravel
13.15 0.3 m Dia stone soling cum 90.000
16 HDPE PIPE
16.01 225 mm dia semi perforated pipe rm 98.91 98.91 98.91
16.02 0.6 m dia Heavy Duty Hume pipe - 18.000
16.03 0.4 m dia. Heavy Duty HDPE Pipe -
17 BOULDER RIPRAP
17.0 0.5m to 1.0m boulder riprap m3 1474.56 288.90 205.00
1-2m boulder riprap at outlet of
17.02 m3 279.14 83.74 83.74
tailrace canal
18 MASONRY WALL
18.01 1:4 Stone masonry wall m³ 165.23 125
18.02 1:4 Brick wall m³ 0
19 ROOFING
Roof truss of MS- steel tubular
19.01 section panels including fasteners m 614.4 614.4 614.4
and purlin
19.02 Colour Heritage sheet for roofing m2 463.81 463.8144 463.8144
21 FLOORING WORK
21.01 Sand filling on control room m³ 9.35 9.35125 9.3513
300mm thick stone soling with sand
21.02 m³ 112.22 112.215 112.215
filler for base preparation on floor
21.03 PPC (1:3:6)work above stone soling m³ 28.05 28.05375 28.05375
21.04 1:4 Cement sand plaster above PCC m2 505.05 505.05 505.05
3mm thick punning above plaster
21.05 m2 505.05 505.05 505.05
inside control room base
22 PLASTERING ON WALLS
12mm thick 1:4 CS plaster on wall
22.01 m2 2502.86 2502.86 2502.86
and ceiling of control room
23 PAINTING
Painting to plastered walls, ceilings
23.01 and outerwall in approved paint and m2 2502.86 2502.86 2502.86
color
24 METAL WORKS
24.01 Sliding Door ton 0.9 0.9 0.9
24.02 Gantry Crane Kg 3400
25 Boulder Lining m³ 1257.41
REVISED
BOQ Rev IPC upto-10 RATE HUMLA Rev 2 IPC upto-10
2
340.00
0
340.00
0 24013.33
2,780.81 710.14 700.00 1946568.4 2,500.39
831.37 340.00
5713.47 1942579.8 5519.83456
- 250.00
1867.23 466807.5 988.17
4328.64879481482 340.00
3217.835 1094063.9 4328.64879481
2734.801 2360.59399481482 250.00 683700.25 2360.59399481
112.44 250.00
0
195.616 250.00
50 12500 195.616
340.00
1,570.02 533806.8
195.62 250 48905
759.28 250.00
959.28 239820 759.28
14852.867 - 250 3713216.75 1,775.63
- 250.00
3188 797000
709.45 340.00
2815 957100
340.00
0 0
0.00 250.00
173.4 43350
1,728.24 340.00
1837.24 624661.6
250.00
0
0
0
200.00 250.00
418.698 104674.5
42.00 40.00 2,650.00 111300
30.00 600.00
122.08 73248
0
0
329.08 9500
895.77 8509815
3808.48 3,329.74 21,300.00 81120687.9
96.59 68.98756 27,500.00 2656225
4448.628 2,199.65 15000 66729420
0
0
5,582.63 550.00
2434.44 1338942
3,454.34 550.00
13549.555 7452255.25
0
0
330.803 286.58 123,000.00 40688769
130.65 123000
141.72 17431560
0
0
13.15 1,500.00
13.10 19650
102.58 0.00 1,500.00 153870
126.49 33.50 2,000.00 252980
33.63 1,500.00
104.09 156135
131.50 2,000.00
254.97 509940
286.5 - 2,000.00 573000
188.69 22.32 2,000.00 377380
21 0.00 1,500.00 31500
0
0
449.26 0 600.00 269556
670.00 40.50 3,800.00 2546000
4193.96 1,581.25 3800 15937048
0
0
288 302.84 6,500.00 1871337
6.9 6,500.00
9 58500
375.13109 6,500.00
160 1040000
1794.63 7,519.12 6500 11665095
152.20 6500
0
- 0
0
0
12322.48 1,191.12 600.00 7393488
0
0
3,201.29 20.00
2028.66 40573.2
2,980.00 20.00
0
408.67 0
1080.82 20.00
1188.90 23778
1080.82 20.00
6011.63 120232.6
20.00
0
20
0
- 20.00
960 19200
0
0
1749.49 514.299 2,650.00 4636148.5
421.96 89.409 2,650.00 1118194
1092.57 301.854 2,650.00 2895310.5
456.4 137.0763 2,200.00 1004080
255.685 255.685 1,500.00 383527.5
-
0 0
0 - 0
0
127.82 145.00
0 0
400 - 2,200.00 880000
33.48 - 2,650.00 88722
18.63 - 2,650.00 49369.5
8.82 - 1,500.00 13230
-
9.62 2,200.00 21164
90 0.00 2,650.00 238500
0
0
34.32 0 4,500.00 154440
0 5,000.00
42.404 212020
0
0
30.064 1,800.00
43.914 79045.2
0
0
98.91 83.51 650.00 64291.5
18 - 0
36.893 - 0
0
0
288.9 0.00 2,650.00 765585
0.00 2,650.00
50 132500
0
0
457.099 152.20 6,500.00 2971143.5
75.859 - - 0
0
0
- 850.00
1786.58 1518593
749.554 - 1,500.00 1124331
0
0
2.5 - 180,000.00 450000
25.44 - 2,200.00 55968
100.535 - 2,500.00 251337.5
0
0
0 - 1,500.00 0
- 1,800.00
176.43 317574
31.42 - 9,500.00 298490
- 300.00
0 0
- 150.00
603.75 90562.5
0
0
- 320.00
2672.8 855296
0
0
- 150.00
2672.8 400920
0
0
0.9 0 160,000.00 144,000.00
160 0
339 2650 898350
0 0
196,469.42