Professional Documents
Culture Documents
Annex c.4 Fire Protection Drawings
Annex c.4 Fire Protection Drawings
Annex c.4 Fire Protection Drawings
PPIN SI
LI
T
I
PH
IN SURA
NC
E
CO N
RPORATI O
PARTIAL
A-3 AS-FOUND SECOND FLOOR PLAN
OFFICE OF THE BUILDING OFFICIAL
A-3a AS-FOUND SECOND FLOOR PLAN
PARTIAL
A-7 PROPOSED SECOND FLOOR PLAN
GENERAL NOTES
LEGEND & ABBREVIATIONS
A-7a PROPOSED SECOND FLOOR PLAN
PARTIAL
A-8 PROPOSED ROOF PLAN
REAR ELEVATION
A-12
A-13 PARTIAL
LEFT SIDE ELEVATION LAND USE & ZONING
A-13a LEFT SIDE ELEVATION
PARTIAL
A-14 RIGHT SIDE ELEVATION
PARTIAL
A-15 LONGITUDINAL SECTION
PARTIAL
A-17 GROUND FLOOR REFLECTED CEILING PLAN
PARTIAL
A-18 SECOND FLOOR REFLECTED CEILING PLAN
PARTIAL
A-22 SECOND FLOOR PATTERN LAY OUT
PARTIAL
A-25 GROUND FLOOR WALL PATTERN LAYOUT
GROUND FLOOR
A-34 FEMALE PUBLIC TOILET 1,2,3
GROUND FLOOR
FEMALE PUBLIC TOILET 4, 5 STRUCTURAL
A-35 SECOND FLOOR
FEMALE PUBLIC TOILET 6
GROUND FLOOR
FEMALE PUBLIC TOILET 7, 8
A-36 TYPICAL 3RD TO 8TH FLOOR
FEMALE PUBLIC TOILET 9, 10
GROUND FLOOR
A-37 MALE PUBLIC TOILET 1,2,3
GROUND FLOOR
FEMALE PUBLIC TOILET 4, 5
A-38 SECOND FLOOR
FEMALE PUBLIC TOILET 6
GROUND FLOOR
MALE PUBLIC TOILET 7, 8
A-39 TYPICAL 3RD TO 8TH FLOOR
MALE PUBLIC TOILET 9, 10
GROUND FLOOR
A-40 EXEC. TOILET 1, 2, 3, 4, 5, 6, 7
KEY PLAN
SECOND FLOOR
EXEC. TOILET 8, 9, 10, 11, 12, 13
A-41 TYP. 3RD TO 8TH FLOOR PLUMBING
EXEC. TOILET 14, 15
CANTEEN TOILET
CLINIC TOILET
OFFICE OF THE BOARD CHAIRMAN
A-42 OFFICE OF THE EVP AND COO
OFFICE OF THE PRESIDENT T&B
KEY PLAN
A-44 SIGNAGES
MECHANICAL
CONSULTANT OWNER APPROVED BY: PROJECT TITLE SHEET CONTENT/S : ISSUE NO. REVISIONS NO. DATE DATE SHEET NO.
GENERAL NOTES
ENGINEERS * PLANNERS * CONSULTANTS CYRUS T. GALANG IN CHINO ROCES EQUIPMENT SCHEDULE
FP-01
INSURA
CHECKED BY:
PTR NO.: 2464195 D PRC NO. : 2736 VICE PRESIDENT FHC & FEX SCHEDULE
3431 GUERNICA ST., PALANAN, MAKATI CITY ADMINISTRATIVE SERVICES GROUP SPRINKLER SCHEDULE APPROVED BY:
NC
F
5000
5000
3900
GYM GENSET ROOM
58.00 SQ.M
3900
12.30 SQ.M
1000
900
2000
4000
46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31
06
EXIT RAMP UP
05
40980
6750
7600
04
LOW CHB
FENCE
4250
03 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
02 7001
5150
4131
15 14 13 12 11 10 09 08 07 06 05 04 03 02 01
01 10.00 SQ.M
16.00 SQ.M
4600
9.60 SQ.M
6850
6600
7100
7350
CONSULTANT OWNER APPROVED BY: PROJECT TITLE SHEET CONTENT/S : ISSUE NO. REVISIONS NO. DATE DATE SHEET NO.
INE DEPOS
DESIGNED BY: RDAEC
RAMON D. AGUILOS LI
PP GROUND FLOOR PLAN
E. H. SISON ENGINEERS, CO. RENOVATION OF PDIC BUILDING
IT
I
CHECKED BY:
PTR NO.: 2464195 D PRC NO. : 2736 VICE PRESIDENT
3431 GUERNICA ST., PALANAN, MAKATI CITY ADMINISTRATIVE SERVICES GROUP
APPROVED BY:
NC
6744 4500 7630 8000 8000 8000 8000 8000 8000 7750
3230
EXIT EXIT
5000
3900
6
4350
85
3900
10
900
49 48 47
4000
64 63 62 61 60 59 58 57 56 55 54 53 52 51 50
7600
40980
6750
6250
4201
4250
65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
4600
5150
97 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82
6600
7350
CONSULTANT OWNER APPROVED BY: PROJECT TITLE SHEET CONTENT/S : ISSUE NO. REVISIONS NO. DATE DATE SHEET NO.
INE DEPOS
DESIGNED BY: RDAEC
RAMON D. AGUILOS LI
PP SECOND FLOOR PLAN
E. H. SISON ENGINEERS, CO. RENOVATION OF PDIC BUILDING
IT
I
CHECKED BY:
PTR NO.: 2464195 D PRC NO. : 2736 VICE PRESIDENT
3431 GUERNICA ST., PALANAN, MAKATI CITY ADMINISTRATIVE SERVICES GROUP
APPROVED BY:
NC
3230
1 1
5000
1
1 1 2 2 2
3
1 1 D
8-a
PWD
5250
4000
6750
4250
3 4
PWD
5150
3 5
3
3
PWD PWD
7350
CONSULTANT OWNER APPROVED BY: PROJECT TITLE SHEET CONTENT/S : ISSUE NO. REVISIONS NO. DATE DATE SHEET NO.
