Transfopower Industries (Pvt) Ltd 2-KM Katar Bund Road, off Multan Road, Thokar Niaz Baig Lahore

Billing Report (Now To 12 Months Age)


Meter Information:
1.Consumer Identification ###############
2.Meter Serial No. 00010749
3.Programmer Identification admin
4.Current Date 07.06.23
5.Current time 07:38:44
6.Current Season 02

Revenue Date(2023-6)
Energy:
1.Import Total kWh 000664.51 kWh
2.Import kWh Rate|T1 000135.73 kWh
3.Import kWh Rate|T2 000528.78 kWh
4.Import kWh Rate|T3 000000.00 kWh
5.Import kWh Rate|T4 000000.00 kWh

6.Export Total kWh 001082.71 kWh


7.Export kWh Rate|T1 000000.16 kWh
8.Export kWh Rate|T2 001082.55 kWh
9.Export kWh Rate|T3 000000.00 kWh
10.Export kWh Rate|T4 000000.00 kWh

11.Import Total kvarh 000330.76 kvarh


12.Import kvarh Rate|T1 000074.78 kvarh
13.Import kvarh Rate|T2 000255.98 kvarh
14.Import kvarh Rate|T3 000000.00 kvarh
15.Import kvarh Rate|T4 000000.00 kvarh

16.Export Total kvarh 000262.65 kvarh


17.Export kvarh Rate|T1 000019.67 kvarh
18.Export kvarh Rate|T2 000242.98 kvarh
19.Export kvarh Rate|T3 000000.00 kvarh
20.Export kvarh Rate|T4 000000.00 kvarh

Maximum Demand:
1.Import Maximum KW Date & Time 00.00KW 00.00.00 00:00:00
2.Import Maximum KW T1 Date & Time 00.00KW 00.00.00 00:00:00

- 1 -