Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

SHREEYASH PRATISHTHAN’S

SHREEYASH COLLEGE OF ENGINEERING AND TECHNOLOGY


(POLYTECHNIC), CHH. SAMBHAJINAGAR

MICRO-PROJECT REPORT

NAME OF DEPARTMENT: COMPUTER ENGINEERING


ACADEMIC YEAR: 2023-24
SEMESTER: 4TH
COURSE NAME: GUI APPLICATION DEV USING VB.NET
COURSE CODE: 22034
MICRO-PROJECT TITLE: HOSPITAL MANAGEMENT SYSTEM
PREPARED BY:
1) SUMIT ANANDRAO JOSHI EN. NO : 2210920111
2) KRUSHNA NAVNATH KALE EN. NO : 2210920115
3) VISHAL ASHOK KOLTE EN. NO : 2210920129

UNDER THE GUIDANCE OF:- PROF : P. D. TANGDE


MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION,
MUMBAI
CERTIFICATE
This is to certify that Mr./ Ms. SUMIT AANANDRAO JOSHI of 4
Semester of Diploma in COMPUTER ENGINEERING of Institute SHREEYASH COLLEGE
OF ENGINEERING & TECHNOLOGY (POLYTECHNIC) has successfully completed Micro-
Project Work in Course of GRAPHICAL USER INTERFACE
for the academic year 2023-24 as prescribed in the I-Scheme Curriculum.

Date : Enrollment No : 2210920111


Place : Exam Seat No : 449571

PROF: P. D. TANGDE PROF: A.C NAIK PROF: S.S KHANDAGALE


Signature Signature Signature
Guide HOD Principal

Seal of Institute
ACKNOWLEDGEMENT
We wish to express our profound gratitude to our guide PROF: P. D.
TANGDE who guided us endlessly in framing and completion of Micro-Project.
She guided us on all the main points in that Micro-Project. We are indebted to
her constant encouragement, cooperation and help. It was her enthusiastic support
that helped us in overcoming of various obstacles in the Micro-Project.
We are also thankful to our Principal S. S. KHANDAGALE & HOD
A. C. NAIK, Faculty Members and classmates for extending their support and
motivation in the completion of this Micro-Project.

1) SUMIT ANANDRAO JOSHI EN. NO : 2210920111


2) KRUSHNA NAVNATH KALE EN. NO : 2210920115
3) VISHAL ASHOK KOLTE EN. NO : 2210920129
Annexure-1
Micro-Project Proposal
(Format or Micro-Project Proposal about1-2pages)

Title of Micro-Project
HOSPITAL MANAGEMENT SYSTEM

1.0 Aims/Benefits of the Micro-Project (minimum30-50words)


The main objective of the VB.Net Project on Hospital Management System is to manage the
details of Doctors, Hospitals, Patient, Appointments, Medicines. It manages all the
information about Doctors, Nurses, Medicines, Doctor.

2.0 Course Outcomes Addressed


a) Use Visual Studio IDE to design application.
b) Develop GUI Application using Form Controls and its events.
c) Apply Object Oriented concepts in GUI Application.
d) Use Data access controls to store data in Database and retrieve it.
e) Use Data Binding in GUI Application.

3.0 Proposed Methodology (Procedure in brief that will be followed to do the micro-
project) in about 100 to 200 words).

In this project we have develop computer hospital management system project and shows you how
they apply to a everything in the hospital. We searched the micro project topics related to subject. Then
selected micro project title. After selection of topic searched and collected information related to selected
topic and we make proposal of the project.
Annexure-1

4.0 Action Plan (Sequence and time required for major activity. The following is for Reference, The
Activities can be Added / reduced / Modified )

Name of
Sr. Planned Planned Responsible
Details of activity
No. Week Start Finish Team Members
date date
1 1 &2 Discussion & Finalization of 15/01/2024 17/01/2024 All Members
Topic
2 3 Preparation of the Abstract 20/01/2024 22/01/2024 Krushna Kale
3 4 Literature Review 25/01/2024 27/01/2024 Krushna Kale
4 5 Submission of Microproject 29/01/2024 31/01/2024 All Members
Proposal ( Annexure-I)
5 6 Collection of information about 01/02/2024 03/02/2024 Sumit Joshi
Topic
6 7 Collection of relevant content / 05/02/2024 07/02/2024 Vishal Kolte
materials for the execution of
Microproject.
7 8 Discussion and submission of 10/02/2024 12/02/2024 All Members
outline of the Microproject.
8 9 Analysis / execution of 20/02/2024 22/02/2024 All Members
Collected data / information and
preparation of Prototypes /
drawings / photos / charts /
graphs / tables / circuits / Models
/ programs etc.
9 10 Completion of Contents of 01/03/2024 03/03/2024 Sumit Joshi
Project Report
10 11 Completion of Weekly progress 10/03/2024 12/03/2024 Vishal Kolte
Report
11 12 Completion of Project Report ( 11/04/2024 11/04/2024 All Members
Annexure-II)
12 13 Viva voce / Delivery of
Presentation

5.0 Resources Required (major resources such as raw material, some machining facility,
software etc.)

Sr. Name of Resources / Materials Specification Qty Remarks


No.
1 Bridge 2
2 PC Windows 11 4
3 Smart phone Android 13 2

NAMES OF TEAM MEMBERS WITH EN. NOS.


