Professional Documents
Culture Documents
Nog Energy Week 2023 May Floorplan
Nog Energy Week 2023 May Floorplan
VIP ENTRANCE
AC AC AC AC
TECHNICAL
NOG ENERGY SEMINAR
CLUB
AC AC
AC AC
AC AC
Exit AC AC
AC
AC
AC AC
3 3
F77 F70
E150 E152 E154 E156 E158 E159 E160 E161 E163 4
21ST CENTURY MARSHAL TIREX XIREA 3 SAVANNAH
AC AC
3 DESMI EVOLUTION PETAN OPEC 3 3 INTERNATIONAL HVPD
P&E
G4S
APPERAL 3 ENERGY
3 3 3 TRIUMPH
6 3 18m² POWER 6m² 9m²
B12 E118 E44 6.5 F76 6 AND F72
E144 GAS 2 CHINA
AIG
TARAPHENA 3 INTEGRATED 3 CASTOLIN YIKODEEN 3 3
INNOVATION
PETROLEUM
3 EUTECTIC UNION
9m² 9m² EXHIBITION
COLLECTION ACTOLOG
SOLUTIONS 3 METALOG 3 2
3 MAMTECH
3 BRICKS
3 SERVICES
SERVICES OIL & GAS 5 24m² 21m² 18m² 21m² 18m² 6 NAVANTE
9m² 6m² 18m²
4 7 6 7 6 3 2 3
AC
AC
EXHIBITION 18m² 15m²
4
2.5
6 5 5 5 5
2.5
18m²
CATERING B10 E112 2 2
5
BEIJING
E17 E18 E24 E26 E31 E32 E138 Exit
POWER 3
NIGERIAN 3 FIELDBASE
9m² SOLAR CONTENT
2
GENESIS 6 5 DEVELOPMENT FIRST MARINE 9m²
3 DC PREMIUM TURBINES F45
AC
AC
IKOSH LOGISTIC AND 7 7 AND ENGINEERING 7 E136 3 3
8 NIGERIA SOLUTIONS TREXM MONITORING SERVICES CE-STALONG F43 3 ASTM F57
LIMITED 25m² 9 3 RESOURCES
18m²
CHEMICALS BOARD
3
E22 (NCDMB) 9m² ROLNG 4
6m²
F46
2 42m² 35m² 35m² E134 6 TOPE
3 3 3
B09 32m² E14 D4 D1 3 FELPET 12m² SEL
E110
C. WOERMANN
F41
E11 7 JIMCOL 45m² 9m² 6m² 2
FAIRTEX 4 F47 F48
USA Pavilion
4 JULINAT E23 E132 MIE 3 18m²
TECHNICAL 5 3
GLOBAL
SECURITY
COLLECTIVE
3 F55
8
COLEMAN 20m² 9m² SOLUTIONS
POWER
AMAZON ENERGY
F40 BEIJING
12m²
NAOC 9 CABLE D3 6m² 3 POWER
CAVERTON
6m²
35m²
B06 15m² 8 EGS F49
E20 9m²
ENGINEERING AUTOMATION
2 CONCERNS
HANDS
11 40m² 20m² 6m² 3 ON
NIGERCHIN FACILITY
5 F50
32m² 54m²
5 5 15m² 9m²
9 8 OILSERV
SOLD 2
4 6 3 24m²
F39 3 JOLIVA F53
15m² 3 MIE
9 10 E130 6m²
E106 F51
E02 E10 CAKASA 6
9m²
F52
3 AMERICA
RESERVED 27m²
40m² 55m²
TRADE
3
CHINA
5 5 6m² INNOVATION
B05 8 WAV 2
EXH
AC AC AC
ENERGY
5 9m²
2 F30
CONFERENCE REGISTRATION 3 3 EXHIBITION REGISTRATION W/C
AC
4.
24
3 WAROM
41
8 7
ROOM
2
AC
2 6 GREENPEG
A04 4 SEFLAM 4
9 6
6 ND WESTERN 6
OPERATORS
50m²
PORTS AND
TERMINAL
A06 A18
AC
28m²
CONFERENCE 4
A14
18m²
INDIA PAVILION
F22 3
AC AC AC
F25
India Pavilion
A02 6 MIE 6
AC
9 TOTALENERGIES 9 6m²
7
PE 7
AC AC AC
ENERGY
PYRAMID
18m²
7
AC
3 2 3
63m² 72m² 77m² 72m² F01 F07 F19
2 2 2 2 2
NIGERIAN UPSTREAM PETROLEUM REGULATORY
9 8 7 6
2.5 2
NIGERIAN MIDSTREAM & DOWNSTREAM
PETROLEUM REGULATORY AUTHORITY
14m²
2 7 F13
A01 BEIJING UEC NITONG
3
CORPORATION 2 63m² 9 PAULIC MATERIAL
14m² SAFETY.
3 6m²
COMMISSION (NUPRC)
18m²
18 2.218
F10
NEXUS
3 ALLIANCE
6m²
F11 F12
3 NEXUS
ALLIANCE
NEXUS
ALLIANCE 3
6m² 6m²
3 3
2 2
54m²
3.2 54m²
3 3
AC
AC AC AC AC AC AC
Exit