INE DEPOS
DESIGNED BY: RDAEC
RAMON D. AGUILOS LI
PP THIRD FLOOR PLAN
E. H. SISON ENGINEERS, CO. RENOVATION OF PDIC BUILDING
IT
I
CHECKED BY:
PTR NO.: 2464195 D PRC NO. : 2736 VICE PRESIDENT
3431 GUERNICA ST., PALANAN, MAKATI CITY ADMINISTRATIVE SERVICES GROUP
APPROVED BY:
NC
3230
4
5000
4 4 6
7
4
PWD
5250
BSD
4000
24 STAFF
CPG CG
33 STAFF
22 STAFF
CLG REG
69 STAFF 61 STAFF
40980
6750
5
5
4250
PWD
10
5150
8 9
5
5
PWD
ISO
7350
CONSULTANT OWNER APPROVED BY: PROJECT TITLE SHEET CONTENT/S : ISSUE NO. REVISIONS NO. DATE DATE SHEET NO.
INE DEPOS
DESIGNED BY: RDAEC
RAMON D. AGUILOS LI
PP FOURTH FLOOR PLAN
E. H. SISON ENGINEERS, CO. RENOVATION OF PDIC BUILDING
IT
I
CHECKED BY:
PTR NO.: 2464195 D PRC NO. : 2736 VICE PRESIDENT
3431 GUERNICA ST., PALANAN, MAKATI CITY ADMINISTRATIVE SERVICES GROUP
APPROVED BY:
NC
3230
6
5000
11 6 12
6 6
PWD
5250
4000
MANAGER MANAGER
ID I
LSD II
LEGAL HRG
56 STAFF ASG 67 STAFF
64 STAFF
40980
6750
13
7
7
4250
PWD
5150
7
7
PWD
7350
CONSULTANT OWNER APPROVED BY: PROJECT TITLE SHEET CONTENT/S : ISSUE NO. REVISIONS NO. DATE DATE SHEET NO.
INE DEPOS
DESIGNED BY: RDAEC
RAMON D. AGUILOS LI
PP FIFTH FLOOR PLAN
E. H. SISON ENGINEERS, CO. RENOVATION OF PDIC BUILDING
IT
I
CHECKED BY:
PTR NO.: 2464195 D PRC NO. : 2736 VICE PRESIDENT
3431 GUERNICA ST., PALANAN, MAKATI CITY ADMINISTRATIVE SERVICES GROUP
APPROVED BY:
NC
3230
5000
WARNING WARNING
NOVEC 1230 GAS NOVEC 1230 GAS
WHEN ALARM OPERATES WHEN ALARM OPERATES
VACATE IMMEDIATELY DO NOT ENTER UNTIL VENTILATED
5250
WARNING
4000
6750
4250
5150
7350
CONSULTANT OWNER APPROVED BY: PROJECT TITLE SHEET CONTENT/S : ISSUE NO. REVISIONS NO. DATE DATE SHEET NO.
INE DEPOS
DESIGNED BY: RDAEC
RAMON D. AGUILOS LI
PP ROOF DECK FLOOR PLAN
E. H. SISON ENGINEERS, CO. RENOVATION OF PDIC BUILDING
IT
I
VALVE DESCRIPTION
FP
1
JP
1
CONSULTANT OWNER APPROVED BY: PROJECT TITLE SHEET CONTENT/S : ISSUE NO. REVISIONS NO. DATE DATE SHEET NO.
INE DEPOS
DESIGNED BY: RDAEC
RAMON D. AGUILOS LI
PP FIRE PROTECTION SCHEMATIC RISER DIAGRAM
E. H. SISON ENGINEERS, CO. RENOVATION OF PDIC BUILDING
IT
I
CHECKED BY:
PTR NO.: 2464195 D PRC NO. : 2736 VICE PRESIDENT
3431 GUERNICA ST., PALANAN, MAKATI CITY ADMINISTRATIVE SERVICES GROUP
APPROVED BY:
NC
04
3000
2700
300
300
10900
CONSULTANT OWNER APPROVED BY: PROJECT TITLE SHEET CONTENT/S : ISSUE NO. REVISIONS NO. DATE DATE SHEET NO.
INE DEPOS
DESIGNED BY: RDAEC
RAMON D. AGUILOS LI
PP FIRE PUMP ARRANGEMENT DETAILS
E. H. SISON ENGINEERS, CO. RENOVATION OF PDIC BUILDING
IT
I
CHECKED BY:
PTR NO.: 2464195 D PRC NO. : 2736 VICE PRESIDENT
3431 GUERNICA ST., PALANAN, MAKATI CITY ADMINISTRATIVE SERVICES GROUP
APPROVED BY:
NC
CONSULTANT OWNER APPROVED BY: PROJECT TITLE SHEET CONTENT/S : ISSUE NO. REVISIONS NO. DATE DATE SHEET NO.
INE DEPOS
DESIGNED BY: RDAEC
RAMON D. AGUILOS LI
PP MISCELLANEOUS DETAILS
E. H. SISON ENGINEERS, CO. RENOVATION OF PDIC BUILDING
IT
I
CHECKED BY:
PTR NO.: 2464195 D PRC NO. : 2736 VICE PRESIDENT
3431 GUERNICA ST., PALANAN, MAKATI CITY ADMINISTRATIVE SERVICES GROUP
APPROVED BY:
NC