1) SUMIT ANANDRAO JOSHI EN. NO : 2210920111
2) KRUSHNA NAVNATH KALE EN. NO : 2210920115
3) VISHAL ASHOK KOLTE EN. NO : 2210920129
(To be approved by the concerned teacher)
Annexure-II

Micro-Project Report
Format for Micro-Project Report (Minimum 4 pages)

Title of Micro-Project:-

1.0 Rationale (Importance of the project, in about 30 to 50words.This is a modified version of


the earlier one written after the work)
VB.NET is the programming language based on Object Oriented Concepts
which is prominently used to develop GUI based Applications. Graphical User Interface
(GUI) based application includes various user friendly controls to accept or display data.
This course will give the students an in-depth understanding of the concepts used in
VB.NET and necessary skills to use programming techniques to develop .NET based
applications and deploy the same.

2.0 Aims/Benefits of the Micro-Project:- (In about 50 to 150 words)

The main objective of the VB.Net Project on Hospital Management System is to manage the
details of Doctors, Hospitals, Patient, Appointments, Medicines. It manages all the information –
about Doctors, Nurses, Medicines, Doctor.

3.0 Course Outcomes Achieved (Add to the earlier list if more Cos are addressed)
a) Use Visual Studio IDE to design application.
b) Develop GUI Application using Form Controls and its events.
c) Apply Object Oriented concepts in GUI Application.
d) Use Data access controls to store data in Database and retrieve it.
e) Use Data Binding in GUI Application.

1.1 Literature Review:- ( you can include all the resources which you have used to gather the information
for the Micro-project)

Sample:-

1) GRAPHICAL USER INTERFACE TECHNICAL PUBLICATION


2) GRAPHICAL USER INTERFACE TECH KNOWLEDGE PUBLICATION

5.0 Actual Methodology Followed (Write step wise work done, data collected and its analysis
(if any).The contribution of individual member may also be noted.)

In this project we have develop computer hospital management system project and shows you how
they apply to a everything in the hospital. We searched the micro project topics related to subject. Then
selected micro project title. After selection of topic searched and collected information related to selected
topic and we make proposal of the project.
6.0 Actual Resources Used (Mention the actual resources used).

sr.
Name of Resource/material Specifications Qty Remarks
No.

1 Bridge 2

PC Windows 11 4
2
Smart Phones Android 13 2
3

7.0 Outputs of the Micro-Projects


1) Drawing of the prototype, drawings of the survey, presentation of collected
data/findings/observation. outputs.
2) Generated information visually in form of appropriate drawings/tables/charts/graphs.
3) Draw/design the prototype/model/of the desired equipment/instrument/machine part etc.

8.0 Skill Developed/Learning outcome of this Micro-Project


(It is not necessary that every micro-project should develop all the following skill/abilities/outcomes.
However, some of the abilities mentioned below may be common in many of the micro-projects. Hence, you
have to select appropriately form the following and you can select others also)

1) IDENTIFYING : identifying the problem and course of problem in the area related and prepare
project proposals before starting the project.
2) SERIVE : Derive different possible solutions creatively.
3) DATA COMMUNICATION : Collect relevant data from different sources (books/the internet/the
market/suppliers/experts and other through survey/interviews).
4) DESIGNING : Designing micro project with minimum required resources (low cost).
5) DEVELOPING : Develop the prototype/model/ of the desired equipment/ machine part etc.
6) TEAMWORK : Learn to work in a team and boost individual confidence.
7) TIME MANAGEMENT : Timely completion of micro project as scheduled.
8) DATA ANALYSIS : Interpretation of data, drawing and analysis of laboratory calculations etc.
9) PROBLEM-SOLVING : Develop good problem-solving skills.
10) SAFETY : Incorporate safety features in products.
11) TECHNICAL WRITING : Prepare a report of the proposed plan and final report.
12) PRESENTATION AND COMMUNICATION SKILLS : Giving working model presentation of
the micro project.
13) CONFIDENCE : Confidently, answer the questions asked about the project.
14) ACKNOWLEDGEMTNT : Acknowledge the help rendered by others in the success of the project.

9.0 Applications of this Micro-Project:- (In about 30 to 50 words)

A hospital management system (HMS) can be used in a GUI application to help users perform functions
such as: Admin login, Patient details, Doctor details, Room details, and Services.
Annexure-IV
MICRO-PROJECT EVOLUTION SHEET

NAME OF STUDENT : SUMIT ANANDRAO JOSHI EN. NO : 2210920111


NAME OF PROGRAM: COMPUTER ENGINEERING SEMESTER : 4TH
COURSE NAME: GRAPHICAL USER INTERFACE COURSE CODE: 22034
TITLE OF THE MICRO-PROJECT : HOSPITAL MANAGEMENT SYSTEM

COURSE OUTCOMES ACHIEVED:-


a) Use Visual Studio IDE to design application.
b) Develop GUI Application using Form Controls and its events.
c) Apply Object Oriented concepts in GUI Application.
d) Use Data access controls to store data in Database and retrieve it.
e) Use Data Binding in GUI Application.

Sr. Poor Average Good Excellent Sub


Characteristic to be
No. assessed (Marks1-3) (Marks4-5) (Marks 6-8) (Marks9-10) Total

(A) Process and Product Assessment (Convert Below total marks out of 6Marks)
1 Relevance to the course
2 Literature
Review/information
collection
3 Completion of the Target
as Per project proposal
4 Analysis of Data and
representation
5
Quality of Prototype/Model
6 Report Preparation
(B) Individual Presentation/Viva(Convert Below total marks out of 4 Marks)
7 Presentation
8
Viva

(A) (B)
Process and Product Individual Presentation/ Total Marks
Assessment (6 marks) Viva (4 marks) 10

Comments/Suggestions about team work/leadership/inter-personal communication (if any)


__________________________________________________________________________________________
__________________________________________________________________________________________
_______________________________________________________________________________________

Name of Course Teacher: P. D. TANGDE

Dated Signature:-__________________

You might